INDOT contract B-43742-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on December 10, 2025, Allen, Fort Wayne. 6 bids received; low bid $7,190,001 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 178
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $7,190,001 | Low |
| 2 | Milestone Contractors LP | $7,446,861 | +4.0% |
| 3 | Miller Bros Construction Inc | $7,738,222 | +8.0% |
| 4 | R L McCoy Inc | $7,836,771 | +9.0% |
| 5 | Beaty Construction Inc | $7,938,045 | +10% |
| 6 | Rieth-Riley Construction Co., Inc. | $11,662,722 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Milestone Contractors LP | 3. Miller Bros Construction Inc | 4. R L McCoy Inc | 5. Beaty Construction Inc | 6. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $100,001 | $50,000 | $21,340 | $45,000 | $65,000 | $99,785 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $400,000 | $372,343 | $386,911 | $391,830 | $396,900 | $582,000 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $35,000 | $37,234 | $38,691 | $39,180 | $39,690 | $55,000 |
| 0014 | Conduit, remove (202-01845) | LFT | 155 | $150.00 | $33.00 | $150.00 | $150.00 | $165.00 | $33.00 |
| 0015 | Pavement removal (202-02240) | SYS | 7,142 | $20.00 | $38.00 | $27.29 | $35.00 | $18.50 | $42.71 |
| 0016 | Center curb, concrete, remove (202-02273) | SYS | 117 | $35.00 | $235.00 | $10.75 | $100.00 | $225.00 | $38.65 |
| 0017 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $250,000 | $115,697 | $160,456 | $300,000 | $80,000 | $450,000 |
| 0018 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $150,000 | $74,000 | $94,882 | $225,000 | $80,000 | $200,000 |
| 0019 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $150,000 | $74,000 | $108,764 | $250,000 | $80,000 | $200,000 |
| 0020 | Slopewall, remove (202-51368) | SYS | 38 | $40.00 | $330.00 | $66.55 | $300.00 | $275.00 | $561.92 |
| 0021 | Sign, remove (202-74035) | EACH | 1 | $100.00 | $85.00 | $100.00 | $350.00 | $100.00 | $85.00 |
| 0022 | Fence, chain link, remove (202-91840) | LFT | 333 | $22.50 | $25.00 | $7.00 | $15.00 | $20.00 | $16.86 |
| 0023 | Excavation, common (203-02000) | CYS | 900 | $75.00 | $77.00 | $201.54 | $120.00 | $45.00 | $317.66 |
| 0024 | Linear grading (203-08607) | LFT | 612 | $2.00 | $8.00 | $5.17 | $12.00 | $6.50 | $43.11 |
| 0025 | Excavation, waterway (203-51223) | CYS | 440 | $75.00 | $89.00 | $59.92 | $96.00 | $63.75 | $245.64 |
| 0026 | Stormwater management budget (205-12108) | DOL | 75,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0027 | Stormwater management implementation (205-12616) | LS | 1 | $50,000 | $11,000 | $32,000 | $15,000 | $40,000 | $40,000 |
| 0028 | SWQCP preparation (205-12618) | LS | 1 | $12,000 | $3,600.00 | $3,800.00 | $3,900.00 | $4,000.00 | $5,000.00 |
| 0029 | Excavation, wet (206-51220) | CYS | 155 | $100.00 | $193.00 | $95.24 | $70.00 | $200.00 | $424.99 |
| 0030 | Excavation, foundation, unclassified (206-51230) | CYS | 65 | $75.00 | $131.00 | $518.13 | $200.00 | $125.00 | $317.66 |
| 0031 | Cofferdam (206-51235) | LS | 1 | $25,000 | $70,000 | $77,963 | $130,000 | $50,000 | $1.00 |
| 0032 | Subgrade treatment, type IC (207-09935) | SYS | 8,538 | $40.00 | $51.00 | $31.10 | $43.00 | $34.45 | $68.97 |
| 0033 | Aggregate for end bent backfill (211-06467) | CYS | 122 | $100.00 | $180.00 | $447.10 | $150.00 | $160.00 | $391.02 |
| 0034 | Flowable backfill, non- removable (213-09269) | CYS | 10 | $750.00 | $970.00 | $558.51 | $750.00 | $570.00 | $704.44 |
| 0035 | Geotextile for pavement, type 2B (214-12239) | SYS | 9,199 | $5.00 | $3.00 | $3.05 | $4.50 | $3.75 | $6.73 |
| 0036 | Compacted aggregate, no. 53 (301-12234) | CYS | 95 | $90.00 | $161.00 | $97.94 | $105.00 | $125.00 | $279.98 |
| 0037 | Subbase for PCCP (302-06464) | CYS | 929 | $90.00 | $120.00 | $107.65 | $130.00 | $100.00 | $385.55 |
| 0038 | Compacted aggregate, no. 53 (303-01180) | TON | 974 | $45.00 | $51.00 | $50.89 | $50.00 | $48.00 | $62.29 |
| 0039 | Milling, transition (306-08043) | SYS | 2,920 | $10.00 | $9.00 | $1.97 | $6.50 | $5.50 | $25.23 |
| 0040 | Lean concrete base, 9 in. (309-12695) | SYS | 393 | $75.00 | $100.00 | $158.23 | $115.00 | $105.00 | $139.06 |
| 0041 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 197 | $211.00 | $211.00 | $155.00 | $155.00 | $155.00 | $155.00 |
| 0042 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 124 | $286.00 | $286.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 0043 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 79 | $251.00 | $251.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 0044 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 54 | $325.00 | $325.00 | $155.00 | $155.00 | $155.00 | $155.00 |
| 0045 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 343 | $110.00 | $110.00 | $135.00 | $135.00 | $135.00 | $135.00 |
| 0046 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 221 | $120.00 | $120.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 0047 | Joint adhesive (401-11526) | LFT | 1,142 | $2.00 | $2.00 | $0.74 | $0.74 | $0.74 | $0.74 |
| 0048 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 960 | $0.01 | $0.01 | $27.00 | $27.00 | $27.00 | $27.00 |
| 0049 | Asphalt for tack coat (406-05521) | SYS | 5,634 | $0.25 | $0.25 | $0.49 | $0.49 | $0.49 | $0.49 |
| 0050 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 2 | $1.00 | $3,500.00 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 |
| 0051 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $1.00 | $2,000.00 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 |
| 0052 | QC/QA-PCCP, 14 in. (501-06325) | SYS | 1,644 | $142.00 | $135.00 | $170.00 | $200.00 | $150.00 | $232.20 |
| 0053 | PCCP, 14 in. (502-06331) | SYS | 3,320 | $139.00 | $150.00 | $142.00 | $135.00 | $107.50 | $131.50 |
| 0054 | Retrofitted tie bars (503-03489) | EACH | 672 | $96.00 | $40.00 | $73.00 | $5.50 | $32.25 | $97.39 |
| 0055 | D-1 contraction joint (503-05240) | LFT | 3,012 | $12.00 | $36.00 | $39.42 | $9.00 | $19.75 | $32.18 |
| 0056 | Terminal joint, type HMA (503-12477) | LFT | 175 | $200.00 | $340.00 | $535.41 | $375.00 | $385.00 | $628.81 |
| 0057 | Terminal joint, type PCCP (503-12478) | LFT | 184 | $200.00 | $340.00 | $360.68 | $400.00 | $350.00 | $529.16 |
| 0058 | Expansion joint with load transfer (503-12479) | LFT | 186 | $30.00 | $34.00 | $100.08 | $18.00 | $51.50 | $102.97 |
| 0059 | Jointed reinforced concrete pavement, 14 in. (503-12505) | SYS | 822 | $204.00 | $178.00 | $206.00 | $200.00 | $162.50 | $310.02 |
| 0060 | Guardrail terminal system, W-beam, curved, type 4 (601-01740) | EACH | 2 | $3,200.00 | $2,585.00 | $3,186.00 | $2,585.00 | $2,585.00 | $2,585.00 |
| 0061 | Guardrail, remove (601-02241) | LFT | 1,564 | $5.00 | $8.25 | $4.00 | $8.25 | $8.25 | $8.25 |
| 0062 | Guardrail, reset (601-06035) | LFT | 150 | $35.00 | $14.00 | $22.00 | $14.00 | $14.00 | $14.00 |
| 0063 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 163 | $25.00 | $22.00 | $30.00 | $22.00 | $22.00 | $22.00 |
| 0064 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $950.00 | $880.00 | $1,254.00 | $880.00 | $880.00 | $880.00 |
| 0065 | Guardrail transition, MGS with curb (601-12291) | EACH | 2 | $3,500.00 | $3,350.00 | $3,308.00 | $3,350.00 | $3,350.00 | $3,350.00 |
| 0066 | Guardrail transition, MGS without curb (601-12292) | EACH | 6 | $3,400.00 | $3,275.00 | $3,308.00 | $3,275.00 | $3,275.00 | $3,275.00 |
| 0067 | Guardrail end treatment, type OS (601-94689) | EACH | 6 | $3,050.00 | $2,350.00 | $3,308.00 | $2,350.00 | $2,350.00 | $2,350.00 |
| 0068 | Concrete median barrier, modified (602-91266) | LFT | 350 | $120.00 | $150.00 | $237.00 | $237.00 | $225.00 | $266.39 |
| 0069 | Fence, chain link, 48 in. (603-06045) | LFT | 333 | $62.50 | $44.00 | $31.00 | $44.00 | $44.00 | $44.00 |
| 0070 | Fence, farm field, reset (603-06060) | LFT | 80 | $93.50 | $33.00 | $27.00 | $33.00 | $33.00 | $33.00 |
| 0071 | Curb and gutter, concrete , modified (605-06140) | LFT | 34 | $100.00 | $153.00 | $163.00 | $110.00 | $130.00 | $256.84 |
| 0072 | Curb and gutter, concrete, type B (605-06145) | LFT | 52 | $60.00 | $108.00 | $144.00 | $130.00 | $165.00 | $171.83 |
| 0073 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 801 | $160.00 | $190.00 | $225.45 | $220.00 | $235.00 | $213.17 |
| 0074 | Reinforced concrete bridge approach, 14 in. (609-06262) | SYS | 742 | $160.00 | $215.00 | $244.99 | $236.00 | $275.00 | $250.54 |
| 0075 | Grout for riprap (616-02281) | CYS | 10 | $400.00 | $785.00 | $462.90 | $500.00 | $400.00 | $480.59 |
| 0076 | Riprap, revetment (616-06405) | TON | 669 | $75.00 | $84.00 | $66.74 | $100.00 | $77.00 | $269.66 |
| 0077 | Geotextile for riprap, type 1A (616-12246) | SYS | 639 | $5.00 | $4.50 | $4.47 | $4.00 | $3.75 | $5.93 |
| 0078 | Geotextile for riprap, type 2B (616-12249) | SYS | 362 | $5.00 | $5.50 | $6.23 | $5.00 | $5.50 | $14.20 |
| 0079 | Slopewall, concrete, 4 in. (616-51367) | SYS | 38 | $100.00 | $320.00 | $157.33 | $240.00 | $92.00 | $350.82 |
| 0080 | Inspection hole (616-93772) | EACH | 8 | $250.00 | $500.00 | $799.27 | $600.00 | $445.00 | $252.04 |
| 0081 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $28,000 | $28,000 | $28,000 | $16,000 | $16,000 | $18,000 |
| 0082 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $250,000 | $199,000 | $199,000 | $250,000 | $250,000 | $250,000 |
| 0083 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $10,000 | $10,000 | $10,000 | $6,000.00 | $6,000.00 | $4,000.00 |
| 0084 | Disposal of cleaning waste, hazardous, bridge no. 4 (619-12459) | LS | 1 | $200.00 | $200.00 | $200.00 | $500.00 | $500.00 | $1,000.00 |
| 0085 | Disposal of cleaning waste, hazardous, bridge no. 5 (619-12459) | LS | 1 | $200.00 | $200.00 | $200.00 | $500.00 | $500.00 | $1,000.00 |
| 0086 | Clean and coat steel piling, bridge no. 4 (619-12507) | LS | 1 | $50,000 | $21,500 | $21,500 | $22,000 | $22,000 | $44,000 |
| 0087 | Clean and coat steel piling, bridge no. 5 (619-12507) | LS | 1 | $50,000 | $21,500 | $21,500 | $22,000 | $22,000 | $44,000 |
| 0088 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $100,000 | $80,000 | $80,000 | $40,000 | $40,000 | $78,000 |
| 0089 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $4,000.00 | $4,000.00 | $6,000.00 |
| 0090 | Mobilization and demobilization for seeding (621-01004) | EACH | 6 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 0091 | Erosion control blanket (621-02770) | SYS | 2,346 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 0092 | Mulched seeding, type R (621-06559) | SYS | 5,933 | $0.85 | $0.85 | $0.85 | $0.85 | $0.85 | $0.85 |
| 0093 | Mulching material (621-06565) | TON | 2 | $510.00 | $510.00 | $510.00 | $510.00 | $510.00 | $510.00 |
| 0094 | Sodding (621-06574) | SYS | 171 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0095 | Seed mixture, floodplain (621-12612) | LBS | 29 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 0096 | Plant, deciduous shrub, 18 in. or under (622-05638) | EACH | 152 | $56.00 | $56.00 | $56.00 | $56.00 | $56.00 | $56.00 |
| 0097 | Plant, deciduous tree, single stem, 1.25 in. to 2 in. (622-05649) | EACH | 160 | $429.00 | $429.00 | $429.00 | $429.00 | $429.00 | $429.00 |
| 0098 | Sign, 'DO not mow or spray' (622-52436) | EACH | 18 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0099 | Computer system equipment (628-11976) | EACH | 2 | $500.00 | $1,600.00 | $725.30 | $850.00 | $2,500.00 | $500.00 |
| 0100 | Field office, type E (628-12684) | MOS | 24 | $4,000.00 | $5,900.00 | $8,703.57 | $4,400.00 | $5,800.00 | $6,000.00 |
| 0101 | Topsoil processing and distribution (629-000149) | SYS | 4,991 | $2.00 | $25.00 | $5.83 | $8.50 | $8.25 | $29.54 |
| 0102 | Topsoil amendment budget (629-000150) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0103 | Temporary shoring (702-04325) | LS | 1 | $5,000.00 | $5,500.00 | $19,239 | $13,000 | $8,005.41 | $50,000 |
| 0104 | Concrete, A, substructure (702-51005) | CYS | 12.20 | $3,000.00 | $2,200.00 | $3,709.98 | $900.00 | $2,900.00 | $3,360.98 |
| 0105 | Field drilled hole in concrete (702-51863) | EACH | 698 | $10.00 | $10.50 | $33.20 | $26.00 | $25.50 | $29.20 |
| 0106 | Reinforcing bars, epoxy coated (703-06029) | LBS | 132,227 | $1.75 | $2.10 | $1.81 | $1.50 | $1.60 | $1.99 |
| 0107 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 586 | $30.00 | $40.00 | $59.20 | $50.00 | $42.25 | $53.42 |
| 0108 | Concrete, C, superstructure (704-51002) | CYS | 190.80 | $750.00 | $1,010.00 | $1,945.52 | $1,900.00 | $1,800.00 | $2,059.20 |
| 0109 | Railing, concrete type FC , modified (706-11600) | CYS | 11 | $1,500.00 | $3,000.00 | $2,190.00 | $2,190.00 | $3,095.00 | $2,809.09 |
| 0110 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 12 | $2,500.00 | $3,000.00 | $4,380.00 | $4,380.00 | $4,200.00 | $3,998.58 |
| 0111 | Welded steel wire reinforcement (708-51814) | SFT | 432 | $12.00 | $12.00 | $12.53 | $12.00 | $12.00 | $12.00 |
| 0113 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $10,000 | $1,500.00 | $3,647.26 | $5,000.00 | $4,980.00 | $5,500.00 |
| 0114 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $10,000 | $1,500.00 | $2,575.59 | $4,000.00 | $4,451.00 | $4,000.00 |
| 0115 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $10,000 | $1,500.00 | $3,647.26 | $5,000.00 | $5,236.00 | $5,600.00 |
| 0116 | Surface seal , bridge no. 4 (709-51821) | LS | 1 | $10,000 | $1,500.00 | $2,575.59 | $2,000.00 | $3,910.00 | $2,500.00 |
| 0117 | Surface seal , bridge no. 5 (709-51821) | LS | 1 | $10,000 | $1,500.00 | $2,575.59 | $2,000.00 | $3,910.00 | $2,500.00 |
| 0118 | Patching concrete structures (710-09158) | SFT | 560 | $173.00 | $173.00 | $121.68 | $173.00 | $173.00 | $205.57 |
| 0119 | Drilled hole (711-51864) | EACH | 96 | $91.00 | $55.00 | $100.00 | $48.00 | $55.00 | $67.05 |
| 0120 | Jacking and supporting girders , bridge no. 1 (711-51878) | LS | 1 | $30,900 | $25,000 | $22,506 | $20,000 | $50,000 | $217,000 |
| 0121 | Stud shear connectors (711-96800) | EACH | 256 | $10.00 | $40.00 | $24.20 | $4.00 | $24.00 | $25.68 |
| 0122 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 240 | $15.00 | $19.00 | $12.93 | $30.00 | $12.50 | $39.63 |
| 0123 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $1,200.00 | $350.00 | $1,505.93 | $800.00 | $675.00 | $1,680.14 |
| 0124 | Bridge deck overlay, rigid (722-000134) | SYS | 3,827 | $150.00 | $96.00 | $111.41 | $88.00 | $138.00 | $147.57 |
| 0125 | Hydrodemolition (722-01066) | SYS | 3,702 | $80.00 | $80.00 | $58.28 | $75.00 | $58.00 | $89.29 |
| 0126 | Bridge deck overlay budget (722-12380) | DOL | 79,996 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0127 | Bridge deck, remove concrete surface (722-12464) | SYS | 3,702 | $20.00 | $12.00 | $22.57 | $6.00 | $7.00 | $22.69 |
| 0128 | Longitudinal grooving (722-12732) | SYS | 5,347 | $10.00 | $1.00 | $3.50 | $7.50 | $6.00 | $8.04 |
| 0129 | Bridge deck patching, full depth (722-51401) | SFT | 640 | $20.00 | $65.00 | $112.03 | $15.00 | $225.00 | $15.24 |
| 0130 | Overlay dam (722-51874) | SFT | 186 | $60.00 | $65.00 | $62.29 | $65.00 | $85.00 | $92.40 |
| 0131 | Bridge expansion joint, type PCF (724-12773) | LFT | 6 | $200.00 | $170.00 | $86.06 | $200.00 | $65.00 | $352.66 |
| 0132 | Bearing assembly, elastomeric (726-92406) | EACH | 24 | $3,000.00 | $2,500.00 | $2,412.90 | $2,100.00 | $2,025.00 | $2,700.10 |
| 0133 | Smart arrow board (801-000138) | DAY | 120 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 0134 | Connected work zone location markers (801-000209) | EACH | 2 | $11,345 | $11,345 | $11,345 | $11,345 | $11,345 | $11,345 |
| 0135 | Construction sign, type C (801-03290) | EACH | 4 | $236.00 | $236.00 | $236.00 | $236.00 | $236.00 | $236.00 |
| 0136 | Road closure sign assembly (801-04308) | EACH | 6 | $251.00 | $251.00 | $251.00 | $251.00 | $251.00 | $251.00 |
| 0137 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 58,492 | $2.05 | $2.05 | $2.05 | $2.05 | $2.05 | $2.05 |
| 0138 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 282 | $10.59 | $10.59 | $10.59 | $10.59 | $10.59 | $10.59 |
| 0139 | Detour route marker assembly (801-06625) | EACH | 37 | $158.00 | $158.00 | $158.00 | $158.00 | $158.00 | $158.00 |
| 0140 | Construction sign, type A (801-06640) | EACH | 90 | $217.00 | $217.00 | $217.00 | $217.00 | $217.00 | $217.00 |
| 0141 | Construction sign, type B (801-06645) | EACH | 13 | $109.00 | $109.00 | $109.00 | $109.00 | $109.00 | $109.00 |
| 0142 | Flashing arrow sign (801-06710) | DAY | 2 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0143 | Maintaining traffic (801-06775) | LS | 1 | $179,810 | $168,576 | $103,952 | $45,000 | $552,612 | $1,400,000 |
| 0144 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 8 | $3,000.00 | $5,787.50 | $7,129.00 | $4,800.00 | $4,800.00 | $9,392.00 |
| 0145 | Barricade, type III-A (801-07118) | LFT | 417 | $15.61 | $15.61 | $15.61 | $15.61 | $15.61 | $15.61 |
| 0146 | Barricade, type III-B (801-07119) | LFT | 56 | $15.61 | $15.61 | $15.61 | $15.61 | $15.61 | $15.61 |
| 0147 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,140 | $10.00 | $30.00 | $38.00 | $28.00 | $50.00 | $1.00 |
| 0148 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 5,330 | $10.00 | $35.00 | $38.00 | $55.00 | $82.25 | $1.00 |
| 0149 | Truck mounted attenuator (801-12042) | DAY | 2 | $5,000.00 | $243.25 | $978.24 | $1,000.00 | $4,000.00 | $1,700.00 |
| 0150 | Fixed temporary signal (801-12082) | LS | 1 | $80,000 | $155,477 | $80,000 | $80,000 | $80,000 | $150,000 |
| 0151 | Law enforcement officer (801-12324) | HRS | 720 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0152 | Digital speed limit sign assembly (801-12594) | EACH | 6 | $1,042.00 | $1,042.00 | $1,042.00 | $1,042.00 | $1,042.00 | $1,042.00 |
| 0153 | Sign, sheet, remove (802-04089) | EACH | 2 | $100.00 | $85.00 | $100.00 | $100.00 | $100.00 | $85.00 |
| 0154 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 225 | $100.00 | $35.00 | $100.00 | $100.00 | $100.00 | $35.00 |
| 0155 | Handhole, lighting (807-02191) | EACH | 3 | $3,500.00 | $2,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $2,500.00 |
| 0156 | Wire, no. 4 copper, in plastic duct, 3 1/C (807-05695) | LFT | 250 | $25.00 | $35.00 | $25.00 | $25.00 | $25.00 | $35.00 |
| 0157 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 20 | $100.00 | $50.00 | $100.00 | $100.00 | $100.00 | $50.00 |
| 0158 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 165 | $25.00 | $37.00 | $25.00 | $25.00 | $25.00 | $37.00 |
| 0159 | Connector kit, unfused (807-86910) | EACH | 1 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0160 | Connector kit, fused (807-86915) | EACH | 1 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0161 | Insulation link, waterproofed (807-86935) | EACH | 4 | $60.00 | $25.00 | $60.00 | $60.00 | $60.00 | $25.00 |
| 0162 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 60 | $25.00 | $35.00 | $25.00 | $25.00 | $25.00 | $35.00 |
| 0163 | Line, remove (808-06716) | LFT | 14,720 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 |
| 0164 | Pavement message marking, paint, lane indication arrow (808-06723) | EACH | 2 | $177.00 | $177.00 | $177.00 | $177.00 | $177.00 | $177.00 |
| 0165 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0166 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 5,886 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 |
| 0167 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 6,454 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 |
| 0168 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 1,730 | $1.21 | $1.21 | $1.21 | $1.21 | $1.21 | $1.21 |
| 0169 | Transverse marking, multi-component, crosshatch line, white, 8 in. (808-10101) | LFT | 180 | $4.97 | $4.97 | $4.97 | $4.97 | $4.97 | $4.97 |
| 0170 | Grooving for pavement markings (808-12032) | LFT | 834 | $1.19 | $1.19 | $1.19 | $1.19 | $1.19 | $1.19 |
| 0171 | Line, multi-component, dotted, white, 6 in. (808-12353) | LFT | 505 | $1.21 | $1.21 | $1.21 | $1.21 | $1.21 | $1.21 |
| 0172 | Line, paint, broken, white, 6 in. (808-75002) | LFT | 230 | $0.45 | $0.45 | $0.45 | $0.45 | $0.45 | $0.45 |
| 0173 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 2,157 | $0.39 | $0.39 | $0.39 | $0.39 | $0.39 | $0.39 |
| 0174 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,815 | $0.39 | $0.39 | $0.39 | $0.39 | $0.39 | $0.39 |
| 0175 | Prismatic reflector (808-75994) | EACH | 98 | $10.31 | $10.31 | $10.31 | $10.31 | $10.31 | $10.31 |
| 0176 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 12 | $2.75 | $19.00 | $33.75 | $60.00 | $75.00 | $84.54 |
| 0177 | Barrier wall, concrete, remove (202-94954) | LFT | 350 | $20.00 | $42.00 | $51.48 | $50.00 | $37.00 | $71.27 |
| 0178 | Concrete, C, substructure (702-92857) | CYS | 29.40 | $500.00 | $1,300.00 | $1,588.65 | $950.00 | $1,600.00 | $3,059.16 |
| 0179 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $66,880 | $66,880 | $51,680 | $66,880 | $66,880 | $66,880 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.