INDOT contract B-43921-A bid tabulation
BRIDGE DECK REPLACEMENT. Let by Indiana DOT on October 8, 2025, Lake, LaPorte. 5 bids received; low bid $2,322,506 by F H Paschen S N Nielsen & Associates LLC.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 97
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | F H Paschen S N Nielsen & Associates LLC | $2,322,506 | Low |
| 2 | Superior Construction Co Inc | $2,457,243 | +6.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $2,657,440 | +14% |
| 4 | Dunnet Bay Construction Company | $2,780,697 | +20% |
| 5 | Milestone Contractors LP | $2,894,984 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. F H Paschen S N Nielsen & Associates LLC | 2. Superior Construction Co Inc | 3. Rieth-Riley Construction Co., Inc. | 4. Dunnet Bay Construction Company | 5. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $150,000 | $40,724 | $36,000 | $189,621 | $45,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $116,000 | $123,000 | $132,500 | $140,000 | $150,000 |
| 0009 | Clearing and grubbing (201-01015) | LS | 1 | $6,600.00 | $23,000 | $33,000 | $80,000 | $8,000.00 |
| 0010 | Pavement removal (202-02240) | SYS | 100.20 | $47.22 | $28.57 | $86.00 | $50.00 | $60.50 |
| 0011 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $250,000 | $500,000 | $240,000 | $375,000 | $300,000 |
| 0012 | Slopewall, remove (202-51368) | SYS | 38 | $231.70 | $140.00 | $85.00 | $30.00 | $110.00 |
| 0013 | Curb, asphalt, remove (202-94749) | LFT | 308 | $6.78 | $7.00 | $10.00 | $3.00 | $9.50 |
| 0014 | Excavation, common (203-02000) | CYS | 112 | $78.36 | $60.00 | $100.00 | $100.00 | $130.00 |
| 0015 | Linear grading (203-08607) | LFT | 308 | $13.11 | $3.00 | $11.00 | $25.00 | $7.00 |
| 0016 | Excavation, dry (206-51225) | CYS | 15 | $89.10 | $75.00 | $150.00 | $50.00 | $165.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 370 | $36.33 | $65.00 | $51.00 | $55.00 | $80.00 |
| 0018 | Aggregate for end bent backfill (211-06467) | CYS | 26 | $100.29 | $110.00 | $113.00 | $450.00 | $220.00 |
| 0019 | Geotextile for pavement, type 2B (214-12239) | SYS | 370 | $5.19 | $9.00 | $3.50 | $5.00 | $6.75 |
| 0020 | Compacted aggregate, no. 53 (301-12234) | CYS | 62 | $57.48 | $105.00 | $93.50 | $90.00 | $71.00 |
| 0021 | Subbase for PCCP (302-06464) | CYS | 32.90 | $204.99 | $150.00 | $120.40 | $150.00 | $215.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 41 | $46.48 | $65.00 | $83.00 | $95.00 | $130.50 |
| 0023 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 313 | $9.10 | $8.00 | $16.00 | $12.00 | $25.00 |
| 0024 | Milling, transition (306-08043) | SYS | 600 | $6.80 | $8.00 | $16.00 | $7.00 | $13.00 |
| 0025 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 85 | $225.00 | $225.00 | $225.00 | $260.00 | $260.00 |
| 0026 | QC/QA-HMA, 3, 58S, intermediate, 9.5 MM (401-000020) | TON | 58 | $190.00 | $190.00 | $190.00 | $295.00 | $295.00 |
| 0027 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 183 | $155.00 | $155.00 | $155.00 | $185.00 | $185.00 |
| 0028 | Joint adhesive (401-11526) | LFT | 1,464 | $2.50 | $2.50 | $2.50 | $0.75 | $0.75 |
| 0029 | HMA wedge and level, type B (402-07451) | TON | 59 | $145.00 | $145.00 | $145.00 | $215.00 | $215.00 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,074 | $6.00 | $6.00 | $6.00 | $0.50 | $0.50 |
| 0031 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $500.00 | $500.00 | $500.00 | $0.01 | $650.00 |
| 0032 | Terminal joint, type HMA (503-12477) | LFT | 58 | $376.40 | $360.00 | $400.00 | $450.00 | $420.00 |
| 0033 | Guardrail, remove (601-02241) | LFT | 325 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0034 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 25 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 0035 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| 0036 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0037 | Barrier delineator (602-06729) | EACH | 12 | $31.87 | $27.55 | $28.00 | $27.55 | $27.55 |
| 0038 | Fence, chain link, reset (603-06065) | LFT | 20 | $164.00 | $164.00 | $164.00 | $164.00 | $164.00 |
| 0039 | Curb, concrete (605-06120) | LFT | 19 | $144.38 | $120.00 | $66.00 | $90.00 | $160.00 |
| 0040 | Curb and gutter, concrete, type B (605-06145) | LFT | 616 | $51.40 | $45.00 | $53.00 | $60.00 | $50.00 |
| 0041 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 131.30 | $173.28 | $150.00 | $165.00 | $170.00 | $275.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $990.00 | $990.00 | $990.00 | $1,890.00 | $990.00 |
| 0043 | Slopewall (616-06455) | SYS | 38 | $242.13 | $300.00 | $235.00 | $275.00 | $527.00 |
| 0044 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $20,000 | $14,000 | $14,000 | $13,000 | $13,000 |
| 0045 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $1,500.00 | $1,000.00 | $1,000.00 | $350.00 | $350.00 |
| 0046 | Clean steel bridge, top flanges, type QP-2, bridge no. 1 (619-12506) | LS | 1 | $20,000 | $15,000 | $15,000 | $13,000 | $13,000 |
| 0047 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $1,000.00 | $3,000.00 | $3,000.00 | $1,000.00 | $1,000.00 |
| 0048 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $550.00 | $600.00 | $600.00 | $600.00 | $550.00 |
| 0049 | Mulched seeding, type R (621-06559) | SYS | 245 | $4.88 | $3.00 | $3.00 | $3.00 | $4.88 |
| 0050 | Water (621-06567) | KGAL | 2 | $20.00 | $100.00 | $50.00 | $50.00 | $20.00 |
| 0051 | Field office, type C (628-09403) | MOS | 16 | $2,418.07 | $2,000.00 | $3,050.00 | $3,000.00 | $3,800.00 |
| 0052 | Computer system equipment (628-11976) | EACH | 2 | $778.11 | $500.00 | $350.00 | $550.00 | $500.00 |
| 0053 | Reinforcing bars, epoxy coated (703-06029) | LBS | 65,518 | $1.69 | $1.70 | $1.80 | $1.75 | $1.80 |
| 0054 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 28 | $50.04 | $45.00 | $60.00 | $45.00 | $75.00 |
| 0055 | Concrete, C, superstructure (704-51002) | CYS | 200.20 | $1,611.77 | $1,400.00 | $1,300.00 | $1,500.00 | $2,350.00 |
| 0056 | Railing, concrete type FC (706-11600) | CYS | 39.80 | $797.00 | $797.00 | $797.00 | $1,120.00 | $797.00 |
| 0057 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $2,500.00 | $2,500.00 | $6,000.00 | $2,500.00 |
| 0058 | Surface seal (709-51821) | LS | 1 | $9,800.00 | $2,062.20 | $1.00 | $9,800.00 | $3,000.00 |
| 0059 | Patching concrete structures (710-09158) | SFT | 602 | $130.00 | $130.00 | $135.00 | $120.00 | $130.00 |
| 0060 | Structural steel, field cut (711-04297) | SQIN | 483 | $40.00 | $18.00 | $28.20 | $20.50 | $40.00 |
| 0061 | Structural steel (711-51038) | LS | 1 | $300,000 | $400,000 | $400,000 | $350,000 | $419,250 |
| 0062 | Temporary support (711-51820) | LS | 1 | $30,000 | $0.01 | $85,000 | $60,000 | $50,000 |
| 0063 | Jacking and supporting beams (711-51877) | LS | 1 | $25,000 | $0.01 | $66,000 | $100,000 | $17,000 |
| 0064 | Stud shear connectors (711-96800) | EACH | 1,830 | $5.50 | $5.40 | $10.38 | $11.47 | $8.58 |
| 0065 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 100 | $24.96 | $12.00 | $17.50 | $20.00 | $20.00 |
| 0066 | Geotextile for underdrains, type 2B (718-12308) | SYS | 100 | $10.50 | $15.00 | $11.00 | $11.00 | $15.00 |
| 0067 | Longitudinal grooving (722-12732) | SYS | 804 | $5.92 | $7.00 | $7.50 | $7.00 | $4.66 |
| 0068 | Bridge expansion joint, type PCF (724-12773) | LFT | 58 | $51.06 | $56.00 | $63.00 | $1.00 | $120.00 |
| 0069 | Bearing assembly, elastomeric (726-92406) | EACH | 20 | $3,015.19 | $2,700.00 | $3,500.00 | $3,000.00 | $5,000.00 |
| 0070 | Road closure sign assembly (801-04308) | EACH | 5 | $344.00 | $344.00 | $344.00 | $344.00 | $344.00 |
| 0071 | Temporary pavement marking, 6 in. (801-06206) | LFT | 37,806 | $0.34 | $0.34 | $0.34 | $0.34 | $0.34 |
| 0072 | Detour route marker assembly (801-06625) | EACH | 28 | $183.00 | $183.00 | $183.00 | $183.00 | $183.00 |
| 0073 | Construction sign, type A (801-06640) | EACH | 55 | $274.00 | $274.00 | $274.00 | $274.00 | $274.00 |
| 0074 | Construction sign, type B (801-06645) | EACH | 12 | $118.00 | $118.00 | $118.00 | $118.00 | $118.00 |
| 0075 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 94 | $18.32 | $10.00 | $18.32 | $18.32 | $18.32 |
| 0076 | Maintaining traffic (801-06775) | LS | 1 | $110,811 | $200,000 | $386,000 | $140,000 | $250,000 |
| 0077 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $8,558.00 | $8,558.00 | $6,600.00 | $8,558.00 | $8,558.00 |
| 0078 | Barricade, type III-A (801-07118) | LFT | 40 | $18.01 | $18.01 | $18.01 | $18.01 | $18.01 |
| 0079 | Barricade, type III-B (801-07119) | LFT | 40 | $18.01 | $18.01 | $18.01 | $18.01 | $18.01 |
| 0080 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,128 | $47.24 | $20.00 | $36.00 | $34.00 | $75.00 |
| 0081 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 200 | $53.73 | $25.00 | $45.00 | $90.00 | $115.00 |
| 0082 | Law enforcement officer (801-12324) | HRS | 75 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0083 | Automated work zone information system (801-12544) | EACH | 2 | $17,550 | $17,550 | $17,550 | $17,550 | $17,550 |
| 0084 | Temporary buzz strips (801-97643) | LFT | 3,456 | $19.60 | $19.60 | $19.60 | $19.60 | $19.60 |
| 0085 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 1,600 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 0086 | Line, remove (808-06716) | LFT | 57,375 | $0.54 | $0.30 | $0.54 | $0.54 | $0.54 |
| 0087 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 5,780 | $1.44 | $0.80 | $1.44 | $1.44 | $1.44 |
| 0088 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 4,944 | $1.44 | $0.80 | $1.44 | $1.44 | $1.44 |
| 0089 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 729 | $1.68 | $0.90 | $1.68 | $1.68 | $1.68 |
| 0090 | Grooving for pavement markings (808-12032) | LFT | 3,200 | $0.85 | $0.50 | $0.85 | $0.85 | $0.85 |
| 0091 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 1,600 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 0092 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 164 | $21.45 | $10.00 | $21.45 | $21.45 | $21.45 |
| 0093 | Snowplowable raised pavement marker (808-75998) | EACH | 164 | $41.50 | $20.00 | $41.50 | $41.50 | $41.50 |
| 0094 | Stormwater management budget (205-12108) | DOL | 2,750 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0095 | Stormwater management implementation (205-12616) | LS | 1 | $2,501.00 | $4,000.00 | $6,600.00 | $6,500.00 | $4,000.00 |
| 0096 | Field drilled hole in concrete (702-51863) | EACH | 160 | $25.02 | $22.00 | $20.00 | $20.00 | $30.00 |
| 0097 | Drilled hole (711-51864) | EACH | 300 | $86.00 | $40.00 | $62.00 | $36.74 | $86.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.