INDOT contract B-44289-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on October 7, 2026, Wabash, Fort Wayne. 3 bids received; low bid $2,291,091 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 71
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,291,091 | Low |
| 2 | Beaty Construction Inc | $2,448,838 | +7.0% |
| 3 | R L McCoy Inc | $2,723,750 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Beaty Construction Inc | 3. R L McCoy Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $30,125 | $30,000 | $20,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $114,555 | $122,440 | $136,100 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $68,733 | $24,485 | $81,700 |
| 0011 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $16,600 | $30,000 | $25,000 |
| 0012 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $168,500 | $209,235 | $580,000 |
| 0013 | Manhole, remove (202-93047) | EACH | 1 | $925.00 | $5,400.00 | $1,500.00 |
| 0014 | Excavation, common (203-02000) | CYS | 456 | $63.75 | $38.00 | $85.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 16,000 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $2,300.00 | $6,500.00 | $6,000.00 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 31 | $105.50 | $200.00 | $40.00 |
| 0018 | Subgrade treatment, type II (207-08264) | SYS | 68 | $34.50 | $50.00 | $50.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 1,044 | $52.25 | $50.00 | $47.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 20 | $165.50 | $275.00 | $120.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,044 | $6.00 | $5.00 | $7.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 110 | $57.75 | $100.00 | $115.00 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 32 | $291.75 | $150.00 | $200.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 44 | $141.75 | $105.00 | $125.00 |
| 0025 | Milling, transition (306-08043) | SYS | 218 | $35.50 | $32.50 | $26.00 |
| 0026 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 84 | $180.00 | $180.00 | $180.00 |
| 0027 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 110 | $140.00 | $140.00 | $140.00 |
| 0028 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 480 | $105.00 | $105.00 | $105.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 664 | $1.00 | $1.00 | $1.00 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,871 | $0.01 | $0.01 | $0.01 |
| 0031 | Terminal joint, type HMA (503-12477) | LFT | 52 | $424.00 | $650.00 | $525.00 |
| 0032 | Guardrail, remove (601-02241) | LFT | 197 | $6.00 | $6.00 | $8.00 |
| 0033 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,850.00 | $3,600.00 | $3,600.00 |
| 0034 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,200.00 | $3,250.00 | $3,250.00 |
| 0035 | Barrier delineator (602-06729) | EACH | 14 | $19.75 | $30.00 | $30.00 |
| 0036 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 126 | $159.00 | $185.00 | $265.00 |
| 0037 | HMA for approaches, type B (610-07487) | TON | 15 | $371.00 | $371.00 | $371.00 |
| 0038 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $310.00 | $950.00 | $950.00 |
| 0039 | Monument, type B (615-06505) | EACH | 2 | $1,150.00 | $1,950.00 | $1,950.00 |
| 0040 | Riprap, class 1 (616-05688) | TON | 12 | $190.00 | $225.00 | $250.00 |
| 0041 | Riprap, revetment (616-06405) | TON | 104 | $152.00 | $95.00 | $90.00 |
| 0042 | Slopewall , repair (616-06455) | SYS | 141 | $212.25 | $210.00 | $150.00 |
| 0043 | Geotextile for riprap, type 1A (616-12246) | SYS | 223 | $6.50 | $6.00 | $6.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $425.00 | $425.00 | $425.00 |
| 0045 | Sodding (621-06574) | SYS | 66 | $30.75 | $30.75 | $30.75 |
| 0046 | Seed mixture, floodplain (621-12612) | LBS | 70 | $145.00 | $145.00 | $145.00 |
| 0047 | Sign, 'DO not spray' (621-52448) | EACH | 8 | $125.00 | $125.00 | $125.00 |
| 0048 | Field office, type C (628-09403) | MOS | 6 | $3,125.00 | $3,625.00 | $3,400.00 |
| 0049 | Concrete, A, substructure (702-51005) | CYS | 8.30 | $4,625.00 | $5,550.00 | $3,500.00 |
| 0050 | Field drilled hole in concrete (702-51863) | EACH | 68 | $18.00 | $95.00 | $28.00 |
| 0051 | Reinforcing bars, epoxy coated (703-06029) | LBS | 79,177 | $2.00 | $1.70 | $1.55 |
| 0052 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 28 | $47.50 | $55.00 | $55.00 |
| 0053 | Concrete, C, superstructure (704-51002) | CYS | 194.40 | $1,425.00 | $1,600.00 | $1,475.00 |
| 0054 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $2,625.00 | $5,000.00 | $7,100.00 |
| 0055 | Railing, steel type PF-1 (706-11404) | LFT | 504 | $102.75 | $89.00 | $89.00 |
| 0056 | Railing, concrete type PF-1 (706-11602) | CYS | 30 | $784.75 | $2,600.00 | $1,827.00 |
| 0057 | Surface seal , STR. no. 1 (709-51821) | LS | 1 | $1,725.00 | $1.00 | $500.00 |
| 0058 | Patching concrete structures (710-09158) | SFT | 600 | $174.87 | $250.00 | $165.00 |
| 0059 | Structural steel (711-51038) | LS | 1 | $475,000 | $675,000 | $650,000 |
| 0060 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 118 | $41.75 | $13.00 | $27.00 |
| 0061 | Geotextile for underdrains, type 2A (718-12307) | SYS | 63 | $10.25 | $15.00 | $16.00 |
| 0062 | Longitudinal grooving (722-12732) | SYS | 822 | $3.65 | $4.25 | $7.00 |
| 0063 | Bearing assembly, elastomeric (726-92406) | EACH | 24 | $3,875.00 | $4,500.00 | $5,000.00 |
| 0064 | Road closure sign assembly (801-04308) | EACH | 5 | $237.00 | $350.00 | $200.00 |
| 0065 | Detour route marker assembly (801-06625) | EACH | 46 | $141.00 | $150.00 | $85.00 |
| 0066 | Construction sign, type A (801-06640) | EACH | 6 | $191.00 | $200.00 | $175.00 |
| 0067 | Maintaining traffic (801-06775) | LS | 1 | $244,491 | $35,000 | $15,000 |
| 0068 | Barricade, type III-A (801-07118) | LFT | 48 | $16.01 | $18.00 | $15.00 |
| 0069 | Barricade, type III-B (801-07119) | LFT | 72 | $16.01 | $18.00 | $15.00 |
| 0070 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,140 | $0.38 | $0.75 | $0.75 |
| 0071 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,340 | $0.38 | $0.75 | $0.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.