INDOT contract B-43610-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Wabash, Fort Wayne. 8 bids received; low bid $2,625,854 by Milestone Contractors LP.

Owner
Indiana DOT
Letting
10 DEC 2025
Pay items
83
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Milestone Contractors LP$2,625,854Low
2Beaty Construction Inc$2,650,264+1.0%
3Pontem Contractors Inc$2,801,759+7.0%
4E & B Paving LLC$2,835,500+8.0%
5R L McCoy Inc$3,081,194+17%
6Duncan Robertson Inc$3,264,241+24%
7Icc Group Inc$3,436,000+31%
8Rieth-Riley Construction Co., Inc.$4,473,853+70%
INDOT contract B-43610-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Milestone Contractors LP2. Beaty Construction Inc3. Pontem Contractors Inc4. E & B Paving LLC5. R L McCoy Inc6. Duncan Robertson Inc
0001Construction engineering (105-06845)LS1$33,000$18,033$25,000$40,000$26,000$17,500
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$129,274$125,000$139,000$280,000$154,000$160,000
0010Clearing right-of-way (201-52370)LS1$39,000$44,175$55,500$56,000$61,600$65,000
0011Present structure, remove, structure no. 1 (202-51330)LS1$116,150$67,875$180,981$397,626$300,000$175,000
0012Excavation, common (203-02000)CYS270$163.95$65.00$251.86$200.00$50.00$35.00
0013Borrow (203-02070)CYS7,735$14.27$20.00$25.76$20.00$29.00$30.00
0014Excavation, waterway (203-51223)CYS135$111.00$40.00$71.74$80.00$80.00$25.00
0015Stormwater management budget (205-12108)DOL27,000$1.00$1.00$1.00$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$3,600.00$12,500$50,270$50,000$20,000$30,000
0017SWQCP preparation (205-12618)LS1$3,600.00$4,000.00$5,745.59$5,000.00$3,200.00$2,500.00
0018Excavation, foundation, unclassified (206-51230)CYS415$75.00$35.00$62.20$80.00$75.00$25.00
0019Subgrade treatment, type II (207-08264)SYS54$15.65$44.00$32.87$15.65$40.00$20.00
0020Subgrade treatment, type III (207-08266)SYS1,385$12.00$2.50$4.18$12.00$6.00$8.00
0021Subgrade treatment, type IC (207-09935)SYS2,591$25.98$30.00$36.30$25.98$44.00$40.00
0022B borrow (211-02050)CYS460$88.00$55.00$95.70$20.00$60.00$90.00
0023Aggregate for end bent backfill (211-06467)CYS46$160.00$175.00$92.44$100.00$200.00$145.00
0024Structure backfill, type 3 (211-09266)CYS1,005$80.00$55.00$91.03$25.00$110.00$120.00
0025Geotextile for pavement, type 2B (214-12239)SYS2,263$5.00$5.00$5.50$5.00$8.00$5.50
0026Compacted aggregate, no. 53 (301-12234)CYS137$57.50$90.00$102.91$57.50$112.00$110.00
0027Subbase for PCCP (302-06464)CYS64$175.00$155.00$104.72$120.00$200.00$190.00
0028Compacted aggregate, no. 53 (303-01180)TON490$40.75$60.00$53.13$40.75$55.00$75.00
0029Milling, transition (306-08043)SYS223$20.00$45.00$36.50$20.00$18.00$45.00
0030QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON171$220.00$150.00$242.00$220.00$150.00$165.00
0031QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON285$125.00$125.00$137.50$125.00$125.00$137.00
0032QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON697$90.00$100.00$99.00$90.00$98.00$108.00
0033Joint adhesive (401-11526)LFT3,425$0.50$0.35$0.55$0.50$0.32$0.35
0034HMA for temporary pavement, type B (402-10084)TON169$250.00$170.00$307.01$200.00$240.00$220.00
0035Asphalt for tack coat (406-05521)SYS4,129$2.60$0.55$2.86$2.60$0.53$0.58
0036Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT50$20.00$23.00$25.30$20.00$20.00$22.00
0037Guardrail transition, MGS without curb (601-12292)EACH4$3,325.00$3,525.00$3,877.50$3,325.00$3,325.00$3,657.00
0038Guardrail end treatment, type OS (601-94689)EACH4$2,950.00$2,500.00$275.00$2,950.00$2,950.00$3,245.00
0039Reinforced concrete bridge approach, 10 in. (609-06257)SYS238$185.00$180.00$194.48$150.00$275.00$300.00
0040HMA for approaches, type B (610-07487)TON5$350.00$450.00$385.00$350.00$450.00$495.00
0041Monument, type B (615-06505)EACH2$1,050.00$1,925.00$2,117.50$1,050.00$1,050.00$1,155.00
0042Benchmark post (615-06530)EACH1$2,137.57$2,000.00$1,100.00$800.00$800.00$1,100.00
0043Riprap, revetment (616-06405)TON803$56.00$77.25$87.67$85.00$80.00$65.00
0044Geotextile for riprap, type 1A (616-12246)SYS1,067$3.96$3.50$4.51$5.00$4.00$4.00
0045Mobilization and demobilization for seeding (621-01004)EACH3$425.00$425.00$467.50$500.00$425.00$467.00
0046Fertilizer for permanent seeding (621-06545)TON1$800.00$800.00$880.00$1,450.00$800.00$880.00
0047Mulched seeding, type R (621-06559)SYS3,616$2.45$2.50$2.70$3.25$2.45$2.70
0048Mulching material (621-06565)TON2$510.00$510.00$561.00$900.00$510.00$561.00
0049Sodding (621-06574)SYS172$12.95$13.00$28.64$29.00$12.95$14.00
0050Seed mixture, floodplain (621-12612)LBS3$438.00$440.00$481.80$390.00$438.00$481.00
0051Field office, type C (628-09403)MOS18$4,659.95$2,800.00$3,339.14$2,500.00$2,850.00$2,500.00
0052Computer system equipment (628-11976)EACH1$1,007.48$850.00$824.93$500.00$850.00$1,000.00
0053Test pile, dynamic, production (701-09557)LFT175$150.00$125.00$137.24$75.00$107.00$75.00
0054Test pile, dynamic, restrike (701-09559)EACH2$6,200.00$6,000.00$5,104.50$5,000.00$8,000.00$10,000
0055Conical pile tip, 14 in. (701-09679)EACH16$513.00$500.00$419.91$600.00$450.00$650.00
0056Pile, steel pipe, 0.5 in., diameter 14 in. (701-09826)LFT1,085$117.00$125.00$90.68$72.00$112.00$75.00
0057Concrete, C, substructure (702-92857)CYS41$1,200.00$1,650.00$856.13$1,500.00$1,200.00$1,500.00
0058Reinforcing bars, epoxy coated (703-06029)LBS70,626$1.90$1.55$1.50$1.50$1.45$1.75
0059Threaded tie bar assembly, epoxy coated (703-97936)EACH468$53.00$58.00$53.63$20.00$62.00$65.00
0060Concrete, C, superstructure (704-51002)CYS148.90$1,500.00$1,600.00$1,200.03$1,320.00$1,500.00$1,600.00
0061Railing, concrete type FC (706-11600)CYS17.80$1,100.00$1,850.00$1,672.00$1,520.00$1,520.00$1,100.00
0062Concrete bridge railing transition, type TFC (706-11620)EACH4$3,000.00$4,800.00$2,750.00$2,500.00$2,500.00$2,500.00
0063Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865)LFT458$610.00$643.00$630.84$750.00$710.00$1,100.00
0064Surface seal (709-51821)LS1$1,200.00$1.00$5,500.00$1.00$500.00$2,200.00
0065Temporary causeway (713-04331)LS1$110,000$177,000$70,370$75,000$120,000$250,000
0066Pipe, end bent drain, diameter 6 in. (715-05407)LFT120$171.00$16.75$24.57$10.00$38.00$15.00
0067Geotextile for underdrains, type 2B (718-12308)SYS106$11.00$9.00$12.24$5.00$11.00$4.00
0068Longitudinal grooving (722-12732)SYS633$1.00$10.00$19.38$4.00$16.00$8.00
0069Temporary wire-facing (735-10241)SFT3,376$40.00$24.15$23.42$10.00$30.00$25.00
0070Temporary wall erection (735-10242)SFT3,376$12.00$15.00$16.72$7.00$23.00$25.00
0071Temporary pavement marking, 4 in. (801-06203)LFT4,200$0.40$1.00$1.10$0.20$0.40$0.44
0072Temporary pavement marking, removable, 4 in. (801-06207)LFT4,100$1.35$1.00$1.76$0.80$1.35$1.50
0073Temporary transverse pavement marking, removable, 24 in. (801-06218)LFT24$10.00$16.00$17.60$11.04$10.00$11.00
0074Construction sign, type A (801-06640)EACH10$200.00$200.00$220.00$221.00$200.00$220.00
0075Construction sign, type B (801-06645)EACH2$100.00$140.73$132.00$111.00$100.00$110.00
0076Maintaining traffic (801-06775)LS1$9,500.00$48,000$30,540$50,000$8,300.00$40,000
0077Energy absorbing terminal, CZ, TL-3 (801-07024)EACH2$6,800.00$8,650.00$9,515.00$3,000.00$6,800.00$9,020.00
0078Barricade, type III-A (801-07118)LFT72$20.00$17.00$18.70$25.00$20.00$22.00
0079Temporary traffic barrier, anchored, type 2 (801-08508)LFT690$62.00$100.00$45.74$40.00$100.00$60.00
0080Fixed temporary signal (801-12082)LS1$83,510$104,000$118,226$65,000$104,000$96,500
0081Temporary worksite speed limit sign assembly, continuous (801-12883)EACH2$500.00$1,325.00$1,444.30$800.00$500.00$550.00
0082Line, paint, solid, white, 4 in. (808-06713)LFT2,000$0.60$1.00$1.10$0.38$0.60$0.66
0083Line, paint, solid, yellow, 4 in. (808-06714)LFT2,000$0.60$1.00$1.10$0.38$0.60$0.66
INDOT contract B-43610-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy