INDOT contract R-44492-A bid tabulation
SMALL STRUCTURE REPLACEMENT AND PIPE LINING. Let by Indiana DOT on November 5, 2026, Orange, Vincennes. 7 bids received; low bid $798,232 by Temple & Temple Excavating & Paving Inc.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 69
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Temple & Temple Excavating & Paving Inc | $798,232 | Low |
| 2 | E & B Paving LLC | $799,700 | 0.0% |
| 3 | Blankenberger Brothers Inc | $866,870 | +9.0% |
| 4 | Milestone Contractors LP | $898,280 | +13% |
| 5 | Ragle, Inc. | $925,220 | +16% |
| 6 | CLR Inc | $942,572 | +18% |
| 7 | Morphey Construction Inc. | $969,000 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Temple & Temple Excavating & Paving Inc | 2. E & B Paving LLC | 3. Blankenberger Brothers Inc | 4. Milestone Contractors LP | 5. Ragle, Inc. | 6. CLR Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,203 | $19,701 | $18,000 | $12,400 | $5,000.00 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $13,425 | $38,000 | $43,300 | $44,900 | $45,000 | $47,125 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $10,023 | $15,000 | $17,300 | $19,000 | $25,000 | $18,850 |
| 0012 | Pavement removal (202-02240) | SYS | 80 | $26.52 | $55.00 | $31.65 | $23.65 | $35.00 | $56.00 |
| 0013 | Excavation, unclassified (203-02020) | CYS | 222 | $36.03 | $73.00 | $74.55 | $130.00 | $35.00 | $85.00 |
| 0014 | Pump around (205-11626) | EACH | 2 | $2,517.43 | $8,000.00 | $22,500 | $15,500 | $18,000 | $15,000 |
| 0015 | Stormwater management budget (205-12108) | DOL | 15,472 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $17,153 | $18,000 | $15,000 | $900.00 | $5,000.00 | $2,500.00 |
| 0017 | Subgrade treatment, type II (207-08264) | SYS | 116 | $40.76 | $55.00 | $34.95 | $34.00 | $45.00 | $22.00 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 612 | $49.55 | $50.00 | $49.20 | $40.50 | $45.00 | $39.00 |
| 0019 | Structure backfill, type 2 (211-09265) | CYS | 42 | $113.30 | $70.00 | $112.90 | $95.00 | $50.00 | $175.00 |
| 0020 | Structure backfill, type 5 (211-09268) | CYS | 46 | $175.37 | $490.00 | $272.30 | $400.00 | $375.00 | $475.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 612 | $3.59 | $5.00 | $6.00 | $6.15 | $7.00 | $4.50 |
| 0022 | Compacted aggregate, no. 8 (301-12233) | CYS | 3 | $504.38 | $250.00 | $233.80 | $315.00 | $300.00 | $395.00 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 20 | $140.00 | $95.00 | $182.30 | $105.00 | $100.00 | $125.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 95 | $85.99 | $58.00 | $61.50 | $35.25 | $54.00 | $95.00 |
| 0025 | Widening with HMA, type B (304-07493) | TON | 111 | $150.60 | $235.00 | $179.00 | $172.00 | $179.00 | $250.00 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 488 | $8.89 | $15.00 | $14.00 | $22.00 | $11.00 | $15.00 |
| 0027 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 68 | $200.00 | $270.00 | $310.00 | $375.00 | $310.00 | $345.00 |
| 0028 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 46 | $200.00 | $270.00 | $172.00 | $280.29 | $172.00 | $191.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 112 | $200.00 | $150.00 | $170.00 | $160.00 | $170.00 | $189.00 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,143 | $1.00 | $0.22 | $0.40 | $0.16 | $0.40 | $0.40 |
| 0031 | Joint adhesive (410-000228) | LFT | 1,428 | $1.25 | $3.56 | $1.20 | $0.75 | $1.20 | $1.20 |
| 0032 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $3,647.59 | $2,975.00 | $2,975.00 | $2,975.00 | $2,975.00 | $4,500.00 |
| 0033 | Guardrail, remove (601-02241) | LFT | 296 | $6.13 | $5.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 0034 | Guardrail, reset (601-06035) | LFT | 50 | $18.39 | $15.00 | $15.00 | $15.00 | $15.00 | $10.00 |
| 0035 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 81 | $33.10 | $27.00 | $27.00 | $27.00 | $27.00 | $30.00 |
| 0036 | Guardrail, MGS, long span, type 1 (601-12287) | EACH | 2 | $1,501.95 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,375.00 |
| 0037 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,348.69 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,250.00 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $4,107.37 | $3,350.00 | $3,350.00 | $3,350.00 | $3,350.00 | $3,350.00 |
| 0039 | HMA for approaches, type B (610-07487) | TON | 26 | $287.76 | $341.67 | $297.00 | $233.00 | $297.00 | $297.00 |
| 0040 | Right-of-way marker (615-06490) | EACH | 6 | $245.22 | $200.00 | $200.00 | $200.00 | $200.00 | $120.00 |
| 0041 | Monument, type B (615-06505) | EACH | 2 | $1,379.34 | $1,125.00 | $1,125.00 | $1,125.00 | $1,125.00 | $650.00 |
| 0042 | Riprap, class 1 (616-05688) | TON | 45 | $175.00 | $65.00 | $45.00 | $103.00 | $120.00 | $175.00 |
| 0043 | Riprap, class 2 (616-05689) | TON | 78 | $269.00 | $70.00 | $47.00 | $108.00 | $105.00 | $105.00 |
| 0044 | Riprap, uniform (616-06451) | TON | 1 | $721.58 | $150.00 | $336.00 | $725.00 | $200.00 | $875.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 133 | $7.52 | $5.00 | $6.00 | $7.00 | $7.00 | $15.00 |
| 0046 | Geotextile for riprap, type 2A (616-12248) | SYS | 25 | $11.36 | $28.00 | $30.00 | $51.00 | $55.00 | $23.00 |
| 0047 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $1,471.30 | $1,200.00 | $1,200.00 | $1,050.00 | $1,200.00 | $1,350.00 |
| 0048 | Erosion control blanket (621-02770) | SYS | 750 | $2.45 | $2.00 | $2.00 | $2.05 | $2.00 | $2.25 |
| 0049 | Mulched seeding, type R (621-06559) | SYS | 1,739 | $2.76 | $2.25 | $2.25 | $2.73 | $2.25 | $2.50 |
| 0050 | Sodding (621-06574) | SYS | 85 | $61.30 | $50.00 | $50.00 | $37.00 | $60.00 | $50.00 |
| 0051 | Computer system equipment (628-11976) | EACH | 1 | $1,226.08 | $700.00 | $550.00 | $1,200.00 | $1,000.00 | $100.00 |
| 0052 | Field office, type D (628-12683) | MOS | 10 | $2,800.00 | $3,015.30 | $2,950.00 | $4,100.00 | $3,000.00 | $1,000.00 |
| 0053 | Concrete, B, footings (702-51015) | CYS | 7.40 | $4,022.65 | $1,000.00 | $775.00 | $935.00 | $1,800.00 | $2,000.00 |
| 0054 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,020 | $6.86 | $4.00 | $6.50 | $2.25 | $4.50 | $7.00 |
| 0055 | Structure, coated reinforced concrete, box sections, 11 FT X 5 FT (714-12838) | LFT | 38 | $1,616.53 | $2,500.00 | $3,600.00 | $3,675.00 | $4,200.00 | $4,325.00 |
| 0056 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 50 | $72.44 | $100.00 | $75.00 | $101.00 | $120.00 | $75.00 |
| 0057 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $2,309.19 | $550.00 | $1,200.00 | $918.00 | $800.00 | $450.00 |
| 0058 | Pipe liner, cured-in- place, 60 in. (725-11288) | LFT | 271 | $1,241.04 | $880.00 | $995.50 | $799.64 | $1,200.00 | $1,150.00 |
| 0059 | Road closure sign assembly (801-04308) | EACH | 6 | $153.26 | $245.00 | $245.00 | $500.00 | $300.00 | $125.00 |
| 0060 | Detour route marker assembly (801-06625) | EACH | 41 | $79.70 | $145.00 | $145.00 | $150.00 | $120.00 | $65.00 |
| 0061 | Construction sign, type A (801-06640) | EACH | 25 | $214.56 | $169.00 | $169.00 | $350.00 | $180.00 | $175.00 |
| 0062 | Maintaining traffic (801-06775) | LS | 1 | $5,517.37 | $41,122 | $25,973 | $93,713 | $23,000 | $25,388 |
| 0063 | Barricade, type III-A (801-07118) | LFT | 72 | $9.81 | $14.29 | $14.29 | $28.00 | $17.00 | $8.00 |
| 0064 | Barricade, type III-B (801-07119) | LFT | 96 | $9.81 | $14.29 | $14.29 | $28.00 | $17.00 | $8.00 |
| 0065 | Reference post (802-04893) | EACH | 1 | $429.13 | $350.00 | $350.00 | $350.00 | $350.00 | $390.00 |
| 0066 | Sign, ground mounted, reset (802-91122) | EACH | 4 | $459.78 | $375.00 | $375.00 | $375.00 | $375.00 | $220.00 |
| 0067 | Grooving for pavement markings (808-12032) | LFT | 1,084 | $2.45 | $0.61 | $0.61 | $2.00 | $0.75 | $1.20 |
| 0068 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 542 | $3.07 | $1.88 | $1.88 | $2.00 | $1.00 | $3.00 |
| 0069 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 542 | $3.07 | $1.88 | $1.88 | $2.00 | $1.00 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.