INDOT contract B-45063-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on November 5, 2026, Grant, Fort Wayne. 6 bids received; low bid $1,890,766 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 86
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $1,890,766 | Low |
| 2 | Milestone Contractors LP | $1,989,782 | +5.0% |
| 3 | Miller Bros Construction Inc | $2,045,212 | +8.0% |
| 4 | Icc Group Inc | $2,066,000 | +9.0% |
| 5 | Duncan Robertson Inc | $2,207,345 | +17% |
| 6 | R L McCoy Inc | $2,550,200 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Milestone Contractors LP | 3. Miller Bros Construction Inc | 4. Icc Group Inc | 5. Duncan Robertson Inc | 6. R L McCoy Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,900 | $25,000 | $7,660.00 | $15,900 | $15,000 | $20,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $94,538 | $99,489 | $102,261 | $103,300 | $100,000 | $127,500 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $18,907 | $25,000 | $20,452 | $20,660 | $25,000 | $25,500 |
| 0011 | Paved side ditch, remove (202-02272) | LFT | 51 | $8.00 | $53.25 | $12.51 | $28.00 | $15.00 | $57.00 |
| 0012 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $115,750 | $114,922 | $107,205 | $277,806 | $225,000 | $600,000 |
| 0013 | Excavation, common (203-02000) | CYS | 585 | $63.00 | $150.00 | $141.25 | $70.00 | $30.00 | $92.00 |
| 0014 | Excavation, waterway (203-51223) | CYS | 2,025 | $43.00 | $35.00 | $44.85 | $70.00 | $30.00 | $48.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $4,061.25 | $9,300.00 | $1.00 | $30,000 | $8,000.00 |
| 0017 | Excavation, wet (206-51220) | CYS | 20 | $70.00 | $145.00 | $78.62 | $100.00 | $80.00 | $210.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $25,000 | $25,000 | $50,238 | $85,000 | $5,000.00 | $130,000 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 108 | $42.00 | $29.25 | $30.40 | $40.00 | $20.00 | $37.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 1,643 | $46.00 | $46.75 | $44.10 | $65.00 | $35.00 | $45.00 |
| 0021 | Aggregate for end bent backfill (211-06467) | CYS | 81 | $118.00 | $151.00 | $304.52 | $100.00 | $110.00 | $130.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 10 | $170.00 | $211.75 | $145.13 | $200.00 | $110.00 | $118.00 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,851 | $3.20 | $5.50 | $8.48 | $5.00 | $3.50 | $5.00 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 18 | $120.00 | $138.00 | $290.58 | $65.00 | $85.00 | $180.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 51 | $145.00 | $258.50 | $220.55 | $126.00 | $125.00 | $190.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 463 | $42.00 | $84.50 | $65.88 | $46.00 | $50.00 | $64.00 |
| 0027 | Widening with HMA, type C (304-07494) | TON | 285 | $220.00 | $160.25 | $116.00 | $155.00 | $128.00 | $150.00 |
| 0028 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 974 | $7.00 | $9.50 | $3.45 | $6.00 | $6.00 | $6.00 |
| 0029 | Milling, asphalt, 4 in. (306-08038) | SYS | 521 | $14.00 | $20.50 | $10.93 | $13.00 | $9.50 | $14.00 |
| 0030 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 240 | $158.23 | $120.00 | $120.00 | $120.00 | $132.00 | $120.00 |
| 0031 | QC/QA-HMA, 4, 58H, intermediate, 19.0 MM (401-000042) | TON | 195 | $140.50 | $115.00 | $115.00 | $115.00 | $126.00 | $115.00 |
| 0032 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 391 | $112.28 | $115.00 | $115.00 | $115.00 | $126.00 | $115.00 |
| 0033 | Joint adhesive (401-11526) | LFT | 3,558 | $0.27 | $0.67 | $0.67 | $0.67 | $0.75 | $0.67 |
| 0034 | Asphalt for tack coat (406-05520) | TON | 3 | $1.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,100.00 | $1,000.00 |
| 0035 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $3,195.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,300.00 | $3,000.00 |
| 0036 | Guardrail terminal system, W-beam, curved, type 1 (601-01700) | EACH | 1 | $2,550.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,970.00 | $2,700.00 |
| 0037 | Guardrail, remove (601-02241) | LFT | 488 | $10.00 | $3.00 | $3.00 | $3.00 | $6.00 | $3.00 |
| 0038 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 150 | $25.00 | $27.00 | $27.00 | $27.00 | $30.00 | $27.00 |
| 0039 | Guardrail transition, MGS with curb (601-12291) | EACH | 1 | $3,350.00 | $3,100.00 | $3,100.00 | $3,100.00 | $3,410.00 | $3,100.00 |
| 0040 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $3,250.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,300.00 | $3,000.00 |
| 0041 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,775.00 | $2,900.00 | $2,900.00 | $2,900.00 | $3,190.00 | $2,900.00 |
| 0042 | Barrier delineator (602-06729) | EACH | 10 | $30.00 | $40.75 | $28.00 | $24.00 | $25.00 | $40.00 |
| 0043 | Curb, integral concrete, modified (605-06105) | LFT | 22 | $140.00 | $117.75 | $108.81 | $94.00 | $100.00 | $175.00 |
| 0044 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 207.40 | $182.00 | $170.00 | $232.87 | $175.00 | $250.00 | $240.00 |
| 0045 | HMA for approaches, type B (610-07487) | TON | 24 | $252.96 | $300.00 | $300.00 | $300.00 | $330.00 | $370.00 |
| 0046 | Mailbox assembly, single (611-06497) | EACH | 2 | $395.00 | $295.00 | $295.00 | $295.00 | $325.00 | $295.00 |
| 0047 | Right-of-way marker (615-06490) | EACH | 10 | $175.00 | $150.00 | $150.00 | $150.00 | $165.00 | $150.00 |
| 0048 | Monument, type B (615-06505) | EACH | 2 | $1,125.00 | $1,018.00 | $1,018.00 | $1,018.00 | $1,190.00 | $1,018.00 |
| 0049 | Riprap, class 1 (616-05688) | TON | 641 | $80.00 | $84.75 | $114.28 | $111.00 | $85.00 | $120.00 |
| 0050 | Riprap, revetment (616-06405) | TON | 290 | $50.00 | $118.75 | $95.60 | $78.00 | $65.00 | $85.00 |
| 0051 | Geotextile for riprap, type 2B (616-12249) | SYS | 1,184 | $3.25 | $6.25 | $5.76 | $5.00 | $4.00 | $5.00 |
| 0052 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $425.00 | $425.00 | $400.00 | $425.00 | $550.00 | $425.00 |
| 0053 | Erosion control blanket (621-02770) | SYS | 2,016 | $2.25 | $2.25 | $1.60 | $2.25 | $1.65 | $2.25 |
| 0054 | Mulched seeding, type R (621-06559) | SYS | 2,016 | $0.94 | $0.94 | $1.30 | $0.94 | $1.90 | $0.94 |
| 0055 | Water (621-06567) | KGAL | 20 | $10.00 | $10.00 | $10.00 | $10.00 | $1.10 | $10.00 |
| 0056 | Sodding (621-06574) | SYS | 104 | $20.15 | $20.15 | $12.00 | $20.15 | $22.00 | $20.15 |
| 0057 | Field office, type D (628-12683) | MOS | 12 | $3,800.00 | $4,434.25 | $5,410.89 | $4,000.00 | $2,500.00 | $3,600.00 |
| 0058 | Test pile, indicator, production (701-09558) | LFT | 92 | $90.00 | $108.00 | $85.25 | $90.00 | $85.00 | $125.00 |
| 0059 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $5,000.00 | $1,400.00 | $1,527.57 | $1,000.00 | $2,000.00 | $2,600.00 |
| 0060 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 12 | $150.00 | $350.00 | $208.60 | $165.00 | $350.00 | $300.00 |
| 0061 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 360 | $145.00 | $108.00 | $94.32 | $100.00 | $100.00 | $95.00 |
| 0062 | Reinforcing bars, epoxy coated (703-06029) | LBS | 79,383 | $1.50 | $2.00 | $1.68 | $1.75 | $2.00 | $1.55 |
| 0063 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 40 | $40.00 | $55.00 | $66.03 | $40.00 | $65.00 | $61.00 |
| 0064 | Concrete, C, superstructure (704-51002) | CYS | 252.70 | $1,000.00 | $1,100.00 | $1,018.90 | $860.00 | $1,250.00 | $925.00 |
| 0065 | Railing, concrete type FC (706-11600) | CYS | 19.60 | $770.00 | $1,565.00 | $770.00 | $770.00 | $1,500.00 | $770.00 |
| 0066 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,000.00 | $2,600.00 | $2,000.00 | $2,000.00 | $2,250.00 | $2,000.00 |
| 0067 | Structural member, concrete, bulb-T beam, 48 in. X 49 in. (707-09634) | LFT | 466 | $850.00 | $722.25 | $934.23 | $650.00 | $1,225.00 | $850.00 |
| 0068 | Surface seal (709-51821) | LS | 1 | $1.00 | $1,650.00 | $1.00 | $1,800.00 | $2,500.00 | $500.00 |
| 0069 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 56 | $80.00 | $82.00 | $217.15 | $100.00 | $75.00 | $110.00 |
| 0070 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 140 | $12.00 | $22.25 | $15.17 | $35.00 | $15.00 | $30.00 |
| 0071 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $525.00 | $858.00 | $1,136.16 | $1,500.00 | $750.00 | $1,500.00 |
| 0072 | Geotextile for underdrains, type 2B (718-12308) | SYS | 175 | $6.50 | $10.00 | $14.06 | $7.00 | $4.00 | $9.00 |
| 0073 | Longitudinal grooving (722-12732) | SYS | 663 | $7.00 | $8.50 | $4.90 | $9.00 | $8.00 | $8.00 |
| 0074 | Construction sign, type C (801-03290) | EACH | 2 | $220.00 | $220.00 | $234.00 | $234.00 | $257.00 | $234.00 |
| 0075 | Road closure sign assembly (801-04308) | EACH | 4 | $325.00 | $325.00 | $258.00 | $258.00 | $284.00 | $258.00 |
| 0076 | Detour route marker assembly (801-06625) | EACH | 24 | $135.00 | $135.00 | $143.00 | $143.00 | $157.00 | $143.00 |
| 0077 | Construction sign, type A (801-06640) | EACH | 12 | $195.00 | $195.00 | $174.00 | $174.00 | $191.00 | $174.00 |
| 0078 | Maintaining traffic (801-06775) | LS | 1 | $8,900.00 | $10,000 | $4,078.00 | $1,500.00 | $20,000 | $5,000.00 |
| 0079 | Barricade, type III-A (801-07118) | LFT | 72 | $17.00 | $17.00 | $15.40 | $15.40 | $17.00 | $15.40 |
| 0080 | Barricade, type III-B (801-07119) | LFT | 72 | $17.00 | $17.00 | $15.40 | $15.40 | $17.00 | $15.40 |
| 0081 | Reference post (802-04893) | EACH | 2 | $275.00 | $463.00 | $463.00 | $463.00 | $510.00 | $463.00 |
| 0082 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 32 | $24.00 | $38.00 | $38.00 | $38.00 | $42.00 | $38.00 |
| 0083 | Sign, sheet assembly, relocate (802-07058) | EACH | 1 | $100.00 | $106.00 | $106.00 | $106.00 | $116.00 | $106.00 |
| 0084 | Sign, sheet, relocate (802-07060) | EACH | 3 | $40.00 | $106.00 | $106.00 | $106.00 | $116.00 | $106.00 |
| 0085 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,850 | $0.85 | $0.85 | $0.64 | $0.64 | $0.70 | $0.64 |
| 0086 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,850 | $0.85 | $0.85 | $0.64 | $0.64 | $0.70 | $0.64 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.