INDOT contract R-43918-A bid tabulation
INTERCHANGE MODIFICATION. Let by Indiana DOT on October 7, 2026, Jasper, LaPorte. 3 bids received; low bid $7,430,731 by F H Paschen S N Nielsen & Associates LLC.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 122
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | F H Paschen S N Nielsen & Associates LLC | $7,430,731 | Low |
| 2 | Milestone Contractors LP | $7,441,984 | 0.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $7,978,587 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. F H Paschen S N Nielsen & Associates LLC | 2. Milestone Contractors LP | 3. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $369,268 | $30,000 | $192,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $371,500 | $371,750 | $780,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $148,600 | $94,000 | $282,800 |
| 0013 | Pavement removal (202-02240) | SYS | 225 | $47.60 | $65.00 | $77.00 |
| 0014 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $10,000 | $30,000 | $6,600.00 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 4 | $426.00 | $426.00 | $426.00 |
| 0016 | Excavation, common (203-02000) | CYS | 17,040 | $51.75 | $50.00 | $25.00 |
| 0017 | Borrow (203-02070) | CYS | 9,607 | $45.44 | $47.00 | $20.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 30,400 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $36,000 | $106,926 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $2,350.00 | $2,950.00 | $5,470.00 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 20,994 | $33.51 | $39.00 | $37.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 662 | $5.05 | $4.75 | $6.50 |
| 0023 | Compacted aggregate, no. 8 (301-12233) | CYS | 285 | $110.86 | $75.00 | $110.00 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 2,487 | $70.10 | $60.00 | $83.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 156 | $117.21 | $98.00 | $113.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 622 | $54.95 | $44.00 | $68.00 |
| 0027 | Lean concrete base, 9 in. (309-12695) | SYS | 314 | $110.28 | $100.00 | $0.01 |
| 0028 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 1,625 | $111.75 | $110.00 | $130.00 |
| 0029 | HMA for temporary pavement, type D (402-10087) | TON | 3,915 | $163.33 | $217.00 | $159.00 |
| 0030 | QC/QA-PCCP, 11 in. (501-06322) | SYS | 8,524 | $112.68 | $112.00 | $130.00 |
| 0031 | PCCP, 9 in. (502-06457) | SYS | 1,456 | $72.28 | $100.00 | $89.00 |
| 0032 | D-1 contraction joint (503-05240) | LFT | 6,747 | $18.66 | $20.00 | $29.50 |
| 0033 | Jointed reinforced concrete pavement, 12 in. (503-12476) | SYS | 432 | $202.55 | $218.00 | $187.00 |
| 0034 | Terminal joint, type PCCP (503-12478) | LFT | 451 | $99.20 | $295.00 | $0.01 |
| 0035 | Expansion joint with load transfer (503-12479) | LFT | 98 | $69.14 | $28.00 | $71.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 646 | $3.00 | $3.00 | $3.00 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 70 | $23.00 | $23.00 | $23.00 |
| 0038 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,212.00 | $3,212.00 | $3,212.00 |
| 0039 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 2 | $1,300.00 | $1,300.00 | $1,300.00 |
| 0040 | Guardrail end treatment, type OS , MSKT, TL-2 (601-94689) | EACH | 2 | $2,900.00 | $2,900.00 | $2,900.00 |
| 0041 | Curb, integral concrete (605-06090) | LFT | 4,867 | $30.79 | $29.00 | $41.00 |
| 0042 | Curb, integral concrete, type B (605-06095) | LFT | 228 | $26.23 | $94.00 | $93.00 |
| 0043 | Curb, integral concrete, type B , modified (605-06095) | LFT | 20 | $64.04 | $195.00 | $116.00 |
| 0044 | Curb, integral concrete, modified (605-06105) | LFT | 1,235 | $48.24 | $43.00 | $64.00 |
| 0045 | Center curb, concrete, type D (605-06255) | SYS | 385 | $141.93 | $255.00 | $220.00 |
| 0046 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 228 | $158.18 | $295.00 | $270.00 |
| 0047 | Monument, type A (615-06500) | EACH | 2 | $1,133.00 | $1,133.00 | $2,633.00 |
| 0048 | Riprap, revetment (616-06405) | TON | 310 | $115.14 | $175.00 | $220.06 |
| 0049 | Geotextile for riprap, type 2B (616-12249) | SYS | 844 | $4.54 | $4.75 | $3.42 |
| 0050 | Inspection hole (616-93772) | EACH | 5 | $1,675.88 | $500.00 | $1,175.00 |
| 0051 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $550.00 | $712.50 | $550.00 |
| 0052 | Seed mixture, type R (621-06553) | LBS | 1,190 | $5.25 | $6.90 | $5.25 |
| 0053 | Mulching material (621-06565) | TON | 12 | $545.00 | $540.00 | $545.00 |
| 0054 | Water (621-06567) | KGAL | 121 | $10.00 | $100.00 | $10.00 |
| 0055 | Sodding, nursery (621-06575) | SYS | 1,626 | $5.95 | $9.00 | $12.46 |
| 0056 | Field office, type C (628-09403) | MOS | 12 | $2,781.90 | $3,000.00 | $5,359.62 |
| 0057 | Computer system equipment (628-11976) | EACH | 4 | $583.58 | $995.00 | $668.23 |
| 0058 | Topsoil processing and distribution (629-000149) | SYS | 30,060.38 | $2.97 | $4.95 | $11.00 |
| 0059 | Topsoil amendment budget (629-000150) | DOL | 66,734.05 | $1.00 | $1.00 | $1.00 |
| 0060 | Reinforcing bars, epoxy coated (703-06029) | LBS | 14,654 | $1.64 | $2.15 | $2.24 |
| 0061 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $2,556.29 | $6,900.00 | $4,400.00 |
| 0062 | Surface seal , bridge no 1 (709-51821) | LS | 1 | $500.00 | $1,500.00 | $1.00 |
| 0063 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 4,428 | $35.38 | $30.00 | $24.00 |
| 0064 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 218 | $46.57 | $40.00 | $58.00 |
| 0065 | Outlet protector, type 1 (718-06528) | EACH | 12 | $1,895.97 | $500.00 | $3,240.00 |
| 0066 | Geotextile for underdrains, type 2B (718-12308) | SYS | 3,037 | $3.23 | $5.00 | $9.20 |
| 0067 | Aggregate for underdrains (718-52610) | CYS | 400 | $80.43 | $80.00 | $247.00 |
| 0068 | Longitudinal grooving (722-12732) | SYS | 216 | $23.28 | $25.00 | $16.21 |
| 0069 | Road closure sign assembly (801-04308) | EACH | 6 | $175.00 | $175.00 | $233.00 |
| 0070 | Temporary pavement marking, 6 in. (801-06206) | LFT | 10,929 | $0.45 | $0.45 | $0.33 |
| 0071 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,456 | $2.25 | $2.25 | $1.88 |
| 0072 | Detour route marker assembly (801-06625) | EACH | 76 | $150.00 | $150.00 | $138.00 |
| 0073 | Construction sign, type A (801-06640) | EACH | 46 | $165.00 | $165.00 | $178.00 |
| 0074 | Construction sign, type B (801-06645) | EACH | 10 | $135.00 | $135.00 | $100.00 |
| 0075 | Maintaining traffic (801-06775) | LS | 1 | $300,000 | $31,000 | $244,953 |
| 0076 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $6,583.00 | $6,583.00 | $12,000 |
| 0077 | Barricade, type III-A (801-07118) | LFT | 197 | $18.00 | $18.00 | $14.44 |
| 0078 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 4,440 | $42.95 | $58.25 | $43.00 |
| 0079 | Portable changeable message sign (801-11642) | EACH | 9 | $2,950.00 | $2,950.00 | $3,434.00 |
| 0080 | Law enforcement officer (801-12324) | HRS | 114 | $75.00 | $75.00 | $75.00 |
| 0081 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $450.00 | $450.00 | $891.00 |
| 0082 | Temporary buzz strips (801-97643) | LFT | 1,152 | $17.75 | $17.75 | $14.20 |
| 0083 | Sign, panel, remove (802-03783) | EACH | 2 | $3,089.89 | $3,089.89 | $3,089.89 |
| 0084 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 317 | $33.83 | $33.83 | $33.83 |
| 0085 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 42 | $28.95 | $28.95 | $28.95 |
| 0086 | Sign, panel, with legend (802-07057) | SFT | 495 | $49.17 | $49.17 | $49.17 |
| 0087 | Sign, sheet assembly, relocate (802-07058) | EACH | 9 | $243.59 | $243.59 | $243.59 |
| 0088 | Sign, sheet, and supports, remove (802-07059) | EACH | 23 | $158.86 | $158.86 | $158.86 |
| 0089 | Sign, sheet, relocate (802-07060) | EACH | 10 | $130.49 | $130.49 | $130.49 |
| 0090 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 143 | $29.56 | $29.56 | $29.56 |
| 0091 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 100 | $30.98 | $30.98 | $30.98 |
| 0092 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 51 | $34.80 | $34.80 | $34.80 |
| 0093 | Wide flange sign post support foundation, type A (802-12222) | EACH | 2 | $2,056.24 | $2,056.24 | $2,056.24 |
| 0094 | Wide flange sign post support foundation, type B (802-12223) | EACH | 6 | $2,267.44 | $2,267.44 | $2,267.44 |
| 0095 | Structural steel, breakaway (802-76095) | LBS | 2,751 | $10.18 | $10.18 | $10.18 |
| 0096 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 500 | $23.36 | $23.36 | $23.36 |
| 0097 | Handhole, lighting (807-02191) | EACH | 13 | $2,532.85 | $2,532.85 | $2,532.85 |
| 0098 | Service point, II, modified (807-02194) | EACH | 2 | $6,745.52 | $6,745.52 | $6,745.52 |
| 0099 | Light structure, remove (807-03934) | EACH | 4 | $868.97 | $868.97 | $868.97 |
| 0100 | Luminaire, low lumen roadway (807-12202) | EACH | 32 | $828.52 | $828.52 | $828.52 |
| 0101 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 24 | $2,094.48 | $2,094.48 | $2,298.61 |
| 0102 | Light pole, 40 FT E.M.H., 5 FT mast arm, breakaway base (807-85740) | EACH | 16 | $3,850.02 | $3,850.02 | $3,850.02 |
| 0103 | Light pole, 40 FT E.M.H., 10 FT mast arm, breakaway base (807-85752) | EACH | 8 | $4,402.80 | $4,402.80 | $4,402.80 |
| 0104 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 3,455 | $2.70 | $2.70 | $2.70 |
| 0105 | Connector kit, unfused (807-86910) | EACH | 32 | $51.22 | $51.22 | $51.22 |
| 0106 | Connector kit, fused (807-86915) | EACH | 32 | $51.22 | $51.22 | $51.22 |
| 0107 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 70 | $35.48 | $35.48 | $35.48 |
| 0108 | Multiple compression fitting, waterproofed (807-86925) | EACH | 52 | $47.29 | $47.29 | $47.29 |
| 0109 | Insulation link, non- waterproofed (807-86930) | EACH | 76 | $24.33 | $24.33 | $24.33 |
| 0110 | Insulation link, waterproofed (807-86935) | EACH | 68 | $24.33 | $24.33 | $24.33 |
| 0111 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 32 | $126.38 | $126.38 | $126.38 |
| 0112 | Cable-duct marker (807-86955) | EACH | 18 | $505.00 | $505.00 | $505.00 |
| 0113 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 7,100 | $18.86 | $18.86 | $18.86 |
| 0114 | Line, remove (808-06716) | LFT | 5,328 | $0.41 | $0.41 | $0.51 |
| 0115 | Transverse marking, multi-component, crosshatch line, yellow, 12 in. (808-10042) | LFT | 197 | $9.00 | $9.00 | $8.59 |
| 0116 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 4,969 | $0.80 | $0.80 | $0.79 |
| 0117 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 3,982 | $0.80 | $0.80 | $0.79 |
| 0118 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 35 | $0.80 | $0.80 | $1.64 |
| 0119 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 8 | $225.00 | $225.00 | $221.00 |
| 0120 | Transverse marking, multi-component, yield line, white, 24 in. (808-11776) | LFT | 78 | $14.00 | $14.00 | $16.94 |
| 0121 | Grooving for pavement markings (808-12032) | LFT | 9,587 | $0.50 | $0.50 | $0.63 |
| 0122 | Line, multi-component, dotted, white, 12 in. (808-12700) | LFT | 326 | $9.00 | $9.00 | $4.88 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.