INDOT contract B-42780-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on August 6, 2025, Wabash, Fort Wayne. 5 bids received; low bid $3,686,941 by R L McCoy Inc.
- Owner
- Indiana DOT
- Letting
- 06 AUG 2025
- Pay items
- 113
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R L McCoy Inc | $3,686,941 | Low |
| 2 | Beaty Construction Inc | $3,949,059 | +7.0% |
| 3 | Superior Construction Co Inc | $4,054,985 | +10% |
| 4 | Milestone Contractors LP | $4,279,792 | +16% |
| 5 | Rieth-Riley Construction Co., Inc. | $5,912,245 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R L McCoy Inc | 2. Beaty Construction Inc | 3. Superior Construction Co Inc | 4. Milestone Contractors LP | 5. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $23,250 | $150,000 | $50,000 | $62,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $184,000 | $198,285 | $200,000 | $213,990 | $598,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $110,000 | $118,950 | $120,000 | $128,394 | $175,000 |
| 0011 | Paved side ditch, remove (202-02272) | LFT | 73 | $55.00 | $50.00 | $4.00 | $34.00 | $50.00 |
| 0012 | Curb, concrete, remove (202-02278) | LFT | 75 | $15.00 | $16.00 | $10.00 | $34.00 | $40.00 |
| 0013 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $370,000 | $487,417 | $755,986 | $534,933 | $850,000 |
| 0014 | Sidewalk concrete, remove (202-52710) | SYS | 46 | $40.00 | $25.00 | $20.00 | $65.00 | $45.00 |
| 0015 | Inlet, remove (202-91385) | EACH | 2 | $1,000.00 | $1,850.00 | $500.00 | $3,100.00 | $1,200.00 |
| 0016 | Pipe, remove (202-96133) | LFT | 74 | $50.00 | $65.00 | $20.00 | $205.00 | $50.00 |
| 0017 | Excavation, common (203-02000) | CYS | 795 | $85.00 | $50.00 | $75.00 | $110.00 | $150.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 13,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $25,000 | $20,000 | $3,400.00 | $35,000 |
| 0020 | Excavation, foundation, unclassified (206-51230) | CYS | 364 | $85.00 | $106.75 | $38.00 | $89.00 | $150.00 |
| 0021 | Cofferdam (206-51235) | LS | 1 | $180,000 | $185,000 | $125,000 | $150,000 | $475,000 |
| 0022 | Subgrade treatment, type III (207-08266) | SYS | 78 | $30.00 | $5.75 | $18.00 | $30.00 | $25.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 695 | $52.00 | $43.75 | $44.00 | $41.00 | $55.00 |
| 0024 | B borrow (211-02050) | CYS | 138 | $80.00 | $92.00 | $50.00 | $132.00 | $120.00 |
| 0025 | Aggregate for end bent backfill (211-06467) | CYS | 161 | $135.00 | $85.00 | $86.00 | $220.00 | $275.00 |
| 0026 | Structure backfill, type 1 (211-09264) | CYS | 11 | $95.00 | $55.00 | $146.00 | $156.00 | $400.00 |
| 0027 | Structure backfill, type 3 (211-09266) | CYS | 130 | $120.00 | $85.00 | $56.00 | $220.00 | $125.00 |
| 0028 | Geogrid, type IA (214-07202) | SYS | 127 | $6.00 | $5.00 | $15.00 | $7.00 | $10.00 |
| 0029 | Geotextile for pavement, type 2A (214-12238) | SYS | 311 | $6.00 | $4.00 | $10.00 | $5.00 | $5.00 |
| 0030 | Geotextile for pavement, type 2B (214-12239) | SYS | 427 | $6.00 | $6.50 | $7.60 | $6.00 | $5.00 |
| 0031 | Compacted aggregate, no. 5 (301-12232) | CYS | 70 | $95.00 | $88.00 | $56.00 | $145.00 | $105.00 |
| 0032 | Compacted aggregate, no. 53 (301-12234) | CYS | 70 | $95.00 | $118.00 | $200.00 | $150.00 | $110.00 |
| 0033 | Subbase for PCCP (302-06464) | CYS | 45 | $145.00 | $145.00 | $170.00 | $310.00 | $160.00 |
| 0034 | Compacted aggregate, no. 53 (303-01180) | TON | 86 | $70.00 | $74.25 | $43.00 | $90.00 | $85.00 |
| 0035 | Milling, transition (306-08043) | SYS | 115 | $50.00 | $48.00 | $17.00 | $40.00 | $50.00 |
| 0036 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 45 | $110.00 | $110.00 | $110.00 | $110.00 | $222.00 |
| 0037 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 60 | $90.00 | $90.00 | $90.00 | $90.00 | $200.00 |
| 0038 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 165 | $65.00 | $65.00 | $65.00 | $65.00 | $175.00 |
| 0039 | Joint adhesive, surface (401-10258) | LFT | 203 | $0.95 | $0.95 | $0.95 | $0.95 | $1.00 |
| 0040 | Joint adhesive, intermediate (401-10259) | LFT | 160 | $0.95 | $0.95 | $0.95 | $0.95 | $1.00 |
| 0041 | Asphalt for tack coat (406-05521) | SYS | 985 | $0.55 | $0.55 | $0.55 | $0.55 | $2.00 |
| 0042 | Terminal joint, type HMA , modified (503-12477) | LFT | 83 | $470.00 | $500.00 | $380.00 | $330.00 | $450.00 |
| 0043 | Guardrail, remove (601-02241) | LFT | 231 | $6.75 | $6.75 | $6.75 | $4.00 | $6.75 |
| 0044 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $2,850.00 | $2,850.00 | $2,850.00 | $3,600.00 | $2,850.00 |
| 0045 | Guardrail transition, MGS without curb , modified (601-12292) | EACH | 1 | $2,850.00 | $2,850.00 | $2,850.00 | $3,500.00 | $2,850.00 |
| 0046 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,100.00 | $3,100.00 | $3,100.00 | $3,050.00 | $3,100.00 |
| 0047 | Barrier delineator (602-06729) | EACH | 7 | $28.00 | $20.00 | $25.00 | $51.00 | $31.01 |
| 0048 | Fence, chain link, 48 in. (603-06045) | LFT | 88 | $67.00 | $67.00 | $67.00 | $100.50 | $67.00 |
| 0049 | Sidewalk, concrete (604-06070) | SYS | 65 | $115.00 | $115.00 | $100.00 | $150.00 | $125.00 |
| 0050 | Curb, concrete (605-06120) | LFT | 171 | $93.00 | $90.00 | $50.00 | $105.00 | $70.00 |
| 0051 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 212.30 | $250.00 | $200.00 | $175.00 | $195.00 | $225.00 |
| 0052 | HMA for approaches, type B (610-07487) | TON | 13 | $225.00 | $225.00 | $225.00 | $225.00 | $240.00 |
| 0053 | Right-of-way marker (615-06490) | EACH | 11 | $190.00 | $190.00 | $190.00 | $225.00 | $190.00 |
| 0054 | Monument, type B (615-06505) | EACH | 2 | $1,575.00 | $1,575.00 | $1,575.00 | $850.00 | $1,575.00 |
| 0055 | Riprap, revetment (616-06405) | TON | 620 | $80.00 | $96.50 | $76.00 | $75.00 | $100.00 |
| 0056 | Geotextile for riprap, type 1A (616-12246) | SYS | 762 | $4.00 | $5.00 | $3.00 | $4.00 | $4.00 |
| 0057 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 |
| 0058 | Mulched seeding, type U (621-06560) | SYS | 182 | $3.60 | $3.60 | $3.60 | $3.60 | $3.60 |
| 0059 | Mulching material (621-06565) | TON | 0.30 | $615.00 | $615.00 | $615.00 | $615.00 | $615.00 |
| 0060 | Sodding (621-06574) | SYS | 43 | $48.75 | $48.75 | $48.75 | $48.75 | $58.75 |
| 0061 | Seed mixture, floodplain (621-12612) | LBS | 20 | $199.00 | $199.00 | $199.00 | $199.00 | $199.00 |
| 0062 | Field office, type A (628-09401) | MOS | 12 | $2,650.00 | $2,500.00 | $2,000.00 | $3,800.00 | $3,100.00 |
| 0063 | Test pile, indicator, production (701-09558) | LFT | 155 | $85.00 | $54.50 | $150.00 | $109.00 | $80.00 |
| 0064 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $3,000.00 | $2,000.00 | $5,000.00 | $12,000 | $10,000 |
| 0065 | Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663) | LFT | 2,574 | $83.00 | $104.00 | $77.00 | $93.00 | $50.00 |
| 0066 | Vibration monitoring (701-12304) | LS | 1 | $30,000 | $35,000 | $24,000 | $85,000 | $75,000 |
| 0067 | Temporary shoring (702-04325) | LS | 1 | $200,000 | $150,000 | $150,000 | $115,000 | $125,000 |
| 0068 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 6 | $2,300.00 | $1,900.00 | $1,500.00 | $2,000.00 | $2,800.00 |
| 0069 | Concrete, A, substructure (702-51005) | CYS | 47.40 | $2,100.00 | $1,750.00 | $1,650.00 | $2,000.00 | $2,350.00 |
| 0070 | Concrete, B, footings (702-51015) | CYS | 43.20 | $800.00 | $800.00 | $650.00 | $800.00 | $900.00 |
| 0071 | Concrete, foundation seal (702-51046) | CYS | 26 | $575.00 | $450.00 | $300.00 | $770.00 | $200.00 |
| 0072 | Concrete, C, substructure (702-92857) | CYS | 84.90 | $1,050.00 | $1,300.00 | $900.00 | $1,600.00 | $1,500.00 |
| 0073 | Reinforcing bars (703-06028) | LBS | 16,044 | $1.45 | $1.45 | $1.25 | $2.50 | $1.90 |
| 0074 | Reinforcing bars, epoxy coated (703-06029) | LBS | 107,645 | $1.45 | $1.45 | $1.35 | $2.25 | $2.00 |
| 0075 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 34 | $52.00 | $44.00 | $51.00 | $52.00 | $50.00 |
| 0076 | Concrete, C, superstructure (704-51002) | CYS | 319 | $850.00 | $1,065.00 | $800.00 | $1,200.00 | $1,500.00 |
| 0077 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 1 | $9,000.00 | $5,585.00 | $6,500.00 | $3,500.00 | $9,000.00 |
| 0078 | Concrete bridge railing transition, type TPF-1 , modified (706-06351) | EACH | 1 | $12,000 | $10,000 | $8,500.00 | $9,000.00 | $12,000 |
| 0079 | Concrete bridge railing transition, type TPS-1 (706-06353) | EACH | 2 | $9,000.00 | $4,600.00 | $7,500.00 | $3,500.00 | $9,000.00 |
| 0080 | Railing, steel type PF-1 (706-11404) | LFT | 214 | $96.00 | $96.00 | $96.00 | $145.00 | $96.00 |
| 0081 | Railing, steel type PS-1 (706-11418) | LFT | 211 | $97.00 | $97.00 | $97.00 | $145.00 | $97.00 |
| 0082 | Railing, concrete type PF-1 (706-11602) | CYS | 12.30 | $1,974.00 | $2,465.00 | $1,600.00 | $1,100.00 | $1,974.00 |
| 0083 | Railing, concrete type PS-1 (706-11604) | CYS | 18.20 | $1,974.00 | $1,920.00 | $1,500.00 | $1,100.00 | $1,974.00 |
| 0084 | Structural member, concrete, bulb-T beam, 54 in. X 49 in. (707-09921) | LFT | 804 | $650.00 | $725.00 | $900.00 | $835.00 | $1,600.00 |
| 0085 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $500.00 | $3,025.00 | $0.01 | $3,000.00 | $3,950.00 |
| 0086 | Temporary causeway (713-04331) | LS | 1 | $320,000 | $225,000 | $250,000 | $225,000 | $1.00 |
| 0087 | Pipe, type 1, circular, diameter 12 in. (715-05118) | LFT | 83 | $130.00 | $108.00 | $72.00 | $64.00 | $110.00 |
| 0088 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 52 | $120.00 | $150.00 | $100.00 | $74.00 | $160.00 |
| 0089 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 143 | $30.00 | $24.50 | $13.00 | $22.00 | $10.00 |
| 0090 | Video inspection for pipe (715-09064) | LFT | 135 | $25.00 | $22.00 | $24.10 | $24.10 | $20.00 |
| 0091 | Pipe, roadway drain casting extension (715-10238) | EACH | 6 | $900.00 | $825.00 | $850.00 | $950.00 | $1,500.00 |
| 0092 | Pipe end section, diameter 12 in. (715-46000) | EACH | 1 | $450.00 | $1,600.00 | $650.00 | $980.00 | $1,200.00 |
| 0093 | Geotextile for underdrains, type 3 (718-12309) | SYS | 217 | $9.00 | $8.00 | $5.00 | $8.50 | $8.00 |
| 0094 | Inlet, type B15 (720-98174) | EACH | 1 | $4,000.00 | $3,825.00 | $4,100.00 | $2,900.00 | $8,500.00 |
| 0095 | Inlet, type C15 (720-98555) | EACH | 1 | $4,000.00 | $4,025.00 | $4,100.00 | $2,900.00 | $8,500.00 |
| 0096 | Longitudinal grooving (722-12732) | SYS | 752 | $6.00 | $8.25 | $7.39 | $2.50 | $15.00 |
| 0097 | Bearing assembly, elastomeric (726-92406) | EACH | 16 | $1,700.00 | $2,200.00 | $1,750.00 | $2,100.00 | $2,600.00 |
| 0098 | Aggregate for drainage fill (732-11770) | CYS | 19 | $45.00 | $123.00 | $163.00 | $45.00 | $180.00 |
| 0099 | Modular block wall erection (732-11811) | SFT | 489 | $43.50 | $76.00 | $35.00 | $43.50 | $50.00 |
| 0100 | Modular block wall with ground reinforcement (732-11812) | SFT | 489 | $47.00 | $15.00 | $20.00 | $47.00 | $60.00 |
| 0101 | Road closure sign assembly (801-04308) | EACH | 6 | $261.00 | $261.00 | $325.00 | $325.00 | $261.00 |
| 0102 | Detour route marker assembly (801-06625) | EACH | 26 | $156.00 | $156.00 | $129.00 | $129.00 | $156.00 |
| 0103 | Construction sign, type A (801-06640) | EACH | 8 | $215.00 | $215.00 | $155.00 | $155.00 | $215.00 |
| 0104 | Maintaining traffic (801-06775) | LS | 1 | $20,000 | $120,500 | $50,000 | $35,000 | $65,000 |
| 0105 | Barricade, type III-A (801-07118) | LFT | 72 | $15.71 | $15.71 | $16.75 | $16.75 | $15.71 |
| 0106 | Barricade, type III-B (801-07119) | LFT | 72 | $15.71 | $15.71 | $16.75 | $16.75 | $15.71 |
| 0107 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 8 | $29.00 | $29.00 | $29.00 | $26.50 | $29.00 |
| 0108 | Sign, sheet, and supports, remove (802-07059) | EACH | 1 | $99.00 | $99.00 | $99.00 | $125.00 | $99.00 |
| 0109 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 2 | $74.00 | $74.00 | $74.00 | $65.00 | $74.00 |
| 0110 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 939 | $0.53 | $0.53 | $0.75 | $0.75 | $0.53 |
| 0111 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 912 | $0.53 | $0.53 | $0.75 | $0.75 | $0.53 |
| 0112 | Line, paint, solid, blue, 4 in. , for accessible symbol (808-09314) | LFT | 14 | $4.11 | $4.11 | $7.00 | $7.00 | $4.11 |
| 0113 | Pavement message marking, paint, ADA accessible symbol (808-97222) | EACH | 1 | $436.00 | $436.00 | $355.00 | $355.00 | $436.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.