INDOT contract B-43797-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on August 6, 2025, Huntington, Wells, Fort Wayne. 3 bids received; low bid $1,986,768 by R L McCoy Inc.
- Owner
- Indiana DOT
- Letting
- 06 AUG 2025
- Pay items
- 111
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R L McCoy Inc | $1,986,768 | Low |
| 2 | Milestone Contractors LP | $2,131,324 | +7.0% |
| 3 | E & B Paving LLC | $2,158,500 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R L McCoy Inc | 2. Milestone Contractors LP | 3. E & B Paving LLC |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,000 | $35,000 | $25,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $1,000.00 | $1,006.94 | $1,500.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $99,000 | $106,566 | $110,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $39,000 | $42,626 | $40,000 |
| 0013 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $5,000.00 | $46,000 | $50,000 |
| 0014 | Pavement removal (202-02240) | SYS | 486 | $50.00 | $58.00 | $120.00 |
| 0015 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $135,000 | $137,412 | $120,000 |
| 0016 | Slopewall, remove (202-51368) | SYS | 64 | $130.00 | $37.00 | $200.00 |
| 0017 | Guardrail end treatment, remove (202-93741) | EACH | 2 | $450.00 | $450.00 | $450.00 |
| 0018 | Fence, farm field, remove (202-99187) | LFT | 130 | $10.00 | $12.00 | $5.00 |
| 0019 | Excavation, common (203-02000) | CYS | 605 | $62.00 | $46.00 | $100.00 |
| 0020 | Linear grading (203-08607) | LFT | 895 | $8.00 | $6.50 | $5.00 |
| 0021 | Stormwater management budget (205-12108) | DOL | 26,700 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $6,000.00 | $6,000.00 | $20,000 |
| 0023 | Excavation, foundation, unclassified (206-51230) | CYS | 50 | $90.00 | $105.00 | $250.00 |
| 0024 | Subgrade treatment, type IC (207-09935) | SYS | 1,109 | $42.00 | $60.00 | $40.00 |
| 0025 | Aggregate for end bent backfill (211-06467) | CYS | 38 | $125.00 | $150.00 | $120.00 |
| 0026 | Flowable backfill, non- removable (213-09269) | CYS | 6 | $625.00 | $850.00 | $750.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,193 | $6.00 | $5.50 | $5.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 86 | $80.00 | $125.00 | $80.00 |
| 0029 | Subbase for PCCP (302-06464) | CYS | 111 | $160.00 | $130.00 | $120.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 483 | $56.00 | $43.00 | $35.00 |
| 0031 | Milling, transition (306-08043) | SYS | 1,502 | $4.00 | $5.50 | $10.00 |
| 0032 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 90 | $96.00 | $96.00 | $96.00 |
| 0033 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 76 | $100.00 | $100.00 | $100.00 |
| 0034 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 38 | $140.00 | $140.00 | $140.00 |
| 0035 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 32 | $156.00 | $156.00 | $156.00 |
| 0036 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 310 | $115.00 | $115.00 | $115.00 |
| 0037 | Joint adhesive, surface (401-10258) | LFT | 1,440 | $1.00 | $1.00 | $1.00 |
| 0038 | Joint adhesive, intermediate (401-10259) | LFT | 360 | $1.00 | $1.00 | $1.00 |
| 0039 | Asphalt for tack coat (406-05520) | TON | 2 | $550.00 | $550.00 | $550.00 |
| 0040 | Terminal joint, type HMA (503-12477) | LFT | 146 | $440.00 | $425.00 | $350.00 |
| 0041 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $2,600.00 | $2,600.00 | $2,600.00 |
| 0042 | Guardrail, remove (601-02241) | LFT | 1,656 | $4.50 | $4.50 | $4.50 |
| 0043 | Guardrail terminal system, W-beam curved, type 7 (601-05071) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0044 | Hand dig guardrail post holes (601-09238) | EACH | 6 | $94.00 | $94.00 | $94.00 |
| 0045 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 788 | $20.50 | $20.50 | $20.50 |
| 0046 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $850.00 | $850.00 | $850.00 |
| 0047 | Guardrail transition, MGS without curb (601-12292) | EACH | 7 | $2,850.00 | $2,850.00 | $2,850.00 |
| 0048 | Guardrail end treatment, type OS (601-94689) | EACH | 5 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0049 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 25 | $23.00 | $23.00 | $23.00 |
| 0050 | Guardrail transition, type GP (601-99123) | EACH | 2 | $3,800.00 | $3,800.00 | $3,800.00 |
| 0051 | Fence, farm field, 47 in. (603-06040) | LFT | 130 | $49.00 | $49.00 | $49.00 |
| 0052 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 505 | $205.00 | $185.00 | $200.00 |
| 0053 | Riprap, revetment (616-06405) | TON | 331 | $75.00 | $170.00 | $100.00 |
| 0054 | Geotextile for riprap, type 1A (616-12246) | SYS | 580 | $5.00 | $14.00 | $5.00 |
| 0055 | Slopewall, concrete, 4 in. (616-51367) | SYS | 64 | $250.00 | $190.00 | $350.00 |
| 0056 | Inspection hole (616-93772) | EACH | 6 | $500.00 | $475.00 | $300.00 |
| 0057 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $425.00 | $800.00 |
| 0058 | Erosion control blanket (621-02770) | SYS | 1,613 | $2.25 | $3.15 | $1.75 |
| 0059 | Seed mixture, type R (621-06553) | LBS | 16 | $42.00 | $16.95 | $5.00 |
| 0060 | Mulched seeding, type R (621-06559) | SYS | 1,309 | $2.90 | $1.80 | $2.75 |
| 0061 | Sodding (621-06574) | SYS | 244 | $24.00 | $21.55 | $10.00 |
| 0062 | Field office, type D (628-12683) | MOS | 12 | $3,625.00 | $4,500.00 | $4,400.00 |
| 0063 | Field drilled hole in concrete (702-51863) | EACH | 58 | $28.00 | $16.00 | $20.00 |
| 0064 | Reinforcing bars, epoxy coated (703-06029) | LBS | 43,252 | $1.50 | $2.25 | $1.25 |
| 0065 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 44 | $52.00 | $50.00 | $20.00 |
| 0066 | Concrete, C, superstructure (704-51002) | CYS | 76.70 | $1,300.00 | $1,500.00 | $400.00 |
| 0067 | Railing, concrete type FC (706-11600) | CYS | 3.70 | $2,300.00 | $1,750.00 | $750.00 |
| 0068 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $3,100.00 | $3,600.00 | $5,000.00 |
| 0069 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $3,900.00 | $3,600.00 | $7,500.00 |
| 0070 | Fiber wrap concrete casing system (709-12077) | SFT | 460 | $60.00 | $45.19 | $25.00 |
| 0071 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $9,000.00 | $6,000.00 | $15,000 |
| 0072 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $3,500.00 | $4,000.00 | $7,500.00 |
| 0073 | Patching concrete structures (710-09158) | SFT | 70 | $230.00 | $252.00 | $300.00 |
| 0074 | Jacking and supporting superstructure , bridge no. 1 (711-90114) | LS | 1 | $20,000 | $25,000 | $75,000 |
| 0075 | Pipe, bridge deck drain system (715-09938) | LS | 1 | $18,000 | $22,500 | $25,000 |
| 0076 | Casting, inlet, adjust to grade (720-12797) | EACH | 4 | $1,200.00 | $1,500.00 | $1,200.00 |
| 0077 | Hydrodemolition (722-01066) | SYS | 2,776 | $70.00 | $49.50 | $60.00 |
| 0078 | Bridge deck overlay budget (722-12380) | DOL | 56,660 | $1.00 | $1.00 | $1.00 |
| 0079 | Bridge deck, remove concrete surface (722-12464) | SYS | 2,776 | $15.00 | $7.50 | $5.00 |
| 0080 | Longitudinal grooving (722-12732) | SYS | 3,351 | $8.00 | $3.00 | $10.00 |
| 0081 | Bridge deck patching, full depth (722-51401) | SFT | 146 | $15.00 | $50.00 | $25.00 |
| 0082 | Overlay dam (722-51874) | SFT | 74 | $80.00 | $125.00 | $50.00 |
| 0083 | Bearing assembly, elastomeric (726-92406) | EACH | 12 | $500.00 | $1,250.00 | $500.00 |
| 0084 | Epoxy injection, crack preparation (727-90308) | LFT | 128 | $25.00 | $63.00 | $63.00 |
| 0085 | Epoxy injection, epoxy material (727-90309) | GAL | 8 | $50.00 | $65.00 | $65.00 |
| 0086 | Epoxy injection, furnishing equipment , bridge no. 1 (727-93560) | LS | 1 | $3,500.00 | $965.00 | $965.00 |
| 0087 | Temporary illumination (801-03621) | LS | 1 | $3,500.00 | $2,500.00 | $1,000.00 |
| 0088 | Road closure sign assembly (801-04308) | EACH | 15 | $175.00 | $175.00 | $350.00 |
| 0089 | Detour route marker assembly (801-06625) | EACH | 78 | $75.00 | $75.00 | $175.00 |
| 0090 | Construction sign, type A (801-06640) | EACH | 86 | $200.00 | $200.00 | $200.00 |
| 0091 | Construction sign, type B (801-06645) | EACH | 4 | $75.00 | $75.00 | $175.00 |
| 0092 | Flashing arrow sign (801-06710) | DAY | 4 | $50.00 | $50.00 | $1,000.00 |
| 0093 | Maintaining traffic (801-06775) | LS | 1 | $20,000 | $50,000 | $150,000 |
| 0094 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $7,200.00 | $7,200.00 | $7,200.00 |
| 0095 | Barricade, type III-A (801-07118) | LFT | 198 | $16.00 | $16.00 | $18.00 |
| 0096 | Barricade, type III-B (801-07119) | LFT | 324 | $16.00 | $16.00 | $18.00 |
| 0097 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 900 | $52.00 | $50.00 | $35.00 |
| 0098 | Portable changeable message sign (801-11642) | EACH | 4 | $4,000.00 | $4,000.00 | $4,250.00 |
| 0099 | Truck mounted attenuator (801-12042) | DAY | 4 | $500.00 | $1,000.00 | $5,000.00 |
| 0100 | Law enforcement officer (801-12324) | HRS | 88 | $60.00 | $60.00 | $60.00 |
| 0101 | Reference post (802-04893) | EACH | 2 | $210.00 | $210.00 | $210.00 |
| 0102 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $310.00 | $310.00 | $310.00 |
| 0103 | Delineator post, flexible, reset (804-97955) | EACH | 10 | $46.00 | $46.00 | $46.00 |
| 0104 | Line, remove (808-06716) | LFT | 1,832 | $0.75 | $0.75 | $0.50 |
| 0105 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 30 | $1.00 | $1.00 | $0.50 |
| 0106 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 3,514 | $1.00 | $1.00 | $0.50 |
| 0107 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 3,394 | $1.00 | $1.00 | $0.50 |
| 0108 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 19 | $66.00 | $30.00 | $1.00 |
| 0110 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 2,859 | $73.00 | $62.00 | $60.00 |
| 0111 | Inertial profiler, bridge encounter (704-000080) | LS | 1 | $7,500.00 | $12,500 | $12,739 |
| 0112 | Corrective grinding, bridge encounter (704-000082) | LS | 1 | $18,000 | $77,000 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.