INDOT contract R-41437-A bid tabulation
AUXILIARY LANES AND TWO-WAY LEFT TURN LANES. Let by Indiana DOT on March 12, 2025, Laporte, LaPorte. 3 bids received; low bid $29,321,613 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 190
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $29,321,613 | Low |
| 2 | Milestone Contractors LP | $35,877,000 | +22% |
| 3 | F H Paschen S N Nielsen & Associates LLC | $36,848,125 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. F H Paschen S N Nielsen & Associates LLC |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $501,675 | $510,000 | $1,500,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 15 | $900.00 | $2,100.00 | $2,298.65 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 15 | $650.00 | $1,400.00 | $1,777.18 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0012 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0013 | Mobilization and demobilization (110-01001) | LS | 1 | $157,705 | $1,790,000 | $1,844,000 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $75,915 | $710,000 | $600,000 |
| 0015 | Pavement removal (202-02240) | SYS | 26,173 | $20.00 | $24.00 | $30.99 |
| 0016 | Paved side ditch, remove (202-02272) | LFT | 691 | $12.00 | $12.00 | $13.92 |
| 0017 | Pipe abandon and grout fill (202-02637) | LFT | 1,118 | $38.00 | $131.00 | $31.90 |
| 0018 | Contaminated soil, remove (202-06580) | CYS | 878 | $31.00 | $195.00 | $127.72 |
| 0019 | Guardrail end treatment, remove (202-93741) | EACH | 10 | $525.00 | $525.00 | $525.00 |
| 0020 | Pipe, remove (202-96133) | LFT | 97 | $98.00 | $36.00 | $59.40 |
| 0021 | Excavation, common (203-02000) | CYS | 123,970 | $31.00 | $36.00 | $30.17 |
| 0022 | Borrow (203-02070) | CYS | 7,150 | $28.00 | $53.00 | $18.60 |
| 0023 | Pump around (205-11626) | EACH | 5 | $19,530 | $2,000.00 | $70,000 |
| 0024 | Stormwater management budget (205-12108) | DOL | 660,227 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $75,175 | $118,000 | $15,000 |
| 0026 | SWQCP preparation (205-12618) | LS | 1 | $10,000 | $4,800.00 | $7,500.00 |
| 0027 | Subgrade treatment, type II (207-08264) | SYS | 13,033 | $26.50 | $39.00 | $32.67 |
| 0028 | Subgrade treatment, type IC (207-09935) | SYS | 4,192 | $41.50 | $61.15 | $46.45 |
| 0029 | Subgrade treatment, type ibc (207-12635) | SYS | 117,241 | $12.00 | $14.40 | $12.02 |
| 0030 | Structure backfill, type 1 (211-09264) | CYS | 704 | $70.00 | $77.00 | $1,668.46 |
| 0031 | Structure backfill, type 5 (211-09268) | CYS | 1,013 | $142.50 | $150.00 | $383.77 |
| 0032 | Geogrid, type IB (214-11796) | SYS | 1,284 | $0.75 | $2.00 | $3.81 |
| 0033 | Geotextile for pavement, type 2A (214-12238) | SYS | 2,572 | $1.50 | $2.60 | $5.28 |
| 0034 | Compacted aggregate, no. 5 (301-12232) | CYS | 397 | $130.00 | $170.00 | $104.77 |
| 0035 | Compacted aggregate, no. 8 (301-12233) | CYS | 19 | $578.00 | $238.00 | $227.44 |
| 0036 | Compacted aggregate, no. 53 (301-12234) | CYS | 8,843 | $73.25 | $84.00 | $79.61 |
| 0037 | Dense graded subbase (302-07455) | CYS | 45 | $175.00 | $315.00 | $242.09 |
| 0038 | Compacted aggregate, no. 53 (303-01180) | TON | 308 | $105.00 | $88.00 | $84.37 |
| 0039 | Compacted aggregate, no. 73 (303-07449) | TON | 12,062 | $31.50 | $35.00 | $41.18 |
| 0040 | Widening with HMA, type D (304-07789) | TON | 18,969 | $73.00 | $86.00 | $93.71 |
| 0041 | HMA patching, full depth, type B (304-12623) | TON | 11 | $330.00 | $370.00 | $549.64 |
| 0042 | HMA patching, full depth, type D (304-12627) | TON | 2,523 | $114.00 | $204.40 | $183.40 |
| 0043 | HMA patching, partial depth, type D (304-12628) | TON | 521 | $97.00 | $114.30 | $180.46 |
| 0044 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 271 | $18.00 | $24.00 | $1.64 |
| 0045 | Milling, asphalt, 2 in. (306-08036) | SYS | 154,202 | $1.35 | $2.40 | $1.65 |
| 0046 | Milling, approach (306-08432) | SYS | 1,598 | $6.00 | $10.00 | $2.86 |
| 0047 | Milling, asphalt, 4 1/2 in. (306-10113) | SYS | 2,107 | $7.00 | $16.70 | $9.30 |
| 0048 | Milling, profile (306-11872) | SYS | 36,870 | $1.50 | $5.30 | $1.89 |
| 0049 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 5,053 | $76.49 | $98.00 | $79.83 |
| 0050 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 27,918 | $84.00 | $108.00 | $87.50 |
| 0051 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 8,985 | $76.50 | $92.00 | $79.83 |
| 0052 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 12,094 | $81.00 | $92.00 | $84.43 |
| 0053 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 35,917 | $72.50 | $86.00 | $75.48 |
| 0054 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 213 | $85.75 | $120.00 | $89.29 |
| 0055 | Joint adhesive, intermediate (401-10259) | LFT | 133,837 | $0.50 | $0.10 | $0.53 |
| 0056 | Inertial profiler, HMA (401-12169) | LS | 1 | $2,100.00 | $18,000 | $9,210.88 |
| 0057 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 239,817 | $2.70 | $2.28 | $2.28 |
| 0058 | Asphalt for tack coat (406-05520) | TON | 199 | $665.00 | $675.00 | $690.82 |
| 0059 | Cracks in asphalt pavement, fill (408-12028) | TON | 13 | $1,500.00 | $780.00 | $3,709.94 |
| 0060 | Guardrail connector system, W-beam, curved, type 2 (601-01626) | EACH | 1 | $2,401.00 | $2,401.00 | $2,401.00 |
| 0061 | Guardrail terminal system, W-beam curved, type 6 (601-01839) | EACH | 1 | $3,692.00 | $3,692.00 | $3,692.00 |
| 0062 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 22 | $2,882.00 | $2,882.00 | $2,882.00 |
| 0063 | Guardrail, remove (601-02241) | LFT | 2,287.50 | $2.00 | $2.00 | $2.00 |
| 0064 | Guardrail, reset (601-06035) | LFT | 1,175 | $15.00 | $15.00 | $15.00 |
| 0065 | Hand dig guardrail post holes (601-09238) | EACH | 10 | $105.00 | $105.00 | $105.00 |
| 0066 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 10,217.25 | $24.00 | $24.00 | $24.00 |
| 0067 | Guardrail height transition, MGS (601-12289) | EACH | 25 | $1,321.00 | $1,321.00 | $1,321.00 |
| 0068 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,343.00 | $3,343.00 | $3,343.00 |
| 0069 | Guardrail end treatment, type OS (601-94689) | EACH | 25 | $3,229.00 | $3,229.00 | $3,229.00 |
| 0070 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 68.75 | $40.00 | $40.00 | $40.00 |
| 0071 | Fence , farm field, modified (603-03829) | LFT | 267 | $194.00 | $133.00 | $102.04 |
| 0072 | Fence, farm field, 47 in. (603-06040) | LFT | 20 | $57.00 | $57.00 | $57.00 |
| 0073 | Fence, farm field, barbed wire , 5 foot (603-06042) | LFT | 157 | $39.00 | $39.00 | $39.00 |
| 0074 | Curb, concrete (605-06120) | LFT | 221 | $74.00 | $65.50 | $61.73 |
| 0075 | Curb, concrete, type B (605-06121) | LFT | 1,033 | $65.00 | $38.40 | $54.93 |
| 0076 | Curb and gutter, concrete, type B (605-06145) | LFT | 926 | $61.50 | $33.40 | $52.04 |
| 0077 | Center curb, concrete, type D (605-06215) | LFT | 745 | $70.25 | $117.40 | $96.82 |
| 0078 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 117,527 | $0.65 | $0.50 | $0.51 |
| 0079 | HMA for approaches, type B (610-07487) | TON | 4,756 | $104.00 | $156.00 | $153.09 |
| 0080 | PCCP for approaches, 6 in. (610-08446) | SYS | 243 | $215.00 | $210.00 | $350.00 |
| 0081 | PCCP for approaches, 9 in. (610-09108) | SYS | 21 | $560.00 | $340.00 | $550.00 |
| 0082 | Mailbox assembly, single (611-06497) | EACH | 60 | $308.00 | $308.00 | $308.00 |
| 0083 | Mailbox assembly, double (611-06498) | EACH | 4 | $615.00 | $615.00 | $615.00 |
| 0084 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $308.00 | $308.00 | $308.00 |
| 0085 | Right-of-way marker (615-06490) | EACH | 155 | $150.00 | $150.00 | $150.00 |
| 0086 | Monument, type A (615-06500) | EACH | 63 | $1,082.00 | $1,082.00 | $1,082.00 |
| 0087 | Monument, type B (615-06505) | EACH | 4 | $1,173.00 | $1,173.00 | $1,173.00 |
| 0088 | Monument, type C (615-06510) | EACH | 5 | $1,338.00 | $1,338.00 | $1,338.00 |
| 0089 | Monument, section corner (615-06527) | EACH | 1 | $1,246.00 | $1,249.00 | $1,246.00 |
| 0090 | Riprap, class 1 (616-05688) | TON | 1,037 | $152.00 | $142.00 | $98.14 |
| 0091 | Riprap, class 2 (616-05689) | TON | 81 | $316.00 | $164.00 | $143.22 |
| 0092 | Riprap, revetment (616-06405) | TON | 1,237 | $89.00 | $88.00 | $75.02 |
| 0093 | Geotextile for riprap, type 1A (616-12246) | SYS | 4,041 | $0.95 | $2.00 | $4.02 |
| 0094 | Geotextile for riprap, type 2B (616-12249) | SYS | 213 | $1.70 | $8.00 | $7.62 |
| 0095 | Riprap, grouted, 18 in. (616-93019) | SYS | 938 | $160.00 | $170.00 | $121.53 |
| 0096 | Mobilization and demobilization for seeding (621-01004) | EACH | 12 | $300.00 | $300.00 | $485.00 |
| 0097 | Erosion control blanket (621-02770) | SYS | 43,120 | $1.80 | $1.80 | $1.49 |
| 0098 | Seed mixture, native (621-03909) | LBS | 484 | $64.00 | $64.00 | $40.00 |
| 0099 | Seed mixture , wetland (621-04258) | LBS | 227 | $197.00 | $197.00 | $172.00 |
| 0100 | Fertilizer , for permanent seeding (621-06545) | TON | 13 | $990.00 | $990.00 | $1,050.00 |
| 0101 | Seed mixture, type R (621-06553) | LBS | 5,598 | $4.36 | $4.36 | $5.90 |
| 0102 | Mulching material (621-06565) | TON | 44 | $795.00 | $795.00 | $522.00 |
| 0103 | Water (621-06567) | KGAL | 48 | $5.00 | $5.00 | $100.00 |
| 0104 | Sodding (621-06574) | SYS | 11,734 | $4.65 | $4.65 | $7.80 |
| 0105 | Fiber mat, coconut (621-07657) | SYS | 5,069 | $4.38 | $4.38 | $3.34 |
| 0106 | Fiber mat, coconut , with straw (621-07657) | SYS | 3,288 | $3.56 | $3.56 | $2.22 |
| 0107 | Plant, deciduous shrub, 36 in. to 48 in. (622-05641) | EACH | 8 | $225.00 | $225.00 | $125.00 |
| 0108 | Computer system equipment (628-11976) | EACH | 2 | $1,350.00 | $1,350.00 | $1,464.73 |
| 0109 | Field office, type D (628-12683) | MOS | 30 | $2,875.00 | $3,500.00 | $3,750.00 |
| 0110 | Temporary shoring (702-04325) | LS | 1 | $10,000 | $86,000 | $250,000 |
| 0111 | Concrete, A (702-90915) | CYS | 3 | $360.00 | $2,900.00 | $3,086.70 |
| 0112 | Embedded galvanic anode (703-08247) | EACH | 61 | $42.00 | $50.00 | $50.64 |
| 0113 | Patching concrete structures (710-09158) | SFT | 180 | $210.00 | $150.00 | $193.66 |
| 0114 | Waterproofing membrane type 2 (714-000086) | SFT | 3,715 | $4.00 | $7.60 | $4.51 |
| 0115 | Structure extension, reinforced concrete, box sections, 5 FT X 3 FT (714-12489) | LFT | 23 | $5,640.00 | $3,600.00 | $1,800.00 |
| 0116 | Structure extension, reinforced concrete, box sections, 4 FT X 2 FT (714-12886) | LFT | 34 | $850.00 | $1,900.00 | $750.00 |
| 0117 | Structure extension, reinforced concrete, box sections, 7 FT X 6 FT (714-12926) | LFT | 43 | $6,245.00 | $4,400.00 | $1,875.00 |
| 0118 | Clean existing pipe (715-01354) | LFT | 1,410 | $80.00 | $30.00 | $47.21 |
| 0119 | Safety metal end section, 4:1, diameter 36 in. (715-02397) | EACH | 2 | $5,455.00 | $4,200.00 | $5,158.44 |
| 0120 | Safety metal end section, 4:1, diameter 15 in. (715-03475) | EACH | 23 | $2,110.00 | $940.00 | $1,608.40 |
| 0121 | Safety metal end section, 4:1, diameter 18 in. (715-03584) | EACH | 2 | $2,340.00 | $1,200.00 | $1,827.59 |
| 0122 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 72 | $66.00 | $63.00 | $95.46 |
| 0123 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 108 | $132.00 | $61.00 | $101.03 |
| 0124 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 331 | $88.00 | $65.00 | $98.72 |
| 0125 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 233 | $126.00 | $79.00 | $129.26 |
| 0126 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 2,862 | $67.00 | $61.00 | $95.90 |
| 0127 | Pipe, type 3, circular, diameter 18 in. (715-05171) | LFT | 348 | $62.00 | $66.00 | $99.90 |
| 0128 | Pipe extension, circular, diameter 24 in. , VCP (715-05597) | LFT | 47 | $210.00 | $260.00 | $267.38 |
| 0129 | Pipe extension, circular, diameter 30 in. , RCP (715-05889) | LFT | 15 | $385.00 | $780.00 | $235.68 |
| 0130 | Safety metal end section, 3:1, diameter 36 in. (715-12906) | EACH | 6 | $6,905.00 | $5,530.00 | $6,258.41 |
| 0131 | Pipe end section, diameter 15 in. (715-46005) | EACH | 99 | $992.00 | $575.00 | $2,123.75 |
| 0132 | Pipe end section, diameter 18 in. (715-46010) | EACH | 11 | $1,030.00 | $700.00 | $2,330.74 |
| 0133 | Pipe end section, diameter 24 in. (715-46020) | EACH | 3 | $1,325.00 | $1,400.00 | $3,306.12 |
| 0134 | Pipe end section, diameter 30 in. (715-46030) | EACH | 1 | $2,340.00 | $1,600.00 | $4,023.11 |
| 0135 | Pipe end section, diameter 36 in. (715-46040) | EACH | 9 | $2,900.00 | $2,200.00 | $4,823.12 |
| 0136 | Pipe installation, trenchless, 36 in. (716-07635) | LFT | 995 | $965.00 | $954.00 | $968.74 |
| 0137 | Pipe installation, trenchless, 42 in. (716-07636) | LFT | 123 | $1,020.00 | $1,011.00 | $1,140.44 |
| 0138 | Inlet, type E7 (720-45030) | EACH | 3 | $2,710.00 | $4,200.00 | $3,297.49 |
| 0139 | Inlet, type H5 (720-45041) | EACH | 6 | $5,115.00 | $4,600.00 | $6,263.52 |
| 0140 | Inlet, type P12A (720-45070) | EACH | 1 | $6,125.00 | $7,100.00 | $5,033.98 |
| 0141 | Manhole, type C4 (720-45410) | EACH | 4 | $6,560.00 | $5,000.00 | $4,904.80 |
| 0142 | Structure extension, reinforced concrete, three-sided sections, 240 in. X 120 in. (723-12895) | LFT | 24 | $57,105 | $43,300 | $21,500 |
| 0143 | Patroller (801-06198) | DAY | 600 | $1.00 | $1,100.00 | $1,585.71 |
| 0144 | Temporary pavement marking, 6 in. (801-06206) | LFT | 41,012 | $0.38 | $0.45 | $0.38 |
| 0145 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 376,082 | $1.51 | $1.65 | $1.51 |
| 0146 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 101 | $188.00 | $190.00 | $188.00 |
| 0147 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 1,253 | $10.37 | $9.00 | $10.37 |
| 0148 | Temporary traffic signal installation, maintain (801-06539) | LS | 1 | $7,520.89 | $7,520.89 | $7,520.89 |
| 0149 | Construction sign, type A (801-06640) | EACH | 115 | $231.00 | $240.00 | $231.00 |
| 0150 | Construction sign, type B (801-06645) | EACH | 106 | $114.00 | $200.00 | $114.00 |
| 0151 | Flashing arrow sign (801-06710) | DAY | 3,150 | $14.00 | $18.00 | $14.00 |
| 0152 | Maintaining traffic (801-06775) | LS | 1 | $1,107,867 | $535,835 | $1,923,566 |
| 0153 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 38 | $6,592.00 | $6,592.00 | $6,592.00 |
| 0154 | Barricade, type III-B (801-07119) | LFT | 912 | $15.24 | $17.00 | $15.24 |
| 0155 | Temporary traffic barrier, type 2 (801-08401) | LFT | 13,384 | $45.00 | $45.00 | $45.00 |
| 0156 | Portable changeable message sign (801-11642) | EACH | 6 | $5,081.00 | $12,000 | $5,081.00 |
| 0157 | Truck mounted attenuator (801-12042) | DAY | 600 | $1.00 | $450.00 | $117.00 |
| 0158 | Law enforcement officer (801-12324) | HRS | 2,400 | $60.00 | $60.00 | $60.00 |
| 0159 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 20 | $1,195.00 | $350.00 | $1,195.00 |
| 0160 | Signal head relocate (801-94295) | EACH | 6 | $626.74 | $626.74 | $626.74 |
| 0161 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 1,871 | $33.05 | $33.05 | $33.05 |
| 0162 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 333 | $30.31 | $30.31 | $30.31 |
| 0163 | Sign post, square, type 3, unreinforced anchor base (802-05706) | LFT | 47 | $38.29 | $38.29 | $38.29 |
| 0164 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 845 | $30.79 | $30.79 | $30.79 |
| 0165 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 532 | $31.79 | $31.79 | $31.79 |
| 0166 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 78 | $34.27 | $34.27 | $34.27 |
| 0167 | Sign, ground mounted, reset (802-91122) | EACH | 21 | $223.86 | $223.86 | $223.86 |
| 0168 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 440 | $1.01 | $1.01 | $1.01 |
| 0169 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 80 | $26.92 | $26.92 | $26.92 |
| 0170 | Signal detector housing adjust to grade (805-92951) | EACH | 2 | $413.27 | $413.27 | $413.27 |
| 0171 | Ground mounted electrical unit, relocate (807-12907) | EACH | 3 | $1,093.20 | $1,093.20 | $1,093.20 |
| 0172 | Pavement message marking, remove (808-05866) | SYS | 11 | $38.15 | $50.00 | $38.15 |
| 0173 | Line, remove (808-06716) | LFT | 14,201 | $0.55 | $0.60 | $0.55 |
| 0174 | Retro-reflectivity testing (808-09381) | LS | 1 | $4,500.00 | $2,500.00 | $4,500.00 |
| 0175 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 59,970 | $0.81 | $1.00 | $0.81 |
| 0176 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 15,329 | $0.81 | $1.00 | $0.81 |
| 0177 | Grooving for pavement markings (808-12032) | LFT | 160,262 | $0.61 | $0.50 | $0.61 |
| 0178 | Line, preformed plastic, broken, yellow, 6 in. (808-12845) | LFT | 12,761 | $6.34 | $7.40 | $6.34 |
| 0179 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 4,440 | $6.09 | $6.90 | $6.09 |
| 0180 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 16,713 | $6.34 | $7.40 | $6.34 |
| 0181 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 51,049 | $6.09 | $6.90 | $6.09 |
| 0182 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 213 | $5.88 | $10.00 | $5.88 |
| 0183 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 485 | $13.88 | $15.00 | $13.88 |
| 0184 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 156 | $214.00 | $175.00 | $214.00 |
| 0185 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 590 | $19.11 | $30.31 | $19.11 |
| 0186 | Snowplowable raised pavement marker (808-75998) | EACH | 590 | $31.80 | $45.00 | $31.80 |
| 0187 | Line, thermoplastic, for buzz strips, 8 in. (808-97323) | LFT | 288 | $19.80 | $10.00 | $19.80 |
| 0188 | Testing for wastes, type C (202-07603) | EACH | 2 | $500.00 | $4,320.00 | $7,363.39 |
| 0189 | Road closure sign assembly (801-04308) | EACH | 8 | $254.00 | $350.00 | $254.00 |
| 0190 | HMA for temporary pavement, type D (402-10087) | TON | 729 | $113.00 | $190.00 | $166.54 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.