INDOT contract B-44515-A bid tabulation
BRIDGE REPLACEMENT AND DECK OVERLAY. Let by Indiana DOT on July 8, 2026, Whitley, Fort Wayne. 5 bids received; low bid $4,235,938 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 117
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $4,235,938 | Low |
| 2 | R L McCoy Inc | $4,427,416 | +5.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $4,768,963 | +13% |
| 4 | Icc Group Inc | $5,113,000 | +21% |
| 5 | Beaty Construction Inc | $5,233,529 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. R L McCoy Inc | 3. Rieth-Riley Construction Co., Inc. | 4. Icc Group Inc | 5. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $47,000 | $30,000 | $50,000 | $21,100 | $19,640 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $211,797 | $221,300 | $239,091 | $255,650 | $261,650 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $42,359 | $132,800 | $10,000 | $90,000 | $156,900 |
| 0012 | Pavement removal (202-02240) | SYS | 934 | $36.00 | $40.00 | $51.00 | $66.00 | $45.00 |
| 0013 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $15,000 | $20,000 |
| 0014 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $135,000 | $177,000 | $225,000 | $150,190 | $350,000 |
| 0015 | Inlet, remove (202-91385) | EACH | 1 | $650.00 | $510.00 | $3,000.00 | $510.00 | $2,500.00 |
| 0016 | Pipe, remove (202-96133) | LFT | 81 | $37.00 | $34.00 | $40.00 | $34.00 | $45.00 |
| 0017 | Excavation, common (203-02000) | CYS | 1,050 | $81.00 | $100.00 | $1.00 | $110.00 | $45.00 |
| 0018 | Linear grading (203-08607) | LFT | 1,458 | $3.00 | $14.00 | $3.00 | $14.00 | $8.00 |
| 0019 | Pump around (205-11626) | EACH | 1 | $28,000 | $25,000 | $34,471 | $40,000 | $40,000 |
| 0020 | Stormwater management budget (205-12108) | DOL | 59,097 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $7,600.00 | $10,000 | $75,000 | $24,000 | $100,000 |
| 0022 | SWQCP preparation (205-12618) | LS | 1 | $1,800.00 | $3,600.00 | $2,200.00 | $2,400.00 | $2,000.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 7,198 | $35.00 | $38.00 | $44.00 | $47.00 | $48.00 |
| 0024 | Aggregate for end bent backfill (211-06467) | CYS | 72 | $155.00 | $165.00 | $200.00 | $135.00 | $240.00 |
| 0025 | Structure backfill, type 1 (211-09264) | CYS | 18 | $200.00 | $60.00 | $55.00 | $60.00 | $55.00 |
| 0026 | Geotextile for pavement, type 2B (214-12239) | SYS | 994 | $5.00 | $6.00 | $4.50 | $8.00 | $5.00 |
| 0027 | Subbase for PCCP (302-06464) | CYS | 100 | $155.00 | $135.00 | $150.00 | $500.00 | $200.00 |
| 0028 | Compacted aggregate, no. 53 (303-01180) | TON | 1,241 | $45.00 | $51.00 | $45.00 | $51.00 | $53.00 |
| 0029 | Widening with HMA, type D (304-07789) | TON | 868 | $95.00 | $140.00 | $114.00 | $140.00 | $145.00 |
| 0030 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 444 | $8.00 | $10.00 | $11.00 | $6.00 | $15.00 |
| 0031 | Milling, transition (306-08043) | SYS | 662 | $4.50 | $7.00 | $11.00 | $6.00 | $10.00 |
| 0032 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 140 | $190.00 | $190.00 | $188.00 | $190.00 | $190.00 |
| 0033 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 80 | $180.00 | $180.00 | $178.00 | $180.00 | $180.00 |
| 0034 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 338 | $130.00 | $130.00 | $141.00 | $130.00 | $130.00 |
| 0035 | Joint adhesive (401-11526) | LFT | 7,662 | $0.40 | $0.40 | $0.50 | $0.40 | $0.40 |
| 0036 | HMA for temporary pavement, type D (402-10087) | TON | 2,871 | $89.00 | $110.00 | $114.00 | $130.00 | $89.00 |
| 0037 | Asphalt for tack coat (406-05521) | SYS | 15,288 | $0.30 | $0.30 | $0.50 | $0.30 | $0.30 |
| 0038 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 2 | $3,650.00 | $3,650.00 | $4,000.00 | $3,650.00 | $3,650.00 |
| 0039 | Guardrail, remove (601-02241) | LFT | 1,942 | $3.50 | $3.50 | $4.00 | $4.00 | $7.25 |
| 0040 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,069 | $23.50 | $23.50 | $23.00 | $23.00 | $24.00 |
| 0041 | Guardrail, MGS W-beam, double faced, 6 FT 3 in. spacing (601-12284) | LFT | 350 | $33.50 | $33.50 | $36.00 | $36.00 | $35.00 |
| 0042 | Guardrail, MGS W-beam, shop curved, 6 FT 3 in. spacing (601-12286) | LFT | 75 | $28.50 | $28.50 | $45.00 | $45.00 | $39.00 |
| 0043 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,000.00 | $1,000.00 | $1,289.00 | $1,289.00 | $995.00 |
| 0044 | Guardrail transition, MGS with curb (601-12291) | EACH | 1 | $3,900.00 | $3,900.00 | $3,481.00 | $3,481.00 | $3,500.00 |
| 0045 | Guardrail transition, MGS without curb (601-12292) | EACH | 5 | $3,800.00 | $3,800.00 | $3,349.00 | $3,349.00 | $3,400.00 |
| 0046 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,150.00 | $3,150.00 | $3,349.00 | $3,349.00 | $2,406.00 |
| 0047 | Guardrail end treatment, type MS (601-94690) | EACH | 2 | $5,650.00 | $5,650.00 | $5,565.00 | $5,565.00 | $5,750.00 |
| 0048 | Barrier delineator (602-06729) | EACH | 24 | $10.00 | $32.00 | $23.18 | $24.00 | $35.00 |
| 0049 | Curb and gutter, concrete , modified (605-06140) | LFT | 10 | $71.00 | $170.00 | $370.00 | $257.00 | $175.00 |
| 0050 | Curb and gutter, concrete, type B (605-06145) | LFT | 30 | $71.00 | $155.00 | $150.00 | $257.00 | $120.00 |
| 0051 | Milled HMA corrugations, conventional (606-12399) | LFT | 3,836 | $4.00 | $4.75 | $0.88 | $2.00 | $2.00 |
| 0052 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 390 | $175.00 | $225.00 | $150.00 | $225.00 | $185.00 |
| 0053 | Monument, type B (615-06505) | EACH | 2 | $1,100.00 | $1,100.00 | $1,044.00 | $1,044.00 | $1,450.00 |
| 0054 | Aggregate no. 2 (616-000262) | TON | 35 | $63.00 | $75.00 | $1,200.00 | $150.00 | $90.00 |
| 0055 | Grout for riprap (616-02281) | CYS | 162 | $241.00 | $310.00 | $300.00 | $300.00 | $350.00 |
| 0056 | Riprap, class 1 (616-05688) | TON | 1,493 | $63.00 | $105.00 | $105.00 | $115.00 | $105.00 |
| 0057 | Riprap, revetment (616-06405) | TON | 88 | $87.00 | $100.00 | $170.00 | $75.00 | $80.00 |
| 0058 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,634 | $5.00 | $4.50 | $3.50 | $6.00 | $3.00 |
| 0059 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $800.00 | $575.00 | $800.00 | $575.00 |
| 0060 | Erosion control blanket (621-02770) | SYS | 8,164 | $2.35 | $1.75 | $1.75 | $1.75 | $1.75 |
| 0061 | Mulched seeding, type R (621-06559) | SYS | 8,164 | $2.25 | $0.65 | $0.82 | $0.65 | $0.82 |
| 0062 | Water (621-06567) | KGAL | 2 | $1.00 | $1.00 | $10.00 | $1.00 | $10.00 |
| 0063 | Sodding (621-06574) | SYS | 58 | $55.00 | $27.50 | $43.35 | $27.50 | $43.35 |
| 0064 | Field office, type D (628-12683) | MOS | 24 | $5,500.00 | $3,700.00 | $3,050.00 | $3,925.00 | $3,650.00 |
| 0065 | Topsoil processing and distribution (629-000149) | SYS | 8,222 | $17.10 | $3.75 | $10.00 | $5.00 | $6.00 |
| 0066 | Topsoil amendment budget (629-000150) | DOL | 16,444 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0067 | Dynamic pile load test (701-06011) | EACH | 2 | $1,500.00 | $3,500.00 | $1,500.00 | $2,770.00 | $3,200.00 |
| 0068 | Test pile, dynamic, production (701-09557) | LFT | 159 | $155.00 | $47.00 | $90.00 | $140.00 | $54.00 |
| 0069 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $1,500.00 | $2,000.00 | $3,500.00 | $3,400.00 | $1,500.00 |
| 0070 | Pile, steel pipe, 0.250 in., diameter 14 in. (701-09662) | LFT | 1,112 | $89.00 | $81.00 | $81.00 | $135.00 | $105.00 |
| 0071 | Field drilled hole in concrete (702-51863) | EACH | 46 | $13.00 | $25.00 | $85.00 | $30.00 | $35.00 |
| 0072 | Concrete, C, substructure (702-92857) | CYS | 60.70 | $900.00 | $775.00 | $800.00 | $1,600.00 | $1,450.00 |
| 0073 | Reinforcing bars, epoxy coated (703-06029) | LBS | 98,120 | $2.00 | $1.50 | $2.50 | $1.75 | $1.55 |
| 0074 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 46 | $43.00 | $43.00 | $75.00 | $40.00 | $52.00 |
| 0075 | Concrete, C, superstructure (704-51002) | CYS | 195.60 | $1,000.00 | $1,050.00 | $950.00 | $1,250.00 | $1,050.00 |
| 0076 | Railing, concrete type FC (706-11600) | CYS | 21.60 | $810.00 | $700.00 | $700.00 | $700.00 | $825.00 |
| 0077 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $2,000.00 | $2,000.00 | $2,000.00 | $1,350.00 |
| 0078 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $2,500.00 | $4,890.00 | $5,500.00 | $4,890.00 | $3,600.00 |
| 0079 | Structural member, concrete, bulb-T beam, 66 in. X 49 in. (707-11047) | LFT | 448 | $760.00 | $816.00 | $877.00 | $1,100.00 | $875.00 |
| 0080 | Surface seal , STR. no. 1 (709-51821) | LS | 1 | $1,200.00 | $500.00 | $1.00 | $3,470.00 | $1.00 |
| 0081 | Surface seal , STR. no. 2 (709-51821) | LS | 1 | $2,000.00 | $2,500.00 | $3,470.00 | $1,710.00 | $11,128 |
| 0082 | Patching concrete structures (710-09158) | SFT | 200 | $50.00 | $140.00 | $160.00 | $50.00 | $160.00 |
| 0083 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 145 | $22.00 | $69.00 | $30.00 | $69.00 | $45.00 |
| 0084 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 81 | $73.00 | $77.00 | $160.00 | $77.00 | $110.00 |
| 0085 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 110 | $25.00 | $30.00 | $15.00 | $37.10 | $13.00 |
| 0086 | Outlet protector, type 3 (718-06531) | EACH | 5 | $1,600.00 | $3,440.00 | $2,500.00 | $3,140.00 | $2,200.00 |
| 0087 | Geotextile for underdrains, type 2A (718-12307) | SYS | 132 | $7.00 | $7.00 | $5.50 | $15.00 | $4.50 |
| 0088 | Inlet, type N12 (720-45065) | EACH | 1 | $5,500.00 | $7,240.00 | $7,800.00 | $7,240.00 | $6,000.00 |
| 0089 | Bridge deck overlay, rigid (722-000134) | SYS | 583 | $76.00 | $92.00 | $100.00 | $110.00 | $90.00 |
| 0090 | Hydrodemolition (722-01066) | SYS | 583 | $85.00 | $90.00 | $80.00 | $71.00 | $80.00 |
| 0091 | Bridge deck overlay budget (722-12380) | DOL | 19,007 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0092 | Bridge deck, remove concrete surface (722-12464) | SYS | 583 | $20.90 | $20.00 | $20.00 | $17.00 | $23.00 |
| 0093 | Longitudinal grooving (722-12732) | SYS | 1,463 | $3.00 | $8.00 | $9.00 | $9.00 | $5.00 |
| 0094 | Bridge deck patching, full depth (722-51401) | SFT | 200 | $50.00 | $15.00 | $25.00 | $100.00 | $210.00 |
| 0095 | Road closure sign assembly (801-04308) | EACH | 1 | $750.00 | $750.00 | $262.00 | $350.00 | $262.00 |
| 0096 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 49,054 | $1.75 | $1.75 | $2.18 | $2.95 | $2.18 |
| 0097 | Construction sign, type A (801-06640) | EACH | 44 | $500.00 | $500.00 | $221.00 | $205.00 | $221.00 |
| 0098 | Construction sign, type B (801-06645) | EACH | 2 | $200.00 | $200.00 | $113.00 | $160.00 | $113.00 |
| 0099 | Flashing arrow sign (801-06710) | DAY | 360 | $25.00 | $25.00 | $16.00 | $15.00 | $16.00 |
| 0100 | Maintaining traffic (801-06775) | LS | 1 | $130,387 | $112,000 | $150,000 | $23,000 | $277,500 |
| 0101 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $9,300.00 | $9,300.00 | $8,500.00 | $9,100.00 | $11,700 |
| 0102 | Barricade, type III-A (801-07118) | LFT | 96 | $55.00 | $55.00 | $16.22 | $13.00 | $16.22 |
| 0103 | Barricade, type III-B (801-07119) | LFT | 48 | $55.00 | $55.00 | $16.22 | $13.00 | $16.22 |
| 0104 | Temporary crossover drainage pipe (801-07606) | LFT | 505 | $46.00 | $89.00 | $80.00 | $89.00 | $120.00 |
| 0105 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,300 | $66.00 | $34.00 | $70.00 | $72.00 | $77.50 |
| 0106 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 3,200 | $46.00 | $56.00 | $70.00 | $71.00 | $77.50 |
| 0107 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $700.00 | $700.00 | $944.00 | $425.00 | $944.00 |
| 0108 | Temporary crossover, type B (801-52817) | EACH | 2 | $163,000 | $142,000 | $162,795 | $175,000 | $140,000 |
| 0109 | Temporary buzz strips (801-97643) | LFT | 6,912 | $12.00 | $12.00 | $20.30 | $20.15 | $20.30 |
| 0110 | Delineator post, flexible, type I (804-11920) | EACH | 5 | $65.00 | $65.00 | $341.00 | $341.00 | $43.00 |
| 0111 | Line, remove (808-06716) | LFT | 4,536 | $1.00 | $1.00 | $0.62 | $0.90 | $0.62 |
| 0112 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 694 | $1.50 | $1.50 | $0.98 | $0.90 | $0.98 |
| 0113 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 2,871 | $1.50 | $1.50 | $0.98 | $0.90 | $0.98 |
| 0114 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 3,558 | $1.50 | $1.50 | $1.18 | $0.90 | $1.18 |
| 0115 | Grooving for pavement markings (808-12032) | LFT | 6,553 | $0.75 | $0.75 | $0.78 | $0.75 | $0.78 |
| 0116 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 18 | $20.00 | $40.00 | $90.86 | $30.00 | $19.02 |
| 0117 | Snowplowable raised pavement marker (808-75998) | EACH | 18 | $100.00 | $100.00 | $92.00 | $250.00 | $92.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.