INDOT contract R-43358-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on February 12, 2025, Lake, LaPorte. 3 bids received; low bid $1,551,345 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 96
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $1,551,345 | Low |
| 2 | F H Paschen S N Nielsen & Associates LLC | $2,109,284 | +36% |
| 3 | Superior Construction Co Inc | $2,483,600 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. F H Paschen S N Nielsen & Associates LLC | 3. Superior Construction Co Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,085 | $120,000 | $231,933 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 5 | $950.00 | $2,301.52 | $2,800.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 5 | $700.00 | $1,819.09 | $1,500.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $178,335 | $105,000 | $122,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $4,300.00 | $42,000 | $48,800 |
| 0013 | Headwall, remove (202-02271) | EACH | 1 | $4,300.00 | $2,789.78 | $10,000 |
| 0014 | Paved side ditch, remove (202-02272) | LFT | 32 | $50.00 | $65.77 | $30.00 |
| 0015 | Curb and gutter, remove (202-02279) | LFT | 21 | $75.00 | $86.15 | $25.00 |
| 0016 | Manhole, remove (202-93047) | EACH | 1 | $2,200.00 | $1,271.17 | $5,000.00 |
| 0017 | Curb turnout, remove (202-94810) | EACH | 1 | $1,015.00 | $588.03 | $1,000.00 |
| 0018 | Pipe, remove (202-96133) | LFT | 101 | $35.00 | $95.38 | $95.00 |
| 0019 | Excavation, common (203-02000) | CYS | 66 | $130.00 | $213.19 | $100.00 |
| 0020 | Linear grading (203-08607) | LFT | 202 | $15.00 | $19.25 | $15.00 |
| 0021 | Pump around (205-11626) | EACH | 4 | $7,550.00 | $20,000 | $30,000 |
| 0022 | Stormwater management budget (205-12108) | DOL | 9,381 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $22,975 | $10,285 | $40,000 |
| 0024 | Subgrade treatment, type IC (207-09935) | SYS | 571 | $50.00 | $58.81 | $80.00 |
| 0025 | B borrow (211-02050) | CYS | 10 | $105.00 | $108.05 | $160.00 |
| 0026 | Structure backfill, type 2 (211-09265) | CYS | 616 | $91.00 | $30.00 | $85.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 571 | $4.25 | $6.89 | $10.00 |
| 0028 | Compacted aggregate, no. 8 (301-12233) | CYS | 111 | $125.00 | $108.39 | $280.00 |
| 0029 | Compacted aggregate, no. 53 (303-01180) | TON | 17 | $195.00 | $140.87 | $150.00 |
| 0030 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 3,414 | $5.75 | $8.33 | $4.03 |
| 0031 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 282 | $164.86 | $193.87 | $193.87 |
| 0032 | Joint adhesive, surface (401-10258) | LFT | 2,489 | $0.99 | $1.15 | $1.15 |
| 0033 | Liquid asphalt sealant (401-11785) | LFT | 2,489 | $0.20 | $0.23 | $0.23 |
| 0034 | Asphalt for tack coat (406-05520) | TON | 2 | $1,492.36 | $1,723.24 | $1,723.24 |
| 0035 | Guardrail, remove (601-02241) | LFT | 175 | $2.00 | $2.00 | $2.00 |
| 0036 | Guardrail terminal system, W-beam curved, type 7 (601-05071) | EACH | 1 | $3,284.00 | $3,284.00 | $3,284.00 |
| 0037 | Hand dig guardrail post holes (601-09238) | EACH | 7 | $105.00 | $105.00 | $105.00 |
| 0038 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 81.25 | $28.00 | $28.00 | $28.00 |
| 0039 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,482.00 | $1,482.00 | $1,482.00 |
| 0040 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $3,445.00 | $3,445.00 | $3,445.00 |
| 0041 | Curb and gutter, concrete (605-06140) | LFT | 49 | $117.00 | $90.18 | $100.00 |
| 0042 | Riprap, class 1 (616-05688) | TON | 133 | $170.00 | $117.48 | $140.00 |
| 0043 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,125 | $3.50 | $5.50 | $6.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $800.00 | $450.00 | $800.00 |
| 0045 | Mulched seeding, type U (621-06560) | SYS | 503 | $1.67 | $4.48 | $1.67 |
| 0046 | Topsoil (621-06570) | CYS | 42 | $95.00 | $84.20 | $95.00 |
| 0047 | Field office, type C (628-09403) | MOS | 18 | $2,500.00 | $2,000.00 | $2,200.00 |
| 0048 | Computer system equipment (628-11976) | EACH | 1 | $1,755.00 | $875.37 | $535.00 |
| 0049 | Waterproofing membrane type 2 (714-000086) | SFT | 6,048 | $2.25 | $4.13 | $4.00 |
| 0050 | Structure, reinforced concrete, box sections, 6 FT X 5 FT (714-11175) | LFT | 295 | $1,660.00 | $1,550.00 | $2,500.00 |
| 0051 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 59 | $115.00 | $51.18 | $28.00 |
| 0052 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 85 | $90.00 | $46.51 | $40.00 |
| 0053 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 20 | $603.00 | $320.23 | $340.00 |
| 0054 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 5 | $485.00 | $682.86 | $360.00 |
| 0055 | Pipe, type 2, circular, diameter 60 in. (715-05163) | LFT | 5 | $1,280.00 | $1,101.53 | $450.00 |
| 0056 | Pipe, type 2, deformed, min. area 12.9 SFT (715-05344) | LFT | 5 | $1,355.00 | $1,085.24 | $1,700.00 |
| 0057 | HMA for structure installation, type D (715-08307) | TON | 416 | $150.13 | $173.35 | $208.02 |
| 0058 | Geotextile for underdrains, type 2A (718-12307) | SYS | 38 | $21.00 | $16.10 | $40.00 |
| 0059 | Aggregate for underdrains (718-52610) | CYS | 5 | $365.00 | $206.48 | $180.00 |
| 0060 | Manhole, type G2, modified (720-12659) | EACH | 1 | $72,340 | $273,709 | $60,000 |
| 0061 | Catch basin, type J10 (720-45240) | EACH | 2 | $8,690.00 | $3,500.00 | $6,000.00 |
| 0062 | Manhole, type M4 (720-95335) | EACH | 1 | $21,250 | $25,000 | $30,000 |
| 0063 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 8 | $136.00 | $136.00 | $136.00 |
| 0064 | Road closure sign assembly (801-04308) | EACH | 6 | $272.00 | $272.00 | $272.00 |
| 0065 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 24,210 | $1.61 | $1.61 | $1.61 |
| 0066 | Temporary pavement message marking, removable, (only) (801-06212) | EACH | 4 | $168.00 | $168.00 | $168.00 |
| 0067 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 11 | $13.46 | $13.46 | $13.46 |
| 0068 | Construction sign, type A (801-06640) | EACH | 34 | $248.00 | $248.00 | $248.00 |
| 0069 | Flashing arrow sign (801-06710) | DAY | 52 | $15.00 | $15.00 | $15.00 |
| 0070 | Maintaining traffic (801-06775) | LS | 1 | $62,900 | $355,752 | $400,000 |
| 0071 | Barricade, type III-A (801-07118) | LFT | 324 | $16.06 | $16.06 | $16.06 |
| 0072 | Barricade, type III-B (801-07119) | LFT | 180 | $16.06 | $16.06 | $16.06 |
| 0073 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,175 | $50.30 | $45.68 | $25.00 |
| 0074 | Portable changeable message sign (801-11642) | EACH | 4 | $1,683.00 | $1,683.00 | $1,683.00 |
| 0075 | Temporary transverse pavement marking, removeable, 12 in. (801-11662) | LFT | 181 | $3.48 | $3.48 | $3.48 |
| 0076 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $2,155.00 | $2,155.00 | $2,155.00 |
| 0077 | Temporary pavement marking, removable, 10 in. (801-12956) | LFT | 1,034 | $2.73 | $2.73 | $2.73 |
| 0078 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 3 | $668.77 | $668.77 | $668.77 |
| 0079 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 1,100 | $20.14 | $20.14 | $20.14 |
| 0080 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 2,150 | $1.20 | $1.20 | $1.20 |
| 0081 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 1,750 | $1.62 | $1.62 | $1.62 |
| 0082 | Signal detector housing (805-78785) | EACH | 5 | $1,301.28 | $1,301.28 | $1,301.28 |
| 0083 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 750 | $11.95 | $11.95 | $11.95 |
| 0084 | Line, remove (808-06716) | LFT | 4,420 | $0.71 | $0.71 | $0.71 |
| 0085 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 321 | $1.47 | $1.47 | $1.47 |
| 0086 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 601 | $1.67 | $1.67 | $1.67 |
| 0087 | Grooving for pavement markings (808-12032) | LFT | 595 | $1.35 | $1.35 | $1.35 |
| 0088 | Line, thermoplastic, solid, white, 10 in. (808-12667) | LFT | 227 | $2.91 | $2.91 | $2.91 |
| 0089 | Line, thermoplastic, dotted, yellow, 6 in. (808-12849) | LFT | 233 | $1.67 | $1.67 | $1.67 |
| 0090 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 2,747 | $1.02 | $1.02 | $1.02 |
| 0091 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 1,127 | $1.02 | $1.02 | $1.02 |
| 0092 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 57 | $13.41 | $13.41 | $13.41 |
| 0093 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 173 | $13.41 | $13.41 | $13.41 |
| 0094 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 13 | $198.00 | $198.00 | $198.00 |
| 0095 | Pavement message marking, thermoplastic, "only" (808-75325) | EACH | 8 | $227.00 | $227.00 | $227.00 |
| 0096 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 1,756 | $1.47 | $1.47 | $1.47 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.