INDOT contract R-44109-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on October 7, 2026, Lake, LaPorte. 4 bids received; low bid $3,109,890 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 125
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $3,109,890 | Low |
| 2 | Milestone Contractors LP | $3,188,085 | +3.0% |
| 3 | F H Paschen S N Nielsen & Associates LLC | $3,287,033 | +6.0% |
| 4 | Grimmer Construction Inc | $3,297,745 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. F H Paschen S N Nielsen & Associates LLC | 4. Grimmer Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $82,375 | $30,002 | $250,000 | $100,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $233,645 | $159,000 | $164,000 | $160,400 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $107,950 | $151,000 | $87,000 | $150,000 |
| 0012 | Testing for asbestos (202-01261) | EACH | 1 | $1,600.00 | $950.00 | $950.00 | $1,000.00 |
| 0013 | Houses and buildings, remove, parcel no. 3 (202-03000) | LS | 1 | $34,300 | $33,350 | $50,000 | $26,800 |
| 0014 | Excavation, common (203-02000) | CYS | 4,519 | $34.50 | $63.00 | $50.45 | $45.00 |
| 0015 | Excavation, common , foundation improvement (203-02000) | CYS | 3,140 | $43.00 | $50.00 | $34.96 | $45.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 9,859 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $19,850 | $7,625.80 | $1.00 | $28,000 |
| 0018 | SWQCP preparation (205-12618) | LS | 1 | $2,700.00 | $1,500.00 | $2,500.00 | $5,170.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 316 | $28.50 | $75.00 | $31.66 | $49.00 |
| 0020 | Subgrade treatment, type ibc (207-12635) | SYS | 9,579 | $14.25 | $12.85 | $13.20 | $16.00 |
| 0021 | B borrow (211-02050) | CYS | 3,140 | $50.00 | $60.00 | $39.61 | $43.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 908 | $1.00 | $1.00 | $75.42 | $83.00 |
| 0023 | Geogrid, type IB (214-11796) | SYS | 212 | $3.50 | $6.00 | $4.59 | $4.00 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,316 | $66.50 | $99.00 | $102.25 | $105.00 |
| 0025 | Dense graded subbase (302-07455) | CYS | 36 | $93.25 | $325.00 | $146.46 | $229.00 |
| 0026 | Compacted aggregate, no. 73 (303-07449) | TON | 35 | $72.65 | $170.00 | $96.44 | $125.00 |
| 0027 | HMA patching, full depth, type B (304-12623) | TON | 1 | $595.00 | $500.00 | $1,193.49 | $500.00 |
| 0028 | QC/QA-HMA, 3, 58E, surface, 9.5 MM (401-000008) | TON | 752 | $138.00 | $130.00 | $130.00 | $130.00 |
| 0029 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 1,127 | $117.50 | $104.00 | $110.00 | $110.00 |
| 0030 | QC/QA-HMA, 3, 58E, intermediate, 19.0 MM (401-000044) | TON | 1,127 | $123.50 | $118.50 | $116.00 | $116.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 1,583 | $107.25 | $111.00 | $102.00 | $102.00 |
| 0032 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 250 | $128.50 | $112.00 | $119.75 | $119.75 |
| 0033 | Joint adhesive (401-11526) | LFT | 7,244 | $1.15 | $1.40 | $1.00 | $1.00 |
| 0034 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 3,266 | $6.25 | $6.35 | $6.00 | $6.00 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 8.10 | $2,165.00 | $1,550.00 | $2,015.00 | $2,015.00 |
| 0036 | PCCP, 9 in. , colored, stamped (502-06457) | SYS | 322 | $215.75 | $195.00 | $133.51 | $239.00 |
| 0037 | PCCP, 6 in. , colored, stamped (502-06627) | SYS | 777 | $154.00 | $128.00 | $79.62 | $196.00 |
| 0038 | D-1 contraction joint (503-05240) | LFT | 210 | $17.15 | $40.00 | $42.74 | $31.00 |
| 0039 | Sidewalk, concrete (604-06070) | SYS | 35 | $152.75 | $105.00 | $151.45 | $85.00 |
| 0040 | Curb ramp, concrete (604-08086) | SYS | 110 | $165.50 | $160.00 | $149.36 | $142.00 |
| 0041 | Detectable warning surfaces (604-12083) | SYS | 19 | $230.00 | $198.00 | $513.11 | $284.00 |
| 0042 | Curb, integral concrete (605-06090) | LFT | 258 | $46.00 | $54.00 | $49.37 | $48.00 |
| 0043 | Curb, concrete (605-06120) | LFT | 1,501 | $27.65 | $34.50 | $35.42 | $49.00 |
| 0044 | Curb and gutter, concrete , combined (605-06140) | LFT | 2,345 | $33.25 | $48.00 | $51.78 | $52.00 |
| 0045 | Center curb, concrete, type D , modified (605-06255) | SYS | 11 | $335.00 | $325.00 | $348.34 | $295.00 |
| 0046 | Curb and gutter, rolled curb , modified (605-97937) | LFT | 334 | $52.75 | $48.00 | $64.69 | $52.00 |
| 0047 | HMA for approaches, type B (610-07487) | TON | 74 | $181.75 | $250.00 | $150.00 | $150.00 |
| 0048 | PCCP for approaches, 6 in. (610-08446) | SYS | 145 | $128.10 | $108.00 | $107.54 | $102.00 |
| 0049 | PCCP for approaches, 9 in. (610-09108) | SYS | 67 | $140.50 | $150.00 | $142.52 | $130.00 |
| 0050 | Mailbox assembly, single (611-06497) | EACH | 2 | $420.00 | $420.00 | $420.00 | $420.00 |
| 0051 | Monument, type B (615-06505) | EACH | 7 | $1,345.00 | $1,345.00 | $1,345.00 | $1,345.00 |
| 0052 | Monument, type C (615-06510) | EACH | 4 | $375.00 | $375.00 | $375.00 | $375.00 |
| 0053 | Monument, type D (615-06515) | EACH | 2 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0054 | River rock (616-03096) | TON | 7 | $575.00 | $140.00 | $140.00 | $140.00 |
| 0055 | Riprap, revetment (616-06405) | TON | 5 | $300.00 | $300.00 | $384.60 | $514.00 |
| 0056 | Geotextile for riprap, type 1A (616-12246) | SYS | 67 | $5.00 | $5.00 | $12.12 | $7.00 |
| 0057 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $475.00 | $475.00 | $633.33 | $633.33 |
| 0058 | Seed mixture, type U (621-06554) | LBS | 127 | $7.11 | $7.11 | $7.11 | $7.11 |
| 0059 | Mulching material (621-06565) | TON | 2 | $540.00 | $540.00 | $540.00 | $540.00 |
| 0060 | Topsoil , planting bed (621-06570) | CYS | 387 | $134.00 | $134.00 | $134.00 | $134.00 |
| 0061 | Mulch, hardwood shredded bark (621-98038) | CYS | 44 | $96.00 | $96.00 | $96.00 | $96.00 |
| 0062 | Plant, coniferous evergreen, cone, broad upright, 48 in. to 72 in. (622-05625) | EACH | 1 | $492.00 | $492.00 | $492.00 | $492.00 |
| 0063 | Plant, coniferous evergreen, prostrate broad spreading, semispreading, over 18 in. to 24 in. (622-05634) | EACH | 28 | $58.00 | $58.00 | $58.00 | $58.00 |
| 0064 | Plant, deciduous shrub, 24 in. to 36 in. (622-05640) | EACH | 36 | $57.00 | $57.00 | $57.00 | $57.00 |
| 0065 | Plant, deciduous tree, single stem, over 2 in. to 2.5 in. (622-05650) | EACH | 10 | $622.00 | $622.00 | $622.00 | $622.00 |
| 0066 | Plant, perennial (622-05654) | EACH | 950 | $19.90 | $19.90 | $19.90 | $19.90 |
| 0067 | Field office, type C (628-09403) | MOS | 12 | $4,130.00 | $3,250.00 | $2,781.90 | $4,680.00 |
| 0068 | Topsoil processing and distribution (629-000149) | SYS | 3,126 | $13.55 | $7.19 | $5.16 | $5.00 |
| 0069 | Topsoil amendment budget (629-000150) | DOL | 6,251 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0070 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 500 | $40.00 | $40.00 | $26.10 | $55.00 |
| 0071 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 741 | $120.00 | $120.00 | $75.37 | $98.00 |
| 0072 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 695 | $130.00 | $130.00 | $78.34 | $104.00 |
| 0073 | Pipe, type 2, circular, diameter 21 in. (715-05153) | LFT | 284 | $150.00 | $150.00 | $104.21 | $116.00 |
| 0074 | Video inspection for pipe (715-09064) | LFT | 1,720 | $2.35 | $2.35 | $2.35 | $2.35 |
| 0075 | Water service connection , 2 inch (715-11896) | EACH | 1 | $5,000.00 | $5,000.00 | $4,922.21 | $12,200 |
| 0076 | Pipe end section, diameter 21 in. (715-46015) | EACH | 1 | $4,200.00 | $4,200.00 | $1,581.12 | $2,690.00 |
| 0077 | Geotextile for underdrains, type 2B (718-12308) | SYS | 469 | $5.00 | $5.00 | $5.54 | $5.00 |
| 0078 | Aggregate for underdrains (718-52610) | CYS | 40 | $75.00 | $75.00 | $116.67 | $85.00 |
| 0079 | Manhole, type C15 (720-03757) | EACH | 8 | $6,000.00 | $6,000.00 | $6,600.99 | $6,960.00 |
| 0080 | Casting, manhole, adjust to grade (720-12798) | EACH | 1 | $750.00 | $750.00 | $1,140.25 | $1,230.00 |
| 0081 | Inlet, type E7 (720-45030) | EACH | 1 | $4,000.00 | $4,000.00 | $3,634.24 | $2,740.00 |
| 0082 | Manhole, type C4 (720-45410) | EACH | 3 | $5,500.00 | $5,500.00 | $5,789.21 | $4,710.00 |
| 0083 | Structure, manhole, reconstructed (720-45605) | LFT | 4 | $1,000.00 | $1,000.00 | $1,188.57 | $898.00 |
| 0084 | Inlet, type B15 (720-98174) | EACH | 8 | $6,000.00 | $6,000.00 | $4,597.19 | $4,340.00 |
| 0085 | Inlet, type C15 (720-98555) | EACH | 5 | $6,000.00 | $6,000.00 | $5,430.78 | $4,340.00 |
| 0086 | Modular block wall (732-11810) | SFT | 247 | $44.20 | $44.20 | $44.20 | $44.20 |
| 0087 | Modular block wall erection (732-11811) | SFT | 247 | $36.00 | $36.00 | $50.27 | $57.89 |
| 0088 | Road closure sign assembly (801-04308) | EACH | 3 | $300.00 | $300.00 | $221.00 | $221.00 |
| 0089 | Detour route marker assembly (801-06625) | EACH | 32 | $185.00 | $185.00 | $151.00 | $151.00 |
| 0090 | Construction sign, type A (801-06640) | EACH | 9 | $225.00 | $225.00 | $213.00 | $213.00 |
| 0091 | Maintaining traffic (801-06775) | LS | 1 | $34,595 | $9,750.00 | $187,843 | $41,400 |
| 0092 | Barricade, type III-B (801-07119) | LFT | 96 | $15.00 | $15.00 | $14.95 | $14.95 |
| 0093 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 254 | $30.69 | $30.69 | $30.69 | $30.69 |
| 0094 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 76 | $25.98 | $25.98 | $25.98 | $25.98 |
| 0095 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 61 | $30.05 | $30.05 | $30.05 | $30.05 |
| 0096 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 103 | $31.47 | $31.47 | $31.47 | $31.47 |
| 0097 | Conduit, PVC, 2 in. schedule 40 (805-08214) | LFT | 600 | $23.61 | $23.61 | $23.61 | $23.61 |
| 0098 | Handhole, lighting (807-02191) | EACH | 4 | $2,592.76 | $2,592.76 | $2,592.76 | $2,592.76 |
| 0099 | Lighting , accent (807-05815) | EACH | 7 | $1,243.79 | $1,243.79 | $1,243.79 | $1,243.79 |
| 0100 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,305 | $24.18 | $24.18 | $24.18 | $24.18 |
| 0101 | Lighting foundation, concrete with grounding, 36 in. diameter X 96 in. (807-11981) | EACH | 9 | $2,121.94 | $2,121.94 | $2,121.94 | $2,121.94 |
| 0102 | Luminaire, low lumen roadway (807-12202) | EACH | 9 | $791.60 | $791.60 | $791.60 | $791.60 |
| 0103 | Light pole, 40 FT E.M.H., 8 FT mast arm, anchor base (807-83748) | EACH | 9 | $3,683.11 | $3,683.11 | $3,683.11 | $3,683.11 |
| 0104 | Service point, type I (807-86805) | EACH | 1 | $6,336.08 | $6,336.08 | $6,336.08 | $6,336.08 |
| 0105 | Connector kit, unfused (807-86910) | EACH | 9 | $51.84 | $51.84 | $51.84 | $51.84 |
| 0106 | Connector kit, fused (807-86915) | EACH | 9 | $51.84 | $51.84 | $51.84 | $51.84 |
| 0107 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 14 | $36.07 | $36.07 | $36.07 | $36.07 |
| 0108 | Multiple compression fitting, waterproofed (807-86925) | EACH | 36 | $47.90 | $47.90 | $47.90 | $47.90 |
| 0109 | Insulation link, non- waterproofed (807-86930) | EACH | 12 | $24.89 | $24.89 | $24.89 | $24.89 |
| 0110 | Insulation link, waterproofed (807-86935) | EACH | 42 | $36.07 | $36.07 | $36.07 | $36.07 |
| 0111 | Wire, TW/THW, no. 10 copper, stranded (807-87556) | LFT | 1,296 | $2.37 | $2.37 | $2.37 | $2.37 |
| 0112 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 600 | $24.99 | $24.99 | $24.99 | $24.99 |
| 0113 | Line, thermoplastic, broken, white, 4 in. (808-06701) | LFT | 228 | $1.15 | $1.15 | $0.88 | $0.88 |
| 0114 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 575 | $1.15 | $1.15 | $0.88 | $0.88 |
| 0115 | Line, thermoplastic, solid, white, 8 in. (808-06705) | LFT | 163 | $2.00 | $2.00 | $2.96 | $2.96 |
| 0116 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 162 | $2.50 | $2.50 | $2.31 | $2.31 |
| 0117 | Line, thermoplastic, dotted, white, 12 in. (808-11691) | LFT | 95 | $5.00 | $5.00 | $1.74 | $1.74 |
| 0118 | Transverse marking, thermoplastic, yield line, white, 27 in. (808-11698) | LFT | 98 | $14.00 | $14.00 | $21.61 | $21.61 |
| 0119 | Grooving for pavement markings (808-12032) | LFT | 2,981 | $1.00 | $1.00 | $0.59 | $0.59 |
| 0120 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 2,178 | $1.00 | $1.00 | $0.88 | $0.88 |
| 0121 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 161 | $4.00 | $4.00 | $8.11 | $8.11 |
| 0122 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 23 | $150.00 | $150.00 | $204.00 | $204.00 |
| 0123 | Line, thermoplastic, solid, yellow, 8 in. (808-92027) | LFT | 128 | $2.00 | $2.00 | $2.96 | $2.96 |
| 0124 | Irrigation system (622-07764) | LS | 1 | $25,000 | $25,000 | $50,624 | $23,000 |
| 0125 | Aggregate for drainage fill (732-11770) | CYS | 9 | $261.00 | $479.32 | $68.53 | $286.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.