INDOT contract R-43809-A bid tabulation

SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on November 5, 2026, Porter, LaPorte. 3 bids received; low bid $4,100,554 by F H Paschen S N Nielsen & Associates LLC.

Owner
Indiana DOT
Letting
05 NOV 2026
Pay items
104
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1F H Paschen S N Nielsen & Associates LLC$4,100,554Low
2Grimmer Construction Inc$4,555,760+11%
3Rieth-Riley Construction Co., Inc.$8,124,698+98%
INDOT contract R-43809-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. F H Paschen S N Nielsen & Associates LLC2. Grimmer Construction Inc3. Rieth-Riley Construction Co., Inc.
0001Construction engineering (105-06845)LS1$200,000$100,000$87,500
0002Inspection hole, deeper than 3 FT (107-09358)EACH1$2,000.00$1,160.00$3,500.00
0003Inspection hole, 3 FT deep or less (107-09367)EACH1$1,500.00$579.00$2,500.00
0004Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0005Contract liens (109-08360)DOL1$1.00$1.00$1.00
0006Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00
0007Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00
0008Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0009Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00
0010Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00
0011Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00
0012Mobilization and demobilization (110-01001)LS1$205,504$225,000$873,000
0013Tree, 30 in., remove (201-02260)EACH1$3,000.00$3,140.00$3,000.00
0014Clearing and grubbing (201-06587)ACRE1.10$22,000$48,300$85,000
0015Clearing right-of-way (201-52370)LS1$80,000$125,000$70,000
0016Pavement removal (202-02240)SYS330$50.00$9.00$122.00
0017Headwall, remove (202-02271)EACH4$2,571.06$3,430.00$5,410.00
0018Paved side ditch, remove (202-02272)LFT150$23.11$10.00$40.00
0019Pipe abandon and grout fill (202-02637)LFT349$117.83$64.00$368.00
0020Inlet, remove (202-91385)EACH4$490.00$193.00$2,800.00
0021Manhole, remove (202-93047)EACH1$829.06$179.00$2,867.00
0022Pipe, remove (202-96133)LFT354$31.58$7.00$91.00
0023Fence, farm field, remove (202-99187)LFT441$8.00$9.00$10.00
0024Excavation, common (203-02000)CYS3,961$48.00$47.00$111.00
0025Pump around (205-11626)EACH1$25,344$76,100$85,000
0026Stormwater management budget (205-12108)DOL25,830$1.00$1.00$1.00
0027Stormwater management implementation (205-12616)LS1$15,000$29,300$88,000
0028SWQCP preparation (205-12618)LS1$2,300.00$4,700.00$15,000
0029Cofferdam (206-51235)LS1$26,103$136,100$1.00
0030Subgrade treatment, type II (207-08264)SYS415$35.00$28.00$36.50
0031Subgrade treatment, type IC (207-09935)SYS520$70.00$54.00$73.00
0032Structure backfill, type 2 (211-09265)CYS588$61.00$92.00$107.00
0033Structure backfill, type 5 (211-09268)CYS188$458.68$293.00$440.00
0034Geogrid, type IB (214-11796)SYS376$3.72$2.00$4.00
0035Geotextile for pavement, type 2B (214-12239)SYS375$5.73$4.00$10.00
0036Compacted aggregate, no. 5 (301-12232)CYS30$310.84$69.00$733.00
0037Compacted aggregate, no. 53 (301-12234)CYS163$154.72$87.00$265.00
0038Compacted aggregate, no. 53 (303-01180)TON55$141.50$99.00$207.00
0039Milling, asphalt, 1 1/2 in. (306-08034)SYS3,480$4.08$7.00$14.00
0040QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009)TON526$152.59$150.00$189.00
0041QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045)TON407$185.14$182.00$184.00
0042QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048)TON1,627$131.23$129.00$128.00
0043Joint adhesive (401-11526)LFT515$4.07$4.00$13.00
0044Void reducing asphalt membrane for HMA (401-12439)LFT515$49.36$28.00$30.00
0045Asphalt for tack coat (406-05520)TON5$2,237.96$2,200.00$750.00
0046Cracks in asphalt pavement, fill (408-12028)TON1$7,500.00$5,230.00$500.00
0047Guardrail, reset (601-06035)LFT375$22.00$25.00$26.00
0048Fence, farm field, barbed wire , 36 inch (603-06042)LFT701$20.00$23.00$20.00
0049Milled HMA corrugations, conventional (606-12399)LFT690$8.69$15.00$4.59
0050Paved side ditch, type H (607-06370)LFT153$164.70$105.00$638.00
0051HMA for approaches, type B (610-07487)TON244$244.00$212.00$195.00
0052Right-of-way marker (615-06490)EACH10$295.00$342.00$250.00
0053Riprap, class 2 (616-05689)TON519$118.75$139.00$320.00
0054Riprap, revetment (616-06405)TON425$116.97$112.00$196.00
0055Geotextile for riprap, type 1A (616-12246)SYS1,036$2.57$2.00$5.00
0056Mobilization and demobilization for seeding (621-01004)EACH2$300.00$450.00$300.00
0057Erosion control blanket (621-02770)SYS2,382$2.25$3.00$2.25
0058Fertilizer for permanent seeding (621-06545)TON0.50$1,100.00$1,100.00$1,100.00
0059Seed mixture, type R (621-06553)LBS235$7.70$8.00$7.70
0060Mulched seeding, type U (621-06560)SYS1,468$1.25$1.25$1.25
0061Mulching material (621-06565)TON2.40$580.00$580.00$580.00
0062Topsoil (621-06570)CYS114$97.00$97.00$140.00
0063Sodding (621-06574)SYS51$30.00$30.00$30.00
0064Computer system equipment (628-11976)EACH3$875.37$2,610.00$100.00
0065Field office, type D (628-12683)MOS18$4,000.00$3,380.00$4,200.00
0066Topsoil processing and distribution (629-000149)SYS7,104$3.23$8.00$12.00
0067Topsoil amendment budget (629-000150)DOL13,676$1.00$1.00$1.00
0068Concrete, A, substructure (702-51005)CYS16.40$2,500.83$4,570.00$5,080.00
0069Concrete, B, footings (702-51015)CYS21.20$948.60$1,860.00$2,141.00
0070Reinforcing bars, epoxy coated (703-06029)LBS4,141$3.28$2.00$7.00
0071Temporary access lane (713-04643)LS1$250,000$80,500$355,000
0072Waterproofing membrane, type 2 (714-000086)SFT1,932$5.32$3.00$13.00
0073Structure, reinforced concrete, box sections, 5 FT X 3 FT (714-11198)LFT138$1,979.74$2,750.00$5,800.00
0074Pipe, type 1, circular, diameter 15 in. (715-05119)LFT89$81.05$288.00$245.00
0075Pipe, type 1, circular, diameter 24 in. (715-05123)LFT71$148.88$200.00$310.00
0076Pipe, type 2, circular, diameter 12 in. (715-05149)LFT59$77.73$101.00$298.00
0077Pipe, type 2, circular, diameter 15 in. (715-05151)LFT210$92.02$182.00$560.00
0078Pipe, type 2, circular, diameter 18 in. (715-05152)LFT106$82.63$112.00$158.00
0079Pipe end section, diameter 15 in. (715-46005)EACH4$1,166.55$2,650.00$3,432.00
0080Pipe installation, trenchless, 48 in. (716-07637)LFT228$3,323.72$5,225.00$8,700.00
0081Underdrain, patching (718-08308)LFT326$87.50$51.00$190.00
0082Inlet, type N12, modified (720-45066)EACH2$5,668.23$3,860.00$53,490
0083Inlet, type P12A, modified (720-95310)EACH4$5,000.61$4,270.00$14,195
0084Manhole, type C4, drop (720-98625)EACH2$13,637$9,640.00$53,490
0085Road closure sign assembly (801-04308)EACH1$211.00$450.00$211.00
0086Temporary pavement marking, removable, 6 in. (801-06209)LFT130,841$1.88$2.00$1.88
0087Construction sign, type A (801-06640)EACH46$159.00$145.00$159.00
0088Construction sign, type B (801-06645)EACH8$101.00$125.00$101.00
0089Flashing arrow sign (801-06710)DAY390$15.00$16.00$15.00
0090Maintaining traffic (801-06775)LS1$187,292$135,400$160,000
0091Energy absorbing terminal, CZ, TL-3 (801-07024)EACH3$13,276$11,000$25,000
0092Barricade, type III-A (801-07118)LFT116$14.46$12.00$14.46
0093Barricade, type III-B (801-07119)LFT144$14.46$12.00$14.46
0094Temporary traffic barrier, type 2 (801-08401)LFT2,046$62.00$36.00$110.00
0095Temporary traffic barrier, anchored, type 2 (801-08508)LFT940$45.00$54.00$110.00
0096Law enforcement officer (801-12324)HRS300$75.00$75.00$75.00
0097Reference post (802-04893)EACH4$400.00$464.00$270.00
0098Line, multi-component, solid, white, 6 in. (808-10049)LFT1,186$0.78$2.00$0.78
0099Transverse marking, multi-component, stop line, white, 24 in. (808-10051)LFT25$11.02$24.00$11.02
0100Line, multi-component, solid, yellow, 6 in. (808-10057)LFT783$0.78$2.00$0.78
0101Line, multi-component, broken, white, 6 in. (808-10071)LFT182$0.78$2.00$0.78
0102Grooving for pavement markings (808-12032)LFT2,348$0.55$2.00$0.55
0103Snowplowable raised pavement marker, remove (808-75996)EACH7$50.00$85.00$122.00
0104Snowplowable raised pavement marker (808-75998)EACH7$122.00$150.00$122.00
INDOT contract R-43809-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy