INDOT contract B-44339-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on July 8, 2026, Noble, Fort Wayne. 6 bids received; low bid $1,187,695 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 68
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,187,695 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $1,407,877 | +19% |
| 3 | Miller Bros Construction Inc | $1,421,154 | +20% |
| 4 | E & B Paving LLC | $1,423,500 | +20% |
| 5 | R L McCoy Inc | $1,525,107 | +28% |
| 6 | Pioneer Associates Inc | $2,165,251 | +82% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Rieth-Riley Construction Co., Inc. | 3. Miller Bros Construction Inc | 4. E & B Paving LLC | 5. R L McCoy Inc | 6. Pioneer Associates Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,000 | $30,000 | $4,100.00 | $30,000 | $20,000 | $34,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $59,385 | $70,000 | $71,058 | $75,000 | $76,200 | $265,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $23,754 | $28,000 | $10,900 | $30,000 | $30,500 | $45,000 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $78,169 | $100,000 | $136,697 | $245,576 | $265,000 | $435,000 |
| 0012 | Excavation, common (203-02000) | CYS | 330 | $143.00 | $61.00 | $87.30 | $100.00 | $75.00 | $90.00 |
| 0013 | Borrow (203-02070) | CYS | 60 | $60.00 | $110.00 | $59.50 | $5.00 | $90.00 | $50.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 19,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $1,450.00 | $20,000 | $17,300 | $10,000 | $5,000.00 | $4,800.00 |
| 0016 | Excavation, X (206-51215) | CYS | 10 | $490.00 | $380.00 | $308.99 | $500.00 | $600.00 | $450.00 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 170 | $60.00 | $85.00 | $163.72 | $75.00 | $76.00 | $70.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $10,000 | $60,000 | $1.24 | $5,000.00 | $50,000 | $30,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 580 | $36.00 | $70.00 | $44.18 | $65.00 | $55.00 | $60.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 32 | $143.00 | $200.00 | $614.88 | $150.00 | $200.00 | $180.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 176 | $12.00 | $15.00 | $12.93 | $5.00 | $12.00 | $10.00 |
| 0022 | Compacted aggregate, no. 5 (301-12232) | CYS | 5 | $222.00 | $259.00 | $176.54 | $150.00 | $600.00 | $225.00 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 130 | $107.00 | $130.00 | $172.26 | $75.00 | $110.00 | $100.00 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 30 | $255.00 | $200.00 | $235.11 | $150.00 | $180.00 | $245.00 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 170 | $90.00 | $25.00 | $70.35 | $75.00 | $58.00 | $60.00 |
| 0026 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 45 | $245.00 | $200.00 | $245.00 | $459.12 | $245.00 | $245.00 |
| 0027 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 75 | $205.00 | $190.00 | $205.00 | $304.50 | $205.00 | $205.00 |
| 0028 | Joint adhesive (401-11526) | LFT | 960 | $0.24 | $0.50 | $0.24 | $0.70 | $0.24 | $0.24 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 525 | $0.50 | $1.00 | $0.50 | $0.25 | $0.50 | $0.50 |
| 0030 | Guardrail, remove (601-02241) | LFT | 200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0031 | Guardrail end treatment, type I (601-06037) | EACH | 4 | $1,425.00 | $1,425.00 | $1,425.00 | $1,425.00 | $1,425.00 | $2,080.00 |
| 0032 | Guardrail transition, type TGS-1 (601-06374) | EACH | 4 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 |
| 0033 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 207 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0034 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 120 | $175.00 | $225.00 | $209.83 | $230.00 | $300.00 | $300.00 |
| 0035 | Monument, type B (615-06505) | EACH | 2 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 0036 | Riprap, revetment (616-06405) | TON | 265 | $67.00 | $120.00 | $107.85 | $90.00 | $100.00 | $120.00 |
| 0037 | Geotextile for riprap, type 1A (616-12246) | SYS | 430 | $5.00 | $4.00 | $5.57 | $5.00 | $5.00 | $4.00 |
| 0038 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 |
| 0039 | Mulched seeding, type R (621-06559) | SYS | 1,500 | $2.45 | $2.45 | $2.45 | $2.45 | $2.45 | $3.00 |
| 0040 | Water (621-06567) | KGAL | 1 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0041 | Sodding (621-06574) | SYS | 135 | $28.55 | $28.55 | $28.55 | $28.55 | $28.55 | $29.00 |
| 0042 | Sign, 'DO not disturb' (622-98200) | EACH | 1 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 0043 | Field office, type A (628-09401) | MOS | 10 | $3,000.00 | $2,750.00 | $3,365.01 | $2,540.00 | $3,635.00 | $3,800.00 |
| 0044 | Computer system equipment (628-11976) | EACH | 1 | $800.00 | $560.00 | $854.50 | $450.00 | $850.00 | $500.00 |
| 0045 | Test pile, indicator, production (701-09558) | LFT | 70 | $114.00 | $107.00 | $124.57 | $80.00 | $165.00 | $245.00 |
| 0046 | Test pile, indicator, restrike (701-09560) | EACH | 1 | $2,500.00 | $5,000.00 | $1,954.85 | $2,500.00 | $6,000.00 | $4,400.00 |
| 0047 | Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663) | LFT | 630 | $112.00 | $88.00 | $126.60 | $75.00 | $108.00 | $175.00 |
| 0048 | Conical pile tip, 14 in. (701-09679) | EACH | 12 | $481.00 | $428.00 | $457.94 | $500.00 | $500.00 | $700.00 |
| 0049 | Concrete, C, substructure (702-92857) | CYS | 32.80 | $1,300.00 | $1,250.00 | $1,372.85 | $1,200.00 | $1,200.00 | $2,500.00 |
| 0050 | Threaded tie bar assembly (703-01540) | EACH | 30 | $51.00 | $70.00 | $57.70 | $20.00 | $70.00 | $70.00 |
| 0051 | Reinforcing bars, epoxy coated (703-06029) | LBS | 31,209 | $2.10 | $1.60 | $1.67 | $1.75 | $1.55 | $2.00 |
| 0052 | Concrete, C, superstructure (704-51002) | CYS | 130.30 | $1,300.00 | $1,300.00 | $1,329.20 | $1,100.00 | $1,425.00 | $2,050.00 |
| 0053 | Railing, steel type TS-1 (706-06344) | LFT | 213 | $77.00 | $95.00 | $77.00 | $77.00 | $77.00 | $95.00 |
| 0054 | Structural member, concrete, bulb-T beam, 42 in. X 49 in. (707-08158) | LFT | 438 | $667.00 | $957.00 | $1,024.79 | $900.00 | $810.00 | $900.00 |
| 0055 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 96 | $22.00 | $12.00 | $8.55 | $5.00 | $28.00 | $40.00 |
| 0056 | Geotextile for underdrains, type 2A (718-12307) | SYS | 80 | $11.00 | $12.50 | $13.49 | $5.00 | $12.00 | $15.00 |
| 0057 | Longitudinal grooving (722-12732) | SYS | 470 | $6.00 | $7.45 | $7.45 | $7.50 | $8.00 | $9.00 |
| 0058 | Construction sign, type C (801-03290) | EACH | 4 | $233.00 | $233.00 | $233.00 | $233.00 | $233.00 | $233.00 |
| 0059 | Construction sign, type D (801-03291) | EACH | 8 | $253.00 | $253.00 | $253.00 | $253.00 | $253.00 | $253.00 |
| 0060 | Road closure sign assembly (801-04308) | EACH | 6 | $251.00 | $251.00 | $251.00 | $251.00 | $251.00 | $251.00 |
| 0061 | Detour route marker assembly (801-06625) | EACH | 7 | $153.00 | $153.00 | $153.00 | $153.00 | $153.00 | $153.00 |
| 0062 | Construction sign, type A (801-06640) | EACH | 14 | $202.00 | $202.00 | $202.00 | $202.00 | $202.00 | $202.00 |
| 0063 | Construction sign, type B (801-06645) | EACH | 2 | $102.00 | $102.00 | $102.00 | $102.00 | $102.00 | $102.00 |
| 0064 | Maintaining traffic (801-06775) | LS | 1 | $5,000.00 | $1.00 | $8,218.22 | $10,000 | $1,000.00 | $23,500 |
| 0065 | Maintaining traffic , waterway (801-06775) | LS | 1 | $18,510 | $25,000 | $5,875.71 | $500.00 | $20,000 | $30,000 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 48 | $15.53 | $15.53 | $15.53 | $15.53 | $15.53 | $16.00 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 96 | $15.53 | $15.53 | $15.53 | $15.53 | $15.53 | $16.00 |
| 0068 | Temporary traffic barrier, type 2 (801-08401) | LFT | 20 | $135.00 | $100.00 | $59.53 | $40.00 | $225.00 | $120.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.