INDOT contract R-43809-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on November 5, 2026, Porter, LaPorte. 3 bids received; low bid $4,100,554 by F H Paschen S N Nielsen & Associates LLC.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 104
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | F H Paschen S N Nielsen & Associates LLC | $4,100,554 | Low |
| 2 | Grimmer Construction Inc | $4,555,760 | +11% |
| 3 | Rieth-Riley Construction Co., Inc. | $8,124,698 | +98% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. F H Paschen S N Nielsen & Associates LLC | 2. Grimmer Construction Inc | 3. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $200,000 | $100,000 | $87,500 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 1 | $2,000.00 | $1,160.00 | $3,500.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 1 | $1,500.00 | $579.00 | $2,500.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $205,504 | $225,000 | $873,000 |
| 0013 | Tree, 30 in., remove (201-02260) | EACH | 1 | $3,000.00 | $3,140.00 | $3,000.00 |
| 0014 | Clearing and grubbing (201-06587) | ACRE | 1.10 | $22,000 | $48,300 | $85,000 |
| 0015 | Clearing right-of-way (201-52370) | LS | 1 | $80,000 | $125,000 | $70,000 |
| 0016 | Pavement removal (202-02240) | SYS | 330 | $50.00 | $9.00 | $122.00 |
| 0017 | Headwall, remove (202-02271) | EACH | 4 | $2,571.06 | $3,430.00 | $5,410.00 |
| 0018 | Paved side ditch, remove (202-02272) | LFT | 150 | $23.11 | $10.00 | $40.00 |
| 0019 | Pipe abandon and grout fill (202-02637) | LFT | 349 | $117.83 | $64.00 | $368.00 |
| 0020 | Inlet, remove (202-91385) | EACH | 4 | $490.00 | $193.00 | $2,800.00 |
| 0021 | Manhole, remove (202-93047) | EACH | 1 | $829.06 | $179.00 | $2,867.00 |
| 0022 | Pipe, remove (202-96133) | LFT | 354 | $31.58 | $7.00 | $91.00 |
| 0023 | Fence, farm field, remove (202-99187) | LFT | 441 | $8.00 | $9.00 | $10.00 |
| 0024 | Excavation, common (203-02000) | CYS | 3,961 | $48.00 | $47.00 | $111.00 |
| 0025 | Pump around (205-11626) | EACH | 1 | $25,344 | $76,100 | $85,000 |
| 0026 | Stormwater management budget (205-12108) | DOL | 25,830 | $1.00 | $1.00 | $1.00 |
| 0027 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $29,300 | $88,000 |
| 0028 | SWQCP preparation (205-12618) | LS | 1 | $2,300.00 | $4,700.00 | $15,000 |
| 0029 | Cofferdam (206-51235) | LS | 1 | $26,103 | $136,100 | $1.00 |
| 0030 | Subgrade treatment, type II (207-08264) | SYS | 415 | $35.00 | $28.00 | $36.50 |
| 0031 | Subgrade treatment, type IC (207-09935) | SYS | 520 | $70.00 | $54.00 | $73.00 |
| 0032 | Structure backfill, type 2 (211-09265) | CYS | 588 | $61.00 | $92.00 | $107.00 |
| 0033 | Structure backfill, type 5 (211-09268) | CYS | 188 | $458.68 | $293.00 | $440.00 |
| 0034 | Geogrid, type IB (214-11796) | SYS | 376 | $3.72 | $2.00 | $4.00 |
| 0035 | Geotextile for pavement, type 2B (214-12239) | SYS | 375 | $5.73 | $4.00 | $10.00 |
| 0036 | Compacted aggregate, no. 5 (301-12232) | CYS | 30 | $310.84 | $69.00 | $733.00 |
| 0037 | Compacted aggregate, no. 53 (301-12234) | CYS | 163 | $154.72 | $87.00 | $265.00 |
| 0038 | Compacted aggregate, no. 53 (303-01180) | TON | 55 | $141.50 | $99.00 | $207.00 |
| 0039 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 3,480 | $4.08 | $7.00 | $14.00 |
| 0040 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 526 | $152.59 | $150.00 | $189.00 |
| 0041 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 407 | $185.14 | $182.00 | $184.00 |
| 0042 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 1,627 | $131.23 | $129.00 | $128.00 |
| 0043 | Joint adhesive (401-11526) | LFT | 515 | $4.07 | $4.00 | $13.00 |
| 0044 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 515 | $49.36 | $28.00 | $30.00 |
| 0045 | Asphalt for tack coat (406-05520) | TON | 5 | $2,237.96 | $2,200.00 | $750.00 |
| 0046 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $7,500.00 | $5,230.00 | $500.00 |
| 0047 | Guardrail, reset (601-06035) | LFT | 375 | $22.00 | $25.00 | $26.00 |
| 0048 | Fence, farm field, barbed wire , 36 inch (603-06042) | LFT | 701 | $20.00 | $23.00 | $20.00 |
| 0049 | Milled HMA corrugations, conventional (606-12399) | LFT | 690 | $8.69 | $15.00 | $4.59 |
| 0050 | Paved side ditch, type H (607-06370) | LFT | 153 | $164.70 | $105.00 | $638.00 |
| 0051 | HMA for approaches, type B (610-07487) | TON | 244 | $244.00 | $212.00 | $195.00 |
| 0052 | Right-of-way marker (615-06490) | EACH | 10 | $295.00 | $342.00 | $250.00 |
| 0053 | Riprap, class 2 (616-05689) | TON | 519 | $118.75 | $139.00 | $320.00 |
| 0054 | Riprap, revetment (616-06405) | TON | 425 | $116.97 | $112.00 | $196.00 |
| 0055 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,036 | $2.57 | $2.00 | $5.00 |
| 0056 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $300.00 | $450.00 | $300.00 |
| 0057 | Erosion control blanket (621-02770) | SYS | 2,382 | $2.25 | $3.00 | $2.25 |
| 0058 | Fertilizer for permanent seeding (621-06545) | TON | 0.50 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0059 | Seed mixture, type R (621-06553) | LBS | 235 | $7.70 | $8.00 | $7.70 |
| 0060 | Mulched seeding, type U (621-06560) | SYS | 1,468 | $1.25 | $1.25 | $1.25 |
| 0061 | Mulching material (621-06565) | TON | 2.40 | $580.00 | $580.00 | $580.00 |
| 0062 | Topsoil (621-06570) | CYS | 114 | $97.00 | $97.00 | $140.00 |
| 0063 | Sodding (621-06574) | SYS | 51 | $30.00 | $30.00 | $30.00 |
| 0064 | Computer system equipment (628-11976) | EACH | 3 | $875.37 | $2,610.00 | $100.00 |
| 0065 | Field office, type D (628-12683) | MOS | 18 | $4,000.00 | $3,380.00 | $4,200.00 |
| 0066 | Topsoil processing and distribution (629-000149) | SYS | 7,104 | $3.23 | $8.00 | $12.00 |
| 0067 | Topsoil amendment budget (629-000150) | DOL | 13,676 | $1.00 | $1.00 | $1.00 |
| 0068 | Concrete, A, substructure (702-51005) | CYS | 16.40 | $2,500.83 | $4,570.00 | $5,080.00 |
| 0069 | Concrete, B, footings (702-51015) | CYS | 21.20 | $948.60 | $1,860.00 | $2,141.00 |
| 0070 | Reinforcing bars, epoxy coated (703-06029) | LBS | 4,141 | $3.28 | $2.00 | $7.00 |
| 0071 | Temporary access lane (713-04643) | LS | 1 | $250,000 | $80,500 | $355,000 |
| 0072 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,932 | $5.32 | $3.00 | $13.00 |
| 0073 | Structure, reinforced concrete, box sections, 5 FT X 3 FT (714-11198) | LFT | 138 | $1,979.74 | $2,750.00 | $5,800.00 |
| 0074 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 89 | $81.05 | $288.00 | $245.00 |
| 0075 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 71 | $148.88 | $200.00 | $310.00 |
| 0076 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 59 | $77.73 | $101.00 | $298.00 |
| 0077 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 210 | $92.02 | $182.00 | $560.00 |
| 0078 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 106 | $82.63 | $112.00 | $158.00 |
| 0079 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $1,166.55 | $2,650.00 | $3,432.00 |
| 0080 | Pipe installation, trenchless, 48 in. (716-07637) | LFT | 228 | $3,323.72 | $5,225.00 | $8,700.00 |
| 0081 | Underdrain, patching (718-08308) | LFT | 326 | $87.50 | $51.00 | $190.00 |
| 0082 | Inlet, type N12, modified (720-45066) | EACH | 2 | $5,668.23 | $3,860.00 | $53,490 |
| 0083 | Inlet, type P12A, modified (720-95310) | EACH | 4 | $5,000.61 | $4,270.00 | $14,195 |
| 0084 | Manhole, type C4, drop (720-98625) | EACH | 2 | $13,637 | $9,640.00 | $53,490 |
| 0085 | Road closure sign assembly (801-04308) | EACH | 1 | $211.00 | $450.00 | $211.00 |
| 0086 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 130,841 | $1.88 | $2.00 | $1.88 |
| 0087 | Construction sign, type A (801-06640) | EACH | 46 | $159.00 | $145.00 | $159.00 |
| 0088 | Construction sign, type B (801-06645) | EACH | 8 | $101.00 | $125.00 | $101.00 |
| 0089 | Flashing arrow sign (801-06710) | DAY | 390 | $15.00 | $16.00 | $15.00 |
| 0090 | Maintaining traffic (801-06775) | LS | 1 | $187,292 | $135,400 | $160,000 |
| 0091 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 3 | $13,276 | $11,000 | $25,000 |
| 0092 | Barricade, type III-A (801-07118) | LFT | 116 | $14.46 | $12.00 | $14.46 |
| 0093 | Barricade, type III-B (801-07119) | LFT | 144 | $14.46 | $12.00 | $14.46 |
| 0094 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,046 | $62.00 | $36.00 | $110.00 |
| 0095 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 940 | $45.00 | $54.00 | $110.00 |
| 0096 | Law enforcement officer (801-12324) | HRS | 300 | $75.00 | $75.00 | $75.00 |
| 0097 | Reference post (802-04893) | EACH | 4 | $400.00 | $464.00 | $270.00 |
| 0098 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,186 | $0.78 | $2.00 | $0.78 |
| 0099 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 25 | $11.02 | $24.00 | $11.02 |
| 0100 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 783 | $0.78 | $2.00 | $0.78 |
| 0101 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 182 | $0.78 | $2.00 | $0.78 |
| 0102 | Grooving for pavement markings (808-12032) | LFT | 2,348 | $0.55 | $2.00 | $0.55 |
| 0103 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 7 | $50.00 | $85.00 | $122.00 |
| 0104 | Snowplowable raised pavement marker (808-75998) | EACH | 7 | $122.00 | $150.00 | $122.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.