INDOT contract R-43027-C bid tabulation
HMA OVERLAY, SMALL STRUCTURE REPLACEMENT, TRAFFIC SIGNALS. Let by Indiana DOT on October 7, 2026, Laporte, Porter, LaPorte. 2 bids received; low bid $13,597,654 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 203
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $13,597,654 | Low |
| 2 | Milestone Contractors LP | $16,046,758 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $391,380 | $80,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 24 | $665.00 | $3,000.00 |
| 0003 | Railroad flagging budget (107-12976) | DOL | 121,500 | $1.00 | $1.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0011 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0012 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0013 | Mobilization and demobilization (110-01001) | LS | 1 | $720,500 | $650,500 |
| 0014 | Tree, 6 in., remove (201-02245) | EACH | 2 | $250.00 | $1,785.00 |
| 0015 | Tree, 10 in., remove (201-02250) | EACH | 5 | $500.00 | $1,785.00 |
| 0016 | Tree, 18 in., remove (201-02255) | EACH | 1 | $1,500.00 | $1,785.00 |
| 0017 | Tree, 30 in., remove (201-02260) | EACH | 1 | $2,400.00 | $1,785.00 |
| 0018 | Clearing right-of-way (201-52370) | LS | 1 | $31,420 | $52,000 |
| 0019 | Structures and obstructions, remove (202-01000) | LS | 1 | $91,700 | $87,000 |
| 0020 | Pavement removal (202-02240) | SYS | 9,615 | $18.75 | $25.00 |
| 0021 | Curb, concrete, remove (202-02278) | LFT | 422 | $82.00 | $55.00 |
| 0022 | Delineator post, remove (202-04435) | EACH | 30 | $5.00 | $300.00 |
| 0023 | Sidewalk concrete, remove (202-52710) | SYS | 802 | $86.50 | $40.00 |
| 0024 | Sign, remove (202-74035) | EACH | 31 | $90.00 | $105.00 |
| 0025 | Excavation, common (203-02000) | CYS | 1,650 | $72.50 | $42.00 |
| 0026 | Borrow (203-02070) | CYS | 1,585 | $72.00 | $22.00 |
| 0027 | Excavation, peat (203-02100) | CYS | 335 | $68.00 | $100.00 |
| 0028 | Pump around (205-11626) | EACH | 9 | $100.00 | $1,200.00 |
| 0029 | Stormwater management budget (205-12108) | DOL | 19,648 | $1.00 | $1.00 |
| 0030 | Stormwater management implementation (205-12616) | LS | 1 | $30,000 | $25,000 |
| 0031 | SWQCP preparation (205-12618) | LS | 1 | $3,290.00 | $2,261.00 |
| 0032 | Temporary sheet piling (206-93520) | SFT | 8,400 | $136.38 | $84.00 |
| 0033 | Subgrade treatment, type II (207-08264) | SYS | 892 | $41.00 | $35.00 |
| 0034 | Subgrade treatment, type IC (207-09935) | SYS | 8,211 | $63.50 | $52.00 |
| 0035 | B borrow (211-02050) | CYS | 1,350 | $83.50 | $125.00 |
| 0036 | Structure backfill, type 2 (211-09265) | CYS | 3,321 | $82.00 | $175.00 |
| 0037 | Structure backfill, type 5 (211-09268) | CYS | 125 | $230.00 | $300.00 |
| 0038 | Geogrid, type IB (214-11796) | SYS | 160 | $4.50 | $5.75 |
| 0039 | Geotextile for pavement, type 2B (214-12239) | SYS | 998 | $4.10 | $4.50 |
| 0040 | Compacted aggregate, no. 8 (301-12233) | CYS | 65 | $175.00 | $175.00 |
| 0041 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,214 | $95.00 | $140.00 |
| 0042 | Compacted aggregate, no. 53 (303-01180) | TON | 355 | $72.00 | $75.00 |
| 0043 | Widening with HMA, type C (304-07494) | TON | 81 | $215.00 | $260.00 |
| 0044 | HMA patching, full depth, type C (304-12625) | TON | 165 | $393.00 | $470.00 |
| 0045 | HMA patching, full depth, type C , for curb installation (304-12625) | TON | 253 | $267.61 | $180.00 |
| 0046 | HMA patching, partial depth, type C (304-12626) | TON | 634 | $193.00 | $260.00 |
| 0047 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 256,619 | $2.50 | $2.85 |
| 0048 | Milling, transition (306-08043) | SYS | 1,255 | $6.90 | $6.00 |
| 0049 | Milling, approach (306-08432) | SYS | 14,567 | $12.75 | $3.75 |
| 0050 | Milling, profile (306-11872) | SYS | 2,747 | $5.75 | $0.65 |
| 0051 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 25 | $255.00 | $375.00 |
| 0052 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 23,182 | $117.25 | $129.00 |
| 0053 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 40 | $190.00 | $255.00 |
| 0054 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 1,350 | $128.50 | $120.00 |
| 0055 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 690 | $137.00 | $118.00 |
| 0056 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 1,967 | $108.00 | $115.00 |
| 0057 | Joint adhesive (401-11526) | LFT | 107,980 | $0.52 | $0.70 |
| 0058 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 46,115 | $3.70 | $4.50 |
| 0059 | Asphalt for tack coat (406-05520) | TON | 71.90 | $1,250.00 | $1,500.00 |
| 0060 | Cracks in asphalt pavement, fill (408-12028) | TON | 17 | $1,500.00 | $2,300.00 |
| 0061 | Guardrail, remove (601-02241) | LFT | 443 | $2.00 | $2.38 |
| 0062 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 350.75 | $24.00 | $28.56 |
| 0063 | Guardrail, MGS, long span, type 1 (601-12287) | EACH | 1 | $1,758.00 | $2,092.02 |
| 0064 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,900.00 | $3,451.00 |
| 0065 | Sidewalk, concrete (604-06070) | SYS | 320 | $132.00 | $220.00 |
| 0066 | Curb ramp, concrete (604-08086) | SYS | 482 | $250.00 | $245.00 |
| 0067 | Detectable warning surfaces (604-12083) | SYS | 80 | $335.00 | $245.00 |
| 0068 | Curb, integral concrete, modified (605-06105) | LFT | 147 | $108.00 | $90.00 |
| 0069 | Curb, concrete (605-06120) | LFT | 422 | $74.00 | $80.00 |
| 0070 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 537 | $83.50 | $85.00 |
| 0071 | Center curb, concrete, type C (605-06250) | SYS | 467 | $231.00 | $245.00 |
| 0072 | Milled HMA corrugations, conventional (606-12399) | LFT | 62,403 | $0.50 | $0.45 |
| 0073 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 50 | $20.00 | $5.50 |
| 0074 | HMA for approaches, type B (610-07487) | TON | 524 | $175.00 | $205.00 |
| 0075 | Right-of-way marker (615-06490) | EACH | 15 | $150.00 | $175.00 |
| 0076 | Monument, type B (615-06505) | EACH | 6 | $1,036.00 | $1,200.00 |
| 0077 | Riprap, revetment (616-06405) | TON | 158 | $120.00 | $225.00 |
| 0078 | Geotextile for riprap, type 1A (616-12246) | SYS | 240 | $2.50 | $7.00 |
| 0079 | Geotextile for riprap, type 2A (616-12248) | SYS | 171 | $6.00 | $15.00 |
| 0080 | Mobilization and demobilization for seeding (621-01004) | EACH | 7 | $375.00 | $654.50 |
| 0081 | Seeding wetland (621-02356) | LBS | 5 | $1,245.00 | $357.00 |
| 0082 | Erosion control blanket (621-02770) | SYS | 695 | $4.75 | $1.90 |
| 0083 | Mulched seeding, type U (621-06560) | SYS | 7,231 | $3.82 | $1.49 |
| 0084 | Topsoil (621-06570) | CYS | 852 | $95.00 | $112.00 |
| 0085 | Sodding (621-06574) | SYS | 42 | $69.90 | $30.94 |
| 0086 | Sodding, nursery (621-06575) | SYS | 311 | $153.64 | $20.23 |
| 0087 | Articulated concrete block (621-09815) | SYS | 70 | $550.00 | $430.00 |
| 0088 | Irrigation system , reset (622-07764) | LS | 1 | $5,000.00 | $9,500.00 |
| 0089 | Field office, type C (628-09403) | MOS | 24 | $6,000.00 | $1,500.00 |
| 0090 | Computer system equipment (628-11976) | EACH | 2 | $195.00 | $670.00 |
| 0091 | Topsoil processing and distribution (629-000149) | SYS | 5,109 | $11.00 | $8.00 |
| 0092 | Topsoil amendment budget (629-000150) | DOL | 11,342 | $1.00 | $1.00 |
| 0093 | Waterproofing membrane, type 2 (714-000086) | SFT | 7,315 | $3.60 | $23.00 |
| 0094 | Structure, reinforced concrete, box sections, 6 FT X 4 FT (714-11174) | LFT | 76 | $4,160.00 | $9,500.00 |
| 0095 | Structure, reinforced concrete, box sections, 11 FT X 10 FT (714-12898) | LFT | 165 | $5,580.00 | $15,000 |
| 0096 | Clean existing pipe (715-01354) | LFT | 367 | $80.00 | $55.00 |
| 0097 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 186 | $128.50 | $120.00 |
| 0098 | Pipe, type 1, circular, diameter 12 in. (715-05118) | LFT | 12 | $244.00 | $475.00 |
| 0099 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 230 | $392.00 | $175.00 |
| 0100 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 215 | $329.00 | $210.00 |
| 0101 | Pipe, type 1, circular, diameter 30 in. (715-05125) | LFT | 78 | $351.00 | $250.00 |
| 0102 | HMA for structure installation, type C (715-08306) | TON | 123 | $915.00 | $245.00 |
| 0103 | Pipe end section, diameter 15 in. (715-46005) | EACH | 6 | $2,635.00 | $1,750.00 |
| 0104 | Pipe end section, diameter 15 in. , concrete, with precast headwall (715-46005) | EACH | 3 | $10,360 | $5,500.00 |
| 0105 | Pipe end section, diameter 18 in. (715-46010) | EACH | 4 | $2,735.00 | $1,750.00 |
| 0106 | Pipe end section, diameter 18 in. , concrete, with precast headwall (715-46010) | EACH | 2 | $10,610 | $6,500.00 |
| 0107 | Pipe end section, diameter 30 in. (715-46030) | EACH | 1 | $3,290.00 | $3,500.00 |
| 0108 | Pipe end section, diameter 30 in. , concrete, with precast headwall (715-46030) | EACH | 1 | $11,740 | $10,500 |
| 0109 | Casting, inlet, adjust to grade (720-12797) | EACH | 9 | $1,600.00 | $1,750.00 |
| 0110 | Casting, manhole, adjust to grade (720-12798) | EACH | 11 | $1,600.00 | $1,250.00 |
| 0111 | Casting, type 1, furnish and adjust to grade (720-44010) | EACH | 2 | $2,555.00 | $3,200.00 |
| 0112 | Casting, type 2, furnish and adjust to grade (720-44015) | EACH | 5 | $2,515.00 | $2,500.00 |
| 0113 | Casting, type 7, furnish and adjust to grade (720-44040) | EACH | 1 | $1,980.00 | $2,500.00 |
| 0114 | Casting, type 8, furnish and adjust to grade (720-44045) | EACH | 6 | $2,350.00 | $2,250.00 |
| 0115 | Casting, type 10, furnish and adjust to grade (720-44055) | EACH | 6 | $2,445.00 | $2,500.00 |
| 0116 | Casting, type 13, furnish and adjust to grade (720-44070) | EACH | 4 | $2,770.00 | $2,500.00 |
| 0117 | Inlet, type A2 (720-45005) | EACH | 1 | $4,860.00 | $6,500.00 |
| 0118 | Inlet, type E7 (720-45030) | EACH | 2 | $4,320.00 | $5,500.00 |
| 0119 | Inlet, type F7, modified (720-45135) | EACH | 1 | $5,900.00 | $7,500.00 |
| 0120 | Manhole, type C4 (720-45410) | EACH | 1 | $10,605 | $14,000 |
| 0121 | Clean inlet (720-96995) | EACH | 6 | $1,395.00 | $1,250.00 |
| 0122 | Construction sign, type C (801-03290) | EACH | 2 | $145.00 | $311.78 |
| 0123 | Road closure sign assembly (801-04308) | EACH | 12 | $175.00 | $318.92 |
| 0124 | Temporary pavement marking, 6 in. (801-06206) | LFT | 81,685 | $0.25 | $0.40 |
| 0125 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 81,685 | $2.25 | $2.00 |
| 0126 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 116 | $65.00 | $212.45 |
| 0127 | Temporary pavement message marking, removable, (RXR) (801-06213) | EACH | 10 | $650.00 | $597.48 |
| 0128 | Detour route marker assembly (801-06625) | EACH | 37 | $125.00 | $180.88 |
| 0129 | Construction sign, type A (801-06640) | EACH | 95 | $147.00 | $258.23 |
| 0130 | Construction sign, type B (801-06645) | EACH | 75 | $115.00 | $138.04 |
| 0131 | Flashing arrow sign (801-06710) | DAY | 210 | $15.00 | $17.85 |
| 0132 | Maintaining traffic (801-06775) | LS | 1 | $305,700 | $470,000 |
| 0133 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 7 | $4,000.00 | $4,760.00 |
| 0134 | Barricade, type III-A (801-07118) | LFT | 108 | $12.25 | $19.06 |
| 0135 | Barricade, type III-B (801-07119) | LFT | 132 | $12.25 | $19.06 |
| 0136 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,050 | $59.00 | $58.00 |
| 0137 | Temporary curb ramp (801-11990) | EACH | 4 | $3,050.00 | $6,500.00 |
| 0138 | Truck mounted attenuator (801-12042) | DAY | 150 | $275.00 | $1,698.48 |
| 0139 | Temporary accessible pedestrian path (801-12641) | SYS | 256 | $205.00 | $100.00 |
| 0140 | Temporary pedestrian channelizer (801-12862) | LFT | 857 | $16.45 | $50.00 |
| 0141 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 957 | $28.58 | $28.56 |
| 0142 | Sign post, square, type 2, unreinforced anchor base (802-05705) | LFT | 83 | $27.52 | $30.94 |
| 0143 | Sign post, square, type 3, unreinforced anchor base (802-05706) | LFT | 42 | $50.33 | $34.51 |
| 0144 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 490 | $29.55 | $40.46 |
| 0145 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 171 | $30.94 | $42.84 |
| 0146 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 39 | $34.67 | $45.22 |
| 0147 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $168.24 | $357.00 |
| 0148 | Delineator post, flexible, type I (804-11920) | EACH | 2 | $176.62 | $493.85 |
| 0149 | Traffic signal equipment, remove (805-01300) | EACH | 8 | $2,071.34 | $1,832.60 |
| 0150 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 8 | $6,911.44 | $6,902.00 |
| 0151 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $1,094.77 | $1,904.00 |
| 0152 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 23 | $1,192.98 | $1,005.55 |
| 0153 | Controller, relocate and rewire (805-02437) | EACH | 1 | $2,288.97 | $1,071.00 |
| 0154 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $22,968 | $28,560 |
| 0155 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 12 | $1,816.40 | $1,368.50 |
| 0156 | Loop detector delay amplifier, counting, 2 channel (805-09539) | EACH | 20 | $462.68 | $595.00 |
| 0157 | Handhole, signal, type 2 (805-11744) | EACH | 13 | $2,036.79 | $2,725.10 |
| 0158 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 1,641 | $16.75 | $29.75 |
| 0159 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 1,049 | $37.60 | $36.89 |
| 0160 | Pedestrian push button, APS (805-11817) | EACH | 24 | $1,465.49 | $1,517.25 |
| 0161 | Traffic signal head, 3 (805-78205) | EACH | 14 | $1,508.58 | $1,939.70 |
| 0162 | Traffic signal head, 4 (805-78225) | EACH | 6 | $1,752.88 | $2,034.90 |
| 0163 | Signal pole, pedestal, 9 FT (805-78412) | EACH | 12 | $1,129.46 | $1,487.50 |
| 0164 | Span, catenary, and tether (805-78415) | EACH | 8 | $5,178.13 | $5,712.00 |
| 0165 | Disconnect hanger (805-78420) | EACH | 8 | $843.19 | $690.20 |
| 0166 | Signal service (805-78445) | EACH | 2 | $2,138.40 | $2,380.00 |
| 0167 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 11 | $9.07 | $11.90 |
| 0168 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 12,095 | $1.34 | $1.79 |
| 0169 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 4,188 | $3.77 | $5.71 |
| 0170 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 555 | $4.37 | $6.07 |
| 0171 | Signal cable, control, copper, 9C/14 gauge (805-78495) | LFT | 621 | $5.05 | $6.59 |
| 0172 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 7,888 | $2.64 | $2.62 |
| 0173 | Signal detector housing (805-78785) | EACH | 17 | $1,846.14 | $2,618.00 |
| 0174 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 4,015 | $14.00 | $17.85 |
| 0175 | Controller cabinet foundation, type P1 (805-78925) | EACH | 2 | $1,743.71 | $2,903.60 |
| 0176 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 8 | $12,014 | $19,040 |
| 0177 | Loop detector delay amplifier, non-counting, 2 channel (805-92504) | EACH | 10 | $376.27 | $511.70 |
| 0178 | Controller cabinet, type P (805-93067) | EACH | 1 | $18,685 | $26,180 |
| 0179 | Pedestrian push button, retrofit (805-96309) | EACH | 4 | $803.75 | $1,011.50 |
| 0180 | Pavement message marking, thermoplastic, bike symbol (808-02977) | EACH | 8 | $195.00 | $433.16 |
| 0181 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 1,413 | $14.00 | $15.60 |
| 0182 | Retro-reflectivity testing (808-09381) | LS | 1 | $6,000.00 | $3,570.00 |
| 0183 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 4,466 | $0.48 | $2.90 |
| 0184 | Grooving for pavement markings (808-12032) | LFT | 199,660 | $0.40 | $0.81 |
| 0185 | Line, thermoplastic, solid, white, 10 in. (808-12667) | LFT | 1,692 | $6.00 | $3.14 |
| 0186 | Line, thermoplastic, dotted, white, 10 in. (808-12850) | LFT | 1,025 | $6.00 | $5.88 |
| 0187 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 92,173 | $0.48 | $0.98 |
| 0188 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 87,302 | $0.48 | $0.98 |
| 0189 | Transverse marking, thermoplastic, crosshatch line, white, 8 in. (808-75256) | LFT | 40 | $6.00 | $7.07 |
| 0190 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 3,857 | $9.00 | $8.38 |
| 0191 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 21 | $14.00 | $15.49 |
| 0192 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 561 | $9.00 | $8.38 |
| 0193 | Transverse marking, thermoplastic, crosshatch line, yellow, 24 in. (808-75290) | LFT | 857 | $14.00 | $15.49 |
| 0194 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 1,754 | $14.00 | $15.49 |
| 0195 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 2,568 | $5.00 | $7.10 |
| 0196 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 172 | $145.00 | $251.09 |
| 0197 | Pavement message marking, thermoplastic, 'only' (808-75325) | EACH | 10 | $275.00 | $230.86 |
| 0198 | Pavement message marking, thermoplastic, ped xing (808-75330) | EACH | 2 | $350.00 | $349.86 |
| 0199 | Pavement message marking, thermoplastic, RXR (808-75340) | EACH | 9 | $650.00 | $1,242.36 |
| 0200 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 465 | $26.00 | $58.32 |
| 0201 | Snowplowable raised pavement marker (808-75998) | EACH | 93 | $17.00 | $21.96 |
| 0202 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 2,104 | $0.48 | $3.93 |
| 0203 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 13,765 | $0.48 | $1.33 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.