INDOT contract R-43004-A bid tabulation
CONCRETE PAVEMENT RESTORATION AND BRIDGE DECK REPLACEMENT. Let by Indiana DOT on January 15, 2025, Laporte, LaPorte. 5 bids received; low bid $10,719,759 by Dunnet Bay Construction Company.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 148
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $10,719,759 | Low |
| 2 | Superior Construction Co Inc | $10,799,990 | +1.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $11,990,441 | +12% |
| 4 | F H Paschen S N Nielsen & Associates LLC | $12,097,313 | +13% |
| 5 | Milestone Contractors LP | $13,163,000 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Superior Construction Co Inc | 3. Rieth-Riley Construction Co., Inc. | 4. F H Paschen S N Nielsen & Associates LLC | 5. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $565,939 | $373,455 | $80,000 | $300,000 | $105,067 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Special maintenance , pothole patching (109-12573) | DOL | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Mobilization and demobilization (110-01001) | LS | 1 | $530,000 | $560,000 | $595,000 | $600,000 | $658,000 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $56,000 | $42,000 | $60,000 | $65,800 |
| 0015 | Pavement removal (202-02240) | SYS | 5,041 | $45.00 | $30.00 | $32.00 | $31.45 | $55.00 |
| 0016 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $5,000.00 | $60,000 | $22,500 | $7,500.00 | $10,000 |
| 0017 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $5,000.00 | $60,000 | $22,500 | $7,500.00 | $10,000 |
| 0018 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $400,000 | $400,000 | $810,000 | $360,000 | $340,000 |
| 0019 | Inlet, remove (202-91385) | EACH | 2 | $1,200.00 | $2,000.00 | $760.00 | $1,326.08 | $1,200.00 |
| 0020 | Fence, chain link, remove (202-91840) | LFT | 516 | $8.00 | $8.00 | $22.50 | $8.00 | $12.00 |
| 0021 | Guardrail end treatment, remove (202-93741) | EACH | 3 | $730.00 | $730.00 | $400.00 | $730.00 | $525.00 |
| 0022 | Barrier wall, concrete, remove (202-94954) | LFT | 76 | $100.00 | $100.00 | $150.00 | $35.00 | $50.00 |
| 0023 | Excavation, common (203-02000) | CYS | 233 | $55.00 | $155.00 | $155.00 | $77.69 | $245.00 |
| 0024 | Stormwater management budget (205-12108) | DOL | 11,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $20,000 | $10,000 | $1,601.00 | $28,000 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 1,459 | $27.00 | $44.00 | $78.00 | $34.69 | $27.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 5,373 | $45.00 | $44.00 | $49.00 | $48.96 | $84.00 |
| 0028 | Aggregate for end bent backfill (211-06467) | CYS | 60 | $290.00 | $80.00 | $180.00 | $147.32 | $360.00 |
| 0029 | Structure backfill, type 5 (211-09268) | CYS | 20 | $185.00 | $220.00 | $163.00 | $163.02 | $267.00 |
| 0030 | Flowable backfill, non- removable (213-09269) | CYS | 112 | $190.00 | $180.00 | $195.00 | $224.87 | $239.00 |
| 0031 | Geogrid, type IB (214-11796) | SYS | 1,459 | $2.00 | $4.00 | $1.00 | $5.34 | $0.73 |
| 0032 | Geotextile for pavement, type 2B (214-12239) | SYS | 5,373 | $3.00 | $4.50 | $3.00 | $4.33 | $1.74 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 43 | $95.00 | $120.00 | $265.00 | $129.97 | $167.00 |
| 0034 | Subbase for PCCP (302-06464) | CYS | 1,199 | $120.00 | $130.00 | $100.00 | $137.57 | $230.00 |
| 0035 | Compacted aggregate, no. 53 (303-01180) | TON | 915 | $50.00 | $35.00 | $55.00 | $51.90 | $37.00 |
| 0036 | Lean concrete base, 9 in. (305-12695) | SYS | 1,459 | $80.00 | $185.00 | $60.00 | $127.84 | $94.00 |
| 0037 | Milling, transition (306-08043) | SYS | 232 | $15.00 | $13.00 | $49.00 | $36.18 | $34.00 |
| 0038 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 39 | $400.00 | $230.00 | $230.00 | $230.00 | $400.00 |
| 0039 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 33 | $410.00 | $252.00 | $252.00 | $252.00 | $410.00 |
| 0040 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 146 | $240.00 | $133.00 | $133.00 | $133.00 | $240.00 |
| 0041 | Asphalt for tack coat (406-05520) | TON | 1 | $1.00 | $2,065.00 | $2,065.00 | $2,065.00 | $1.00 |
| 0042 | QC/QA-PCCP, 15 in. (501-06326) | SYS | 2,532 | $230.00 | $170.00 | $135.00 | $119.55 | $225.00 |
| 0043 | Retrofitted tie bars (503-03489) | EACH | 1,402 | $70.00 | $38.00 | $85.00 | $32.11 | $13.00 |
| 0044 | D-1 contraction joint (503-05240) | LFT | 2,117 | $16.00 | $25.00 | $34.00 | $20.41 | $40.00 |
| 0045 | Terminal joint, type HMA (503-12477) | LFT | 73 | $300.00 | $290.00 | $400.00 | $335.52 | $450.00 |
| 0046 | Terminal joint, type PCCP (503-12478) | LFT | 254 | $250.00 | $300.00 | $355.00 | $289.52 | $400.00 |
| 0047 | Expansion joint with load transfer (503-12479) | LFT | 255 | $18.00 | $60.00 | $70.00 | $62.69 | $37.81 |
| 0049 | PCCP patching, full depth (506-06333) | SYS | 1,459 | $300.00 | $425.00 | $598.00 | $294.23 | $611.00 |
| 0051 | Joints in PCCP, saw and seal (507-08272) | LFT | 1,041 | $1.50 | $1.50 | $15.00 | $2.45 | $3.10 |
| 0052 | Joint repair, partial depth (509-12191) | SFT | 864 | $60.00 | $120.00 | $367.00 | $128.13 | $305.00 |
| 0053 | Guardrail, remove (601-02241) | LFT | 1,477 | $6.00 | $6.00 | $8.00 | $6.00 | $8.00 |
| 0054 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 888 | $20.00 | $20.00 | $23.00 | $20.00 | $20.00 |
| 0055 | Guardrail height transition, MGS (601-12289) | EACH | 5 | $1,362.00 | $1,362.00 | $950.00 | $1,362.00 | $850.00 |
| 0056 | Guardrail transition, MGS with curb (601-12291) | EACH | 6 | $3,430.00 | $3,430.00 | $3,600.00 | $3,430.00 | $2,800.00 |
| 0057 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $3,297.00 | $3,297.00 | $3,450.00 | $3,297.00 | $2,700.00 |
| 0058 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,193.00 | $3,193.00 | $3,200.00 | $3,193.00 | $3,050.00 |
| 0059 | Barrier delineator (602-06729) | EACH | 20 | $23.11 | $23.11 | $23.11 | $23.11 | $23.11 |
| 0060 | Concrete median barrier, modified (602-91266) | LFT | 116 | $175.00 | $350.00 | $235.00 | $318.21 | $275.00 |
| 0061 | Curb, integral concrete, type B (605-06095) | LFT | 98 | $80.00 | $90.00 | $91.00 | $93.23 | $109.00 |
| 0062 | Curb, concrete, type B (605-06121) | LFT | 156 | $60.00 | $166.00 | $110.00 | $93.22 | $107.00 |
| 0063 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 236 | $140.00 | $130.00 | $120.00 | $165.00 | $235.00 |
| 0064 | Reinforced concrete bridge approach, 15 in. (609-06263) | SYS | 1,095 | $165.00 | $160.00 | $190.00 | $210.00 | $300.00 |
| 0065 | Riprap, revetment (616-06405) | TON | 364 | $170.00 | $104.00 | $153.00 | $100.00 | $150.00 |
| 0066 | Geotextile for riprap, type 1A (616-12246) | SYS | 837 | $3.00 | $6.00 | $4.50 | $2.79 | $1.25 |
| 0067 | Inspection hole (616-93772) | EACH | 6 | $400.00 | $600.00 | $235.00 | $286.11 | $550.00 |
| 0068 | Clean steel bridge, partial, QP-2, bridge no. 3 (619-11050) | LS | 1 | $10,000 | $600.00 | $600.00 | $25,000 | $600.00 |
| 0069 | Clean steel bridge, QP-2, bridge no. 3 (619-11052) | LS | 1 | $160,000 | $142,000 | $142,000 | $356,836 | $142,000 |
| 0070 | Disposal of cleaning waste, hazardous, bridge no. 3 (619-12459) | LS | 1 | $4,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0071 | Clean steel bridge, top flanges, type QP-2, bridge no. 3 (619-12506) | LS | 1 | $20,000 | $1,000.00 | $1,000.00 | $25,000 | $11,000 |
| 0072 | Coat steel bridge, bridge no. 3 (619-51859) | LS | 1 | $40,000 | $91,000 | $91,000 | $50,000 | $91,000 |
| 0073 | Coat steel bridge, partial, bridge no. 3 (619-51860) | LS | 1 | $2,000.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 0074 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $500.00 | $500.00 | $300.00 | $400.00 | $300.00 |
| 0075 | Erosion control blanket (621-02770) | SYS | 605 | $1.88 | $1.88 | $5.75 | $1.30 | $5.75 |
| 0076 | Mulched seeding, type R (621-06559) | SYS | 605 | $1.50 | $1.50 | $3.28 | $1.30 | $3.28 |
| 0077 | Water (621-06567) | KGAL | 4 | $50.00 | $50.00 | $5.00 | $50.00 | $5.00 |
| 0078 | Sodding (621-06574) | SYS | 409 | $16.00 | $16.00 | $22.50 | $8.00 | $19.25 |
| 0079 | Seed mixture, emergent wetland (621-06737) | LBS | 5 | $400.00 | $400.00 | $530.00 | $50.00 | $530.00 |
| 0080 | Computer system equipment (628-11976) | EACH | 3 | $200.00 | $500.00 | $750.00 | $291.79 | $810.00 |
| 0081 | Field office, type D (628-12683) | MOS | 18 | $3,200.00 | $2,500.00 | $3,500.00 | $4,500.00 | $3,900.00 |
| 0082 | Field drilled hole in concrete (702-51863) | EACH | 200 | $60.00 | $35.00 | $20.00 | $25.32 | $55.00 |
| 0083 | Concrete, C, substructure (702-92857) | CYS | 3.50 | $1,800.00 | $7,600.00 | $5,900.00 | $5,000.00 | $8,500.00 |
| 0084 | Reinforcing bars, epoxy coated (703-06029) | LBS | 185,149 | $1.20 | $1.30 | $1.45 | $1.16 | $2.00 |
| 0085 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 666 | $39.00 | $45.00 | $50.00 | $45.36 | $60.00 |
| 0086 | Concrete, C, superstructure (704-51002) | CYS | 296 | $950.00 | $1,000.00 | $1,150.00 | $1,350.00 | $1,900.00 |
| 0087 | Bridge railing pedestrian fence (706-11455) | LFT | 520 | $93.00 | $93.00 | $147.50 | $93.00 | $85.00 |
| 0088 | Railing, concrete type FC (706-11600) | CYS | 50 | $1,200.00 | $650.00 | $650.00 | $1,320.36 | $650.00 |
| 0089 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $4,500.00 | $2,000.00 | $4,250.00 | $2,946.14 | $2,000.00 |
| 0090 | Concrete bridge railing transition, type TFT (706-11621) | EACH | 4 | $4,500.00 | $6,000.00 | $5,000.00 | $4,690.90 | $4,000.00 |
| 0091 | Grout, non-shrink (708-01112) | CYS | 0.60 | $5,000.00 | $16,400 | $6,500.00 | $11,316 | $30,000 |
| 0092 | Welded steel wire reinforcement (708-51814) | SFT | 29 | $10.00 | $40.00 | $10.00 | $10.00 | $10.00 |
| 0093 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,100.00 | $3,000.00 |
| 0094 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,100.00 | $3,000.00 |
| 0095 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $3,000.00 | $5,000.00 | $5,500.00 | $5,600.00 | $0.01 |
| 0096 | Patching concrete structures (710-09158) | SFT | 29 | $279.00 | $400.00 | $305.00 | $279.00 | $279.00 |
| 0097 | Structural steel (711-51038) | LS | 1 | $292,847 | $300,000 | $290,000 | $350,000 | $290,000 |
| 0098 | Drilled hole (711-51864) | EACH | 3,240 | $34.00 | $35.00 | $26.00 | $34.00 | $75.00 |
| 0099 | Jacking and supporting beams , bridge no. 3 (711-51877) | LS | 1 | $99,421 | $100,000 | $25,000 | $75,000 | $100,000 |
| 0100 | Bolt, remove (711-96479) | EACH | 168 | $392.00 | $10.00 | $55.40 | $392.00 | $275.00 |
| 0101 | Stud shear connectors (711-96800) | EACH | 4,428 | $5.68 | $5.08 | $11.50 | $5.08 | $7.00 |
| 0102 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $1,300.00 | $800.00 | $1,525.00 | $2,391.76 | $1,100.00 |
| 0103 | Hydrodemolition (722-01066) | SYS | 1,368 | $125.00 | $150.00 | $88.00 | $119.21 | $125.00 |
| 0104 | Bridge deck overlay budget (722-12380) | DOL | 40,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0105 | Bridge deck, remove existing concrete surface (722-12464) | SYS | 1,368 | $20.50 | $15.00 | $21.00 | $29.68 | $20.00 |
| 0106 | Longitudinal grooving (722-12732) | SYS | 3,685 | $8.50 | $8.00 | $32.00 | $7.42 | $10.00 |
| 0107 | Bridge deck patching, full depth (722-51401) | SFT | 616 | $75.00 | $30.00 | $5.00 | $112.15 | $25.00 |
| 0108 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,368 | $110.00 | $120.00 | $160.00 | $175.00 | $225.00 |
| 0109 | Overlay dam (722-51874) | SFT | 292 | $20.00 | $80.00 | $40.00 | $77.76 | $100.00 |
| 0110 | Bearing assembly, elastomeric (726-92406) | EACH | 30 | $4,590.85 | $3,000.00 | $2,100.00 | $1,174.95 | $2,750.00 |
| 0111 | Construction sign, type C (801-03290) | EACH | 4 | $271.00 | $271.00 | $271.00 | $271.00 | $271.00 |
| 0112 | Road closure sign assembly (801-04308) | EACH | 4 | $274.00 | $274.00 | $274.00 | $274.00 | $274.00 |
| 0113 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 287,478 | $1.59 | $1.59 | $1.59 | $1.59 | $1.59 |
| 0114 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 180 | $5.12 | $5.12 | $5.12 | $5.12 | $5.12 |
| 0115 | Detour route marker assembly (801-06625) | EACH | 19 | $166.00 | $166.00 | $166.00 | $166.00 | $166.00 |
| 0116 | Construction sign, type A (801-06640) | EACH | 178 | $234.00 | $234.00 | $234.00 | $234.00 | $234.00 |
| 0117 | Construction sign, type B (801-06645) | EACH | 34 | $117.00 | $117.00 | $117.00 | $117.00 | $117.00 |
| 0118 | Temporary raised pavement marker, grade 2 (801-06650) | EACH | 2,441 | $9.85 | $9.85 | $9.85 | $9.85 | $9.85 |
| 0119 | Flashing arrow sign (801-06710) | DAY | 438 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0120 | Maintaining traffic (801-06775) | LS | 1 | $500,000 | $1,800,000 | $820,000 | $778,734 | $490,000 |
| 0121 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 10 | $7,408.00 | $5,000.00 | $7,500.00 | $7,408.00 | $7,335.00 |
| 0122 | Barricade, type III-A (801-07118) | LFT | 164 | $15.43 | $15.43 | $15.43 | $15.43 | $15.43 |
| 0123 | Barricade, type III-B (801-07119) | LFT | 24 | $15.43 | $15.43 | $15.43 | $15.43 | $15.43 |
| 0124 | Temporary traffic barrier, type 2 (801-08401) | LFT | 32,965 | $35.00 | $1.00 | $43.85 | $68.00 | $50.00 |
| 0125 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 4,740 | $19.00 | $10.00 | $43.85 | $37.66 | $65.00 |
| 0126 | Portable changeable message sign (801-11642) | EACH | 4 | $5,853.00 | $5,853.00 | $5,853.00 | $5,853.00 | $5,853.00 |
| 0127 | Truck mounted attenuator (801-12042) | DAY | 150 | $475.00 | $100.00 | $10.00 | $475.00 | $1,000.00 |
| 0128 | Automated work zone information system (801-12544) | EACH | 4 | $20,165 | $20,165 | $20,165 | $20,165 | $20,165 |
| 0129 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 12 | $3,988.00 | $3,988.00 | $3,988.00 | $3,988.00 | $3,988.00 |
| 0130 | Temporary buzz strips (801-97643) | LFT | 2,592 | $19.20 | $19.20 | $19.20 | $19.20 | $19.20 |
| 0131 | Reference post (802-04893) | EACH | 2 | $474.00 | $298.85 | $300.00 | $474.00 | $250.00 |
| 0132 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 20 | $42.00 | $34.44 | $34.00 | $42.00 | $25.00 |
| 0133 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 10 | $84.00 | $33.04 | $30.00 | $84.00 | $24.00 |
| 0134 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 22 | $48.00 | $30.95 | $40.00 | $48.00 | $44.00 |
| 0135 | Conduit, PVC, 3 in. (805-06600) | LFT | 100 | $40.00 | $5.00 | $60.00 | $26.15 | $4.00 |
| 0136 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 964 | $2.11 | $2.11 | $2.11 | $2.11 | $2.11 |
| 0137 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 964 | $2.11 | $2.11 | $2.11 | $2.11 | $2.11 |
| 0138 | Line, remove (808-06716) | LFT | 172,896 | $0.51 | $0.51 | $0.51 | $0.51 | $0.51 |
| 0139 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0140 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 8,252 | $1.06 | $1.06 | $1.06 | $1.06 | $1.06 |
| 0141 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 11,969 | $1.06 | $1.06 | $1.06 | $1.06 | $1.06 |
| 0142 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 5,970 | $1.33 | $1.33 | $1.33 | $1.33 | $1.33 |
| 0143 | Grooving for pavement markings (808-12032) | LFT | 163,611 | $0.67 | $0.67 | $0.67 | $0.67 | $0.67 |
| 0144 | Prismatic reflector (808-75994) | EACH | 272 | $9.15 | $9.15 | $9.15 | $9.15 | $9.15 |
| 0145 | Jointed reinforced concrete pavement, 15 in. (503-12668) | SYS | 1,126 | $255.00 | $200.00 | $240.00 | $147.89 | $280.00 |
| 0146 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 57,320 | $6.89 | $6.89 | $6.89 | $6.89 | $6.89 |
| 0147 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 28,660 | $7.71 | $7.71 | $7.71 | $7.71 | $7.71 |
| 0148 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 57,320 | $6.89 | $6.89 | $6.89 | $6.89 | $6.89 |
| 0149 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1,188 | $18.65 | $18.65 | $18.65 | $18.65 | $18.65 |
| 0150 | Snowplowable raised pavement marker (808-75998) | EACH | 1,188 | $31.55 | $31.55 | $31.55 | $31.55 | $31.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.