INDOT contract R-44384-A bid tabulation

SLIDE CORRECTION. Let by Indiana DOT on October 7, 2026, Fountain, Crawfordsville. 5 bids received; low bid $1,294,000 by Morphey Construction Inc..

Owner
Indiana DOT
Letting
07 OCT 2026
Pay items
53
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Morphey Construction Inc.$1,294,000Low
2Rieth-Riley Construction Co., Inc.$1,391,265+8.0%
3Beaty Construction Inc$1,475,956+14%
4Geospecialties LLC$1,476,022+14%
5Milestone Contractors LP$1,498,615+16%
INDOT contract R-44384-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Morphey Construction Inc.2. Rieth-Riley Construction Co., Inc.3. Beaty Construction Inc4. Geospecialties LLC5. Milestone Contractors LP
0001Construction engineering (105-06845)LS1$19,800$36,000$100,000$60,000$18,750
0002Inspection hole, deeper than 3 FT (107-09358)EACH5$950.00$2,650.00$1,100.00$892.91$1,500.00
0003Inspection hole, 3 FT deep or less (107-09367)EACH5$400.00$750.00$1,100.00$679.73$1,500.00
0004Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00
0005Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$64,700$122,000$73,797$65,000$107,350
0012Clearing right-of-way (201-52370)LS1$50,000$63,000$150,000$42,205$52,300
0013Guardrail end treatment, remove (202-93741)EACH2$175.00$425.00$425.00$489.00$550.00
0014Excavation, common (203-02000)CYS765$220.00$290.00$70.00$30.48$110.00
0015Stormwater management budget (205-12108)DOL6,877$1.00$1.00$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$1,400.00$1,600.00$25,000$1,380.00$1,415.00
0017Subgrade treatment, type IC (207-09935)SYS967$103.00$83.00$50.00$109.00$94.00
0018Compacted aggregate, no. 53 (303-01180)TON153$132.00$128.00$78.00$196.00$170.00
0019Milling, asphalt, 1 1/2 in. (306-08034)SYS1,713$10.00$8.50$7.00$3.00$11.00
0020QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON219$204.00$173.00$173.00$235.00$204.00
0021QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON139$240.00$191.00$191.00$276.00$240.00
0022QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON248$180.20$146.00$146.00$208.00$180.20
0023Joint adhesive (401-11526)LFT2,530$1.00$1.00$1.00$2.00$1.00
0024Asphalt for tack coat (406-05521)SYS3,498$0.30$0.01$0.01$1.00$0.30
0025Guardrail, remove (601-02241)LFT882$5.00$2.25$2.25$3.00$5.00
0026Guardrail terminal system, W-beam, curved, type 7 (601-05071)EACH1$3,600.00$3,600.00$3,600.00$4,140.00$2,750.00
0027Hand dig guardrail post holes (601-09238)EACH9$150.00$150.00$150.00$173.00$120.00
0028Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT850$26.00$26.00$26.00$30.00$27.00
0029Guardrail height transition, MGS (601-12289)EACH3$1,075.00$1,075.00$1,075.00$1,237.00$1,100.00
0030Guardrail end treatment, type OS (601-94689)EACH1$3,300.00$3,300.00$3,300.00$3,795.00$3,115.00
0031Mailbox assembly, reset, single (611-08232)EACH1$275.00$275.00$275.00$317.00$310.00
0032Right-of-way marker (615-06490)EACH4$200.00$200.00$200.00$230.00$150.00
0033Monument, type B (615-06505)EACH4$1,325.00$1,325.00$1,325.00$6,095.00$950.00
0034Monument, type C (615-06510)EACH1$1,325.00$1,325.00$1,325.00$1,524.00$685.00
0035Riprap, revetment (616-06405)TON105$200.00$0.01$100.00$77.02$260.00
0036Geotextile for riprap, type 2A (616-12248)SYS310$11.00$0.01$11.00$5.25$4.00
0037Mobilization and demobilization for seeding (621-01004)EACH1$650.00$1,500.00$1,500.00$1,725.00$650.00
0038Mulched seeding, type R (621-06559)SYS1,614$18.00$1.25$1.25$2.00$2.80
0039Field office, type C (628-09403)MOS12$2,500.00$7,380.00$3,000.00$3,127.81$5,300.00
0040Computer system equipment (628-11976)EACH1$800.00$540.00$850.00$933.04$750.00
0041Soil nailed wall (731-06223)SYS517$1,000.00$1,000.00$1,414.00$1,590.00$1,450.00
0042Construction sign, type C (801-03290)EACH1$350.00$350.00$200.00$255.00$200.00
0043Road closure sign assembly (801-04308)EACH6$150.00$150.00$280.00$173.00$280.00
0044Detour route marker assembly (801-06625)EACH39$75.00$75.00$120.00$87.00$120.00
0045Construction sign, type A (801-06640)EACH23$175.00$175.00$180.00$202.00$180.00
0046Maintaining traffic (801-06775)LS1$47,402$34,000$32,184$14,000$40,005
0047Barricade, type III-A (801-07118)LFT48$14.00$14.00$16.00$17.00$16.00
0048Barricade, type III-B (801-07119)LFT96$14.00$14.00$16.00$17.00$16.00
0049Sign post, square, type 1, reinforced anchor base (802-05701)LFT58$23.00$23.00$23.00$27.00$34.00
0050Sign, sheet assembly, relocate (802-07058)EACH4$400.00$400.00$400.00$460.00$300.00
0051Sign, sheet, relocate (802-07060)EACH1$375.00$375.00$375.00$413.00$400.00
0052Line, multi-component, solid, white, 6 in. (808-10049)LFT1,160$1.75$1.75$1.00$2.00$1.00
0053Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,160$1.75$1.75$1.00$2.00$1.00
INDOT contract R-44384-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy