INDOT contract R-42311-A bid tabulation
BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on September 2, 2026, Lake, LaPorte. 5 bids received; low bid $2,543,931 by Grimmer Construction Inc.
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 54
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Grimmer Construction Inc | $2,543,931 | Low |
| 2 | F H Paschen S N Nielsen & Associates LLC | $2,784,812 | +9.0% |
| 3 | Milestone Contractors LP | $2,845,000 | +12% |
| 4 | Gariup Construction Co Inc | $2,879,500 | +13% |
| 5 | Rieth-Riley Construction Co., Inc. | $2,989,655 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Grimmer Construction Inc | 2. F H Paschen S N Nielsen & Associates LLC | 3. Milestone Contractors LP | 4. Gariup Construction Co Inc | 5. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $20,700 | $149,478 | $21,500 | $25,310 | $114,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $635.00 | $2,596.86 | $2,200.00 | $4,500.00 | $2,100.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 2 | $635.00 | $2,271.48 | $1,525.00 | $3,500.00 | $1,800.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $100,000 | $139,200 | $89,000 | $280,000 | $259,000 |
| 0010 | Tree, 6 in., remove (201-02245) | EACH | 3 | $549.00 | $500.00 | $525.00 | $550.00 | $900.00 |
| 0011 | Tree, 10 in., remove (201-02250) | EACH | 2 | $824.00 | $1,000.00 | $700.00 | $800.00 | $1,500.00 |
| 0012 | Tree, 18 in., remove (201-02255) | EACH | 1 | $2,200.00 | $2,000.00 | $650.00 | $2,600.00 | $2,500.00 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $94,000 | $55,000 | $57,000 | $25,000 | $86,000 |
| 0014 | Excavation, common (203-02000) | CYS | 2,757 | $40.00 | $54.22 | $55.00 | $59.00 | $55.00 |
| 0015 | Excavation, unclassified (203-02020) | CYS | 2,493 | $34.00 | $52.91 | $58.00 | $70.00 | $55.00 |
| 0016 | Borrow (203-02070) | CYS | 1,524 | $49.00 | $36.37 | $57.00 | $62.00 | $10.00 |
| 0017 | Stormwater management budget (205-12108) | DOL | 104,752.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $16,500 | $5,000.00 | $77,025 | $23,500 | $86,000 |
| 0019 | SWQCP preparation (205-12618) | LS | 1 | $2,140.00 | $2,500.00 | $2,500.00 | $4,000.00 | $3,610.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 13,575 | $40.00 | $37.51 | $50.00 | $40.00 | $50.00 |
| 0021 | B borrow (211-02050) | CYS | 1,861 | $28.00 | $50.81 | $55.00 | $63.00 | $10.00 |
| 0022 | Geogrid, type IB (214-11796) | SYS | 2,320 | $2.00 | $1.78 | $7.50 | $5.00 | $2.30 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 4,091 | $50.00 | $38.30 | $40.00 | $52.00 | $12.00 |
| 0024 | Asphalt for tack coat (406-05520) | TON | 10.60 | $1,025.00 | $1,025.00 | $1,025.00 | $635.00 | $600.00 |
| 0025 | Fence , and post 42 inch, split rail concrete (603-03829) | LFT | 100 | $494.00 | $450.00 | $251.52 | $475.00 | $450.00 |
| 0026 | Fence gate, chain link, 48 in. X 24 FT (603-97283) | EACH | 1 | $4,540.00 | $4,135.00 | $7,453.00 | $4,375.00 | $4,135.00 |
| 0027 | Fence, chain link, PVC coated, 48 in. (603-98225) | LFT | 320 | $66.00 | $60.00 | $68.45 | $64.00 | $60.00 |
| 0028 | HMA for sidewalk (604-05528) | TON | 235 | $123.00 | $123.00 | $123.00 | $127.00 | $120.00 |
| 0029 | HMA for approaches, type B (610-07487) | TON | 5,700 | $113.00 | $113.00 | $113.00 | $115.00 | $105.00 |
| 0030 | Bicycle rack (618-04181) | EACH | 2 | $2,470.00 | $2,007.52 | $4,750.00 | $2,380.00 | $2,250.00 |
| 0031 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $675.00 | $450.00 | $450.00 | $750.00 | $675.00 |
| 0032 | Seeding wetland (621-02356) | LBS | 1 | $350.00 | $350.00 | $350.00 | $370.00 | $350.00 |
| 0033 | Seed mixture, native (621-03909) | LBS | 45 | $1,080.00 | $1,080.00 | $1,080.00 | $1,150.00 | $1,080.00 |
| 0034 | Fertilizer for permanent seeding (621-06545) | TON | 0.10 | $1,100.00 | $1,100.00 | $1,100.00 | $1,165.00 | $1,100.00 |
| 0035 | Seed mixture, type U (621-06554) | LBS | 33 | $7.00 | $7.00 | $7.00 | $7.50 | $7.00 |
| 0036 | Mulching material (621-06565) | TON | 0.50 | $642.00 | $585.00 | $585.00 | $620.00 | $585.00 |
| 0037 | Water (621-06567) | KGAL | 264 | $110.00 | $100.00 | $100.00 | $106.00 | $100.00 |
| 0038 | Field office, type C (628-09403) | MOS | 12 | $3,500.00 | $2,737.77 | $2,200.00 | $3,275.00 | $3,000.00 |
| 0039 | Computer system equipment (628-11976) | EACH | 2 | $1,100.00 | $583.58 | $950.00 | $650.00 | $600.00 |
| 0040 | Topsoil processing and distribution (629-000149) | SYS | 18,102 | $6.00 | $6.35 | $9.10 | $5.30 | $5.00 |
| 0041 | Topsoil amendment budget (629-000150) | DOL | 36,204 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0042 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,000 | $2.00 | $1.81 | $2.50 | $3.75 | $1.81 |
| 0043 | Construction sign, type A (801-06640) | EACH | 10 | $191.00 | $191.00 | $225.00 | $185.00 | $191.00 |
| 0044 | Construction sign, type B (801-06645) | EACH | 3 | $101.00 | $101.00 | $175.00 | $175.00 | $101.00 |
| 0045 | Flashing arrow sign (801-06710) | DAY | 260 | $15.00 | $15.00 | $18.00 | $12.70 | $15.00 |
| 0046 | Maintaining traffic (801-06775) | LS | 1 | $40,000 | $149,144 | $36,097 | $11,500 | $273,000 |
| 0047 | Barricade, type III-A (801-07118) | LFT | 20 | $14.70 | $14.72 | $15.00 | $19.00 | $14.72 |
| 0048 | Temporary pedestrian channelizer (801-12862) | LFT | 20 | $37.20 | $37.21 | $37.50 | $88.50 | $13.92 |
| 0049 | Reference post (802-04893) | EACH | 16 | $350.00 | $200.00 | $200.00 | $212.00 | $200.00 |
| 0050 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 465 | $32.00 | $29.00 | $29.00 | $20.00 | $29.00 |
| 0051 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 135.30 | $30.00 | $32.00 | $32.00 | $23.50 | $32.00 |
| 0052 | Handhole, lighting (807-02191) | EACH | 6 | $2,612.00 | $2,100.00 | $2,100.00 | $2,225.00 | $2,100.00 |
| 0053 | Wire, no. 4 copper, 1/C (807-86843) | LFT | 100 | $14.00 | $21.25 | $21.25 | $22.50 | $21.25 |
| 0054 | Line, paint, solid, white, 12 in. (808-75015) | LFT | 16 | $8.25 | $8.23 | $4.00 | $5.30 | $8.23 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.