INDOT contract B-44266-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on November 5, 2026, Jay, Greenfield. 2 bids received; low bid $1,189,800 by Milestone Contractors LP.

Owner
Indiana DOT
Letting
05 NOV 2026
Pay items
69
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Milestone Contractors LP$1,189,800Low
2Duncan Robertson Inc$1,225,178+3.0%
INDOT contract B-44266-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Milestone Contractors LP2. Duncan Robertson Inc
0001Construction engineering (105-06845)LS1$15,000$12,500
0002Liquidated damages (109-08359)DOL1$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$59,000$60,000
0010Clearing right-of-way (201-52370)LS1$23,000$12,000
0011Present structure, remove, structure no. 1 (202-51330)LS1$82,490$150,000
0012Excavation, common (203-02000)CYS525$96.00$45.00
0013Borrow (203-02070)CYS340$22.00$1.00
0014Excavation, waterway (203-51223)CYS355$47.00$50.00
0015Stormwater management budget (205-12108)DOL23,641.70$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$5,000.00$24,000
0017Excavation, foundation, unclassified (206-51230)CYS24$62.00$85.00
0018Cofferdam (206-51235)LS1$14,500$30,000
0019Subgrade treatment, type IC (207-09935)SYS1,663$36.00$40.00
0020Aggregate for end bent backfill (211-06467)CYS24$175.00$120.00
0021Structure backfill, type 1 (211-09264)CYS3$612.00$120.00
0022Geotextile for pavement, type 2B (214-12239)SYS2,431$5.50$3.50
0023Compacted aggregate, no. 2 (301-12231)CYS60$74.00$60.00
0024Compacted aggregate, no. 53 (301-12234)CYS60$94.00$85.00
0025Subbase for PCCP (302-06464)CYS32$170.00$150.00
0026Compacted aggregate, no. 53 (303-01180)TON362$60.00$55.00
0027QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON119$226.00$207.00
0028QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON199$187.00$156.00
0029QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON490$140.00$140.00
0030Joint adhesive (401-11526)LFT1,168$1.00$0.58
0031Asphalt for tack coat (406-05521)SYS4,343$0.50$0.38
0032Guardrail terminal system, W-beam, curved, type 6 (601-01839)EACH1$3,175.00$3,325.00
0033Guardrail, remove (601-02241)LFT264$6.50$6.00
0034Guardrail transition, type TGS-1 (601-06374)EACH1$1,400.00$1,485.00
0035Guardrail transition, type TGS-1 , modified (601-06374)EACH3$1,400.00$1,485.00
0036Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT150$30.00$31.00
0037Guardrail end treatment, type OS (601-94689)EACH3$3,225.00$3,380.00
0038Reinforced concrete bridge approach, 10 in. (609-06257)SYS130$210.00$250.00
0039Right-of-way marker (615-06490)EACH11$165.00$175.00
0040Monument, type B (615-06505)EACH2$1,040.00$1,100.00
0041Riprap, revetment (616-06405)TON301$62.00$55.00
0042Geotextile for riprap, type 1A (616-12246)SYS449$2.00$3.00
0043Mobilization and demobilization for seeding (621-01004)EACH2$850.00$880.00
0044Erosion control blanket (621-02770)SYS1,192$2.00$1.90
0045Mulched seeding, type R (621-06559)SYS2,617$1.75$1.65
0046Water (621-06567)KGAL2$1.00$1.10
0047Sodding (621-06574)SYS242$12.00$12.50
0048Field office, type A (628-09401)MOS8$3,800.00$2,500.00
0049Test pile, indicator, production (701-09558)LFT124$139.00$100.00
0050Test pile, indicator, restrike (701-09560)EACH2$2,600.00$2,000.00
0051Pile shoe, HP 12 X 74 (701-09683)EACH18$115.00$250.00
0052Reinforced concrete encasement for H piles (701-12709)LFT120$250.00$350.00
0053Pile, steel H, HP 12 X 74 (701-95780)LFT834$130.00$100.00
0054Reinforcing bars, epoxy coated (703-06029)LBS45,980$1.75$2.00
0055Threaded tie bar assembly, epoxy coated (703-97936)EACH28$50.00$65.00
0056Concrete, C, superstructure (704-51002)CYS161.10$1,400.00$1,400.00
0057Railing, steel type TS-1 (706-06344)LFT144$135.00$77.00
0058Surface seal (709-51821)LS1$500.00$1,750.00
0059Pipe, type 3, circular, diameter 15 in. (715-05169)LFT55$88.00$75.00
0060Pipe, end bent drain, diameter 6 in. (715-05407)LFT118$27.00$15.00
0061Pipe end section, diameter 15 in. (715-46005)EACH2$1,000.00$750.00
0062Geotextile for underdrains, type 2B (718-12308)SYS76$10.00$3.00
0063Longitudinal grooving (722-12732)SYS365$9.00$12.00
0064Road closure sign assembly (801-04308)EACH4$245.00$220.00
0065Detour route marker assembly (801-06625)EACH23$140.00$94.00
0066Construction sign, type A (801-06640)EACH21$175.00$192.00
0067Maintaining traffic (801-06775)LS1$7,500.00$20,000
0068Barricade, type III-A (801-07118)LFT48$15.00$20.00
0069Barricade, type III-B (801-07119)LFT48$15.00$20.00
INDOT contract B-44266-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy