INDOT contract R-42311-A bid tabulation

BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on September 2, 2026, Lake, LaPorte. 5 bids received; low bid $2,543,931 by Grimmer Construction Inc.

Owner
Indiana DOT
Letting
02 SEP 2026
Pay items
54
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Grimmer Construction Inc$2,543,931Low
2F H Paschen S N Nielsen & Associates LLC$2,784,812+9.0%
3Milestone Contractors LP$2,845,000+12%
4Gariup Construction Co Inc$2,879,500+13%
5Rieth-Riley Construction Co., Inc.$2,989,655+18%
INDOT contract R-42311-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Grimmer Construction Inc2. F H Paschen S N Nielsen & Associates LLC3. Milestone Contractors LP4. Gariup Construction Co Inc5. Rieth-Riley Construction Co., Inc.
0001Construction engineering (105-06845)LS1$20,700$149,478$21,500$25,310$114,000
0002Inspection hole, deeper than 3 FT (107-09358)EACH2$635.00$2,596.86$2,200.00$4,500.00$2,100.00
0003Inspection hole, 3 FT deep or less (107-09367)EACH2$635.00$2,271.48$1,525.00$3,500.00$1,800.00
0004Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00
0005Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$100,000$139,200$89,000$280,000$259,000
0010Tree, 6 in., remove (201-02245)EACH3$549.00$500.00$525.00$550.00$900.00
0011Tree, 10 in., remove (201-02250)EACH2$824.00$1,000.00$700.00$800.00$1,500.00
0012Tree, 18 in., remove (201-02255)EACH1$2,200.00$2,000.00$650.00$2,600.00$2,500.00
0013Clearing right-of-way (201-52370)LS1$94,000$55,000$57,000$25,000$86,000
0014Excavation, common (203-02000)CYS2,757$40.00$54.22$55.00$59.00$55.00
0015Excavation, unclassified (203-02020)CYS2,493$34.00$52.91$58.00$70.00$55.00
0016Borrow (203-02070)CYS1,524$49.00$36.37$57.00$62.00$10.00
0017Stormwater management budget (205-12108)DOL104,752.50$1.00$1.00$1.00$1.00$1.00
0018Stormwater management implementation (205-12616)LS1$16,500$5,000.00$77,025$23,500$86,000
0019SWQCP preparation (205-12618)LS1$2,140.00$2,500.00$2,500.00$4,000.00$3,610.00
0020Subgrade treatment, type IC (207-09935)SYS13,575$40.00$37.51$50.00$40.00$50.00
0021B borrow (211-02050)CYS1,861$28.00$50.81$55.00$63.00$10.00
0022Geogrid, type IB (214-11796)SYS2,320$2.00$1.78$7.50$5.00$2.30
0023Compacted aggregate, no. 53 (303-01180)TON4,091$50.00$38.30$40.00$52.00$12.00
0024Asphalt for tack coat (406-05520)TON10.60$1,025.00$1,025.00$1,025.00$635.00$600.00
0025Fence , and post 42 inch, split rail concrete (603-03829)LFT100$494.00$450.00$251.52$475.00$450.00
0026Fence gate, chain link, 48 in. X 24 FT (603-97283)EACH1$4,540.00$4,135.00$7,453.00$4,375.00$4,135.00
0027Fence, chain link, PVC coated, 48 in. (603-98225)LFT320$66.00$60.00$68.45$64.00$60.00
0028HMA for sidewalk (604-05528)TON235$123.00$123.00$123.00$127.00$120.00
0029HMA for approaches, type B (610-07487)TON5,700$113.00$113.00$113.00$115.00$105.00
0030Bicycle rack (618-04181)EACH2$2,470.00$2,007.52$4,750.00$2,380.00$2,250.00
0031Mobilization and demobilization for seeding (621-01004)EACH2$675.00$450.00$450.00$750.00$675.00
0032Seeding wetland (621-02356)LBS1$350.00$350.00$350.00$370.00$350.00
0033Seed mixture, native (621-03909)LBS45$1,080.00$1,080.00$1,080.00$1,150.00$1,080.00
0034Fertilizer for permanent seeding (621-06545)TON0.10$1,100.00$1,100.00$1,100.00$1,165.00$1,100.00
0035Seed mixture, type U (621-06554)LBS33$7.00$7.00$7.00$7.50$7.00
0036Mulching material (621-06565)TON0.50$642.00$585.00$585.00$620.00$585.00
0037Water (621-06567)KGAL264$110.00$100.00$100.00$106.00$100.00
0038Field office, type C (628-09403)MOS12$3,500.00$2,737.77$2,200.00$3,275.00$3,000.00
0039Computer system equipment (628-11976)EACH2$1,100.00$583.58$950.00$650.00$600.00
0040Topsoil processing and distribution (629-000149)SYS18,102$6.00$6.35$9.10$5.30$5.00
0041Topsoil amendment budget (629-000150)DOL36,204$1.00$1.00$1.00$1.00$1.00
0042Temporary pavement marking, removable, 6 in. (801-06209)LFT1,000$2.00$1.81$2.50$3.75$1.81
0043Construction sign, type A (801-06640)EACH10$191.00$191.00$225.00$185.00$191.00
0044Construction sign, type B (801-06645)EACH3$101.00$101.00$175.00$175.00$101.00
0045Flashing arrow sign (801-06710)DAY260$15.00$15.00$18.00$12.70$15.00
0046Maintaining traffic (801-06775)LS1$40,000$149,144$36,097$11,500$273,000
0047Barricade, type III-A (801-07118)LFT20$14.70$14.72$15.00$19.00$14.72
0048Temporary pedestrian channelizer (801-12862)LFT20$37.20$37.21$37.50$88.50$13.92
0049Reference post (802-04893)EACH16$350.00$200.00$200.00$212.00$200.00
0050Sign post, square, type 1, reinforced anchor base (802-05701)LFT465$32.00$29.00$29.00$20.00$29.00
0051Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT135.30$30.00$32.00$32.00$23.50$32.00
0052Handhole, lighting (807-02191)EACH6$2,612.00$2,100.00$2,100.00$2,225.00$2,100.00
0053Wire, no. 4 copper, 1/C (807-86843)LFT100$14.00$21.25$21.25$22.50$21.25
0054Line, paint, solid, white, 12 in. (808-75015)LFT16$8.25$8.23$4.00$5.30$8.23
INDOT contract R-42311-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy