INDOT contract B-43364-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on March 12, 2025, Lake, LaPorte. 5 bids received; low bid $3,645,530 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 112
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $3,645,530 | Low |
| 2 | F H Paschen S N Nielsen & Associates LLC | $3,761,005 | +3.0% |
| 3 | Icc Group Inc | $3,797,000 | +4.0% |
| 4 | Rieth-Riley Construction Co., Inc. | $3,882,817 | +7.0% |
| 5 | Superior Construction Co Inc | $3,889,900 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. F H Paschen S N Nielsen & Associates LLC | 3. Icc Group Inc | 4. Rieth-Riley Construction Co., Inc. | 5. Superior Construction Co Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $30,000 | $225,000 | $44,000 | $60,000 | $43,620 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $182,000 | $185,000 | $182,247 | $190,000 | $192,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $76,220 | $73,000 | $76,000 | $76,800 |
| 0012 | Pavement removal (202-02240) | SYS | 118 | $56.21 | $53.26 | $52.00 | $95.00 | $30.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $270,000 | $325,000 | $477,780 | $513,000 | $600,000 |
| 0014 | Fence, farm field, remove (202-99187) | LFT | 146 | $11.00 | $7.45 | $20.00 | $22.00 | $8.00 |
| 0015 | Excavation, common (203-02000) | CYS | 510 | $50.00 | $69.13 | $40.00 | $105.00 | $50.00 |
| 0016 | Borrow (203-02070) | CYS | 190 | $1.00 | $17.02 | $70.00 | $20.65 | $0.01 |
| 0017 | Stormwater management budget (205-12108) | DOL | 26,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $10,000 | $14,000 | $15,000 | $20,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 818 | $55.21 | $35.56 | $55.00 | $50.00 | $48.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 20 | $200.00 | $180.86 | $90.00 | $240.00 | $200.00 |
| 0021 | Flowable backfill, non- removable (213-09269) | CYS | 4 | $425.00 | $1,156.01 | $960.00 | $215.00 | $1,200.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 676 | $7.00 | $8.67 | $4.50 | $9.00 | $8.00 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 36 | $165.00 | $219.51 | $100.00 | $85.00 | $145.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 713 | $50.00 | $33.06 | $65.00 | $50.00 | $42.00 |
| 0025 | Compacted aggregate, no. 73 (303-07449) | TON | 6 | $135.00 | $564.04 | $141.00 | $100.00 | $330.00 |
| 0026 | Widening with HMA, type C (304-07494) | TON | 42 | $301.13 | $205.40 | $350.00 | $205.40 | $256.90 |
| 0027 | Milling, transition (306-08043) | SYS | 235 | $23.00 | $22.87 | $22.00 | $43.95 | $18.00 |
| 0028 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 67 | $250.00 | $159.35 | $159.35 | $159.35 | $159.35 |
| 0029 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 83 | $215.00 | $137.35 | $137.35 | $137.35 | $137.35 |
| 0030 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 272 | $167.00 | $109.30 | $109.30 | $109.30 | $109.30 |
| 0031 | Joint adhesive, surface (401-10258) | LFT | 750 | $0.01 | $1.25 | $1.25 | $1.25 | $1.25 |
| 0032 | Joint adhesive, intermediate (401-10259) | LFT | 705 | $0.01 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 2,896 | $0.01 | $0.85 | $0.85 | $0.85 | $0.85 |
| 0034 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $1,000.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0035 | Terminal joint, type HMA (503-12477) | LFT | 56 | $425.00 | $359.76 | $350.00 | $405.00 | $410.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 1,849 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0037 | Guardrail, reset (601-06035) | LFT | 230 | $29.00 | $29.00 | $29.00 | $29.00 | $29.00 |
| 0038 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,457 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 0039 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,311.00 | $3,311.00 | $3,311.00 | $3,311.00 | $3,311.00 |
| 0040 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 |
| 0041 | Barrier delineator (602-06729) | EACH | 16 | $22.56 | $23.65 | $24.00 | $25.00 | $22.56 |
| 0042 | Fence, farm field, 47 in. (603-06040) | LFT | 146 | $33.00 | $33.00 | $33.00 | $33.00 | $33.00 |
| 0043 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 184 | $65.00 | $102.93 | $106.00 | $130.00 | $90.00 |
| 0044 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 162 | $250.00 | $186.51 | $225.00 | $185.00 | $168.00 |
| 0045 | Riprap, revetment (616-06405) | TON | 216 | $135.00 | $107.31 | $125.00 | $140.00 | $80.00 |
| 0046 | Geotextile for riprap, type 2A (616-12248) | SYS | 316 | $3.00 | $7.65 | $4.50 | $6.00 | $10.00 |
| 0047 | Inspection hole (616-93772) | EACH | 4 | $400.00 | $700.27 | $750.00 | $244.00 | $1,000.00 |
| 0048 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $19,000 | $19,000 | $19,000 | $19,000 | $19,000 |
| 0049 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0050 | Clean steel bridge, top flanges, type QP-2, bridge no. 1 (619-12506) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0051 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0052 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $500.00 | $400.00 | $500.00 | $475.00 | $500.00 |
| 0053 | Erosion control blanket (621-02770) | SYS | 1,833 | $1.48 | $1.40 | $1.48 | $2.22 | $1.48 |
| 0054 | Mulched seeding, type R (621-06559) | SYS | 1,833 | $1.05 | $1.25 | $1.05 | $1.45 | $1.05 |
| 0055 | Water (621-06567) | KGAL | 1 | $100.00 | $20.00 | $100.00 | $10.00 | $100.00 |
| 0056 | Sodding (621-06574) | SYS | 112 | $17.00 | $14.00 | $17.00 | $22.25 | $17.00 |
| 0057 | Field office, type C (628-09403) | MOS | 18 | $3,100.00 | $2,300.00 | $2,208.33 | $3,100.00 | $2,000.00 |
| 0058 | Computer system equipment (628-11976) | EACH | 1 | $450.00 | $875.37 | $810.00 | $800.00 | $500.00 |
| 0059 | Concrete, A, substructure (702-51005) | CYS | 20.80 | $2,000.00 | $5,218.45 | $3,000.00 | $2,725.00 | $2,000.00 |
| 0060 | Field drilled hole in concrete (702-51863) | EACH | 24 | $40.00 | $45.25 | $85.00 | $24.00 | $100.00 |
| 0061 | Concrete, C, substructure (702-92857) | CYS | 15 | $2,600.00 | $2,217.28 | $3,200.00 | $2,100.00 | $1,400.00 |
| 0062 | Reinforcing bars (703-06028) | LBS | 5,354 | $1.75 | $1.46 | $1.45 | $2.10 | $1.35 |
| 0063 | Reinforcing bars, epoxy coated (703-06029) | LBS | 74,767 | $1.85 | $1.40 | $1.50 | $2.00 | $1.45 |
| 0064 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 32 | $55.00 | $58.73 | $135.00 | $75.00 | $50.00 |
| 0065 | Concrete, C, superstructure (704-51002) | CYS | 190.50 | $1,800.00 | $1,878.04 | $1,650.00 | $1,500.00 | $1,300.00 |
| 0066 | Railing, concrete type FC (706-11600) | CYS | 41.50 | $675.00 | $675.00 | $675.00 | $675.00 | $675.00 |
| 0067 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $3,074.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0068 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1,000.00 | $1,000.00 | $6,200.00 | $6,200.00 | $1.00 |
| 0069 | Patching concrete structures (710-09158) | SFT | 200 | $212.00 | $120.00 | $120.00 | $140.00 | $120.00 |
| 0070 | Structural steel, field cut (711-04297) | SQIN | 539 | $37.00 | $37.00 | $26.00 | $44.00 | $35.00 |
| 0071 | Structural steel (711-51038) | LS | 1 | $488,000 | $500,000 | $525,000 | $415,260 | $420,000 |
| 0072 | Temporary support (711-51820) | LS | 1 | $25,000 | $70,000 | $15,000 | $31,500 | $80,000 |
| 0073 | Drilled hole (711-51864) | EACH | 564 | $73.00 | $73.00 | $75.00 | $40.00 | $40.00 |
| 0074 | Jacking and supporting beams (711-51877) | LS | 1 | $68,000 | $150,000 | $95,000 | $8,000.00 | $320,000 |
| 0075 | Stud shear connectors (711-96800) | EACH | 1,584 | $6.89 | $5.25 | $5.25 | $7.00 | $5.25 |
| 0076 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 92 | $23.00 | $24.57 | $35.00 | $21.00 | $12.00 |
| 0077 | Geotextile for underdrains, type 2B (718-12308) | SYS | 64 | $6.00 | $24.30 | $5.00 | $30.00 | $28.00 |
| 0078 | Longitudinal grooving (722-12732) | SYS | 823 | $4.86 | $5.86 | $9.50 | $8.00 | $8.00 |
| 0079 | Bearing assembly, fixed, type 1 (726-11451) | EACH | 6 | $5,500.00 | $4,606.13 | $800.00 | $4,400.00 | $4,500.00 |
| 0080 | Bearing assembly, elastomeric (726-92406) | EACH | 12 | $3,800.00 | $3,043.87 | $2,750.00 | $3,100.00 | $4,000.00 |
| 0081 | Road closure sign assembly (801-04308) | EACH | 6 | $274.00 | $274.00 | $274.00 | $274.00 | $274.00 |
| 0082 | Temporary pavement marking, 6 in. (801-06206) | LFT | 47,482 | $0.34 | $0.34 | $0.34 | $0.34 | $0.01 |
| 0083 | Detour route marker assembly (801-06625) | EACH | 30 | $167.00 | $167.00 | $167.00 | $167.00 | $167.00 |
| 0084 | Construction sign, type A (801-06640) | EACH | 74 | $218.00 | $218.00 | $218.00 | $218.00 | $218.00 |
| 0085 | Construction sign, type B (801-06645) | EACH | 3 | $109.00 | $109.00 | $109.00 | $109.00 | $109.00 |
| 0086 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 728 | $9.00 | $10.95 | $10.95 | $9.88 | $0.01 |
| 0087 | Flashing arrow sign (801-06710) | DAY | 390 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0088 | Maintaining traffic (801-06775) | LS | 1 | $279,843 | $149,941 | $180,329 | $520,000 | $780,000 |
| 0089 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $8,176.00 | $8,176.00 | $8,176.00 | $7,100.00 | $8,176.00 |
| 0090 | Barricade, type III-A (801-07118) | LFT | 96 | $15.29 | $15.29 | $15.29 | $15.29 | $15.29 |
| 0091 | Barricade, type III-B (801-07119) | LFT | 48 | $15.29 | $15.29 | $15.29 | $15.29 | $15.29 |
| 0092 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,030 | $67.00 | $40.52 | $48.00 | $38.00 | $0.01 |
| 0093 | Temporary traffic barrier, type 4 (801-08403) | LFT | 800 | $1.00 | $1.00 | $260.00 | $0.01 | $0.01 |
| 0094 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,280 | $78.00 | $37.80 | $48.00 | $38.00 | $0.01 |
| 0095 | Portable changeable message sign (801-11642) | EACH | 36 | $5,481.00 | $5,481.00 | $5,481.00 | $5,481.00 | $0.01 |
| 0096 | Vehicles for advanced slowdown (801-11880) | DAY | 8 | $1,619.31 | $2,500.00 | $800.00 | $4,418.00 | $3,200.00 |
| 0097 | Truck mounted attenuator (801-12042) | DAY | 24 | $680.00 | $121.00 | $121.00 | $500.00 | $700.00 |
| 0098 | Automated work zone information system (801-12544) | EACH | 8 | $4,138.00 | $4,138.00 | $4,138.00 | $4,138.00 | $0.01 |
| 0099 | Queue truck (801-12652) | DAY | 56 | $1,695.00 | $984.26 | $92.00 | $500.00 | $1,300.00 |
| 0100 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $1,246.00 | $1,246.00 | $1,246.00 | $1,246.00 | $1,246.00 |
| 0101 | Temporary buzz strips (801-97643) | LFT | 10,368 | $18.95 | $18.95 | $19.59 | $18.95 | $0.01 |
| 0102 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $208.00 | $208.00 | $208.00 | $208.00 | $208.00 |
| 0103 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,040 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 |
| 0104 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,040 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 |
| 0105 | Line, remove (808-06716) | LFT | 25,500 | $0.56 | $0.56 | $0.56 | $0.56 | $0.56 |
| 0106 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0107 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 10,200 | $0.94 | $0.94 | $0.94 | $0.94 | $0.94 |
| 0108 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 10,200 | $0.94 | $0.94 | $0.94 | $0.94 | $0.94 |
| 0109 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 5,100 | $1.04 | $1.04 | $1.04 | $1.04 | $1.04 |
| 0110 | Grooving for pavement markings (808-12032) | LFT | 25,500 | $0.66 | $0.66 | $0.66 | $0.66 | $0.66 |
| 0111 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 128 | $19.85 | $19.85 | $19.85 | $19.85 | $19.85 |
| 0112 | Snowplowable raised pavement marker (808-75998) | EACH | 128 | $44.00 | $44.00 | $44.00 | $44.00 | $44.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.