SMALL STRUCTURE REPLACEMENT AND PIPE LINING. Let by Indiana DOT on November 5, 2026, Orange, Vincennes. 7 bids received; low bid $798,232 by Temple & Temple Excavating & Paving Inc.

Owner
Indiana DOT
Letting
05 NOV 2026
Pay items
69
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Temple & Temple Excavating & Paving Inc$798,232Low
2E & B Paving LLC$799,7000.0%
3Blankenberger Brothers Inc$866,870+9.0%
4Milestone Contractors LP$898,280+13%
5Ragle, Inc.$925,220+16%
6CLR Inc$942,572+18%
7Morphey Construction Inc.$969,000+21%
INDOT contract R-44492-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Temple & Temple Excavating & Paving Inc2. E & B Paving LLC3. Blankenberger Brothers Inc4. Milestone Contractors LP5. Ragle, Inc.6. CLR Inc
0001Construction engineering (105-06845)LS1$15,203$19,701$18,000$12,400$5,000.00$25,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$13,425$38,000$43,300$44,900$45,000$47,125
0011Clearing right-of-way (201-52370)LS1$10,023$15,000$17,300$19,000$25,000$18,850
0012Pavement removal (202-02240)SYS80$26.52$55.00$31.65$23.65$35.00$56.00
0013Excavation, unclassified (203-02020)CYS222$36.03$73.00$74.55$130.00$35.00$85.00
0014Pump around (205-11626)EACH2$2,517.43$8,000.00$22,500$15,500$18,000$15,000
0015Stormwater management budget (205-12108)DOL15,472$1.00$1.00$1.00$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$17,153$18,000$15,000$900.00$5,000.00$2,500.00
0017Subgrade treatment, type II (207-08264)SYS116$40.76$55.00$34.95$34.00$45.00$22.00
0018Subgrade treatment, type IC (207-09935)SYS612$49.55$50.00$49.20$40.50$45.00$39.00
0019Structure backfill, type 2 (211-09265)CYS42$113.30$70.00$112.90$95.00$50.00$175.00
0020Structure backfill, type 5 (211-09268)CYS46$175.37$490.00$272.30$400.00$375.00$475.00
0021Geotextile for pavement, type 2B (214-12239)SYS612$3.59$5.00$6.00$6.15$7.00$4.50
0022Compacted aggregate, no. 8 (301-12233)CYS3$504.38$250.00$233.80$315.00$300.00$395.00
0023Compacted aggregate, no. 53 (301-12234)CYS20$140.00$95.00$182.30$105.00$100.00$125.00
0024Compacted aggregate, no. 53 (303-01180)TON95$85.99$58.00$61.50$35.25$54.00$95.00
0025Widening with HMA, type B (304-07493)TON111$150.60$235.00$179.00$172.00$179.00$250.00
0026Milling, asphalt, 1 1/2 in. (306-08034)SYS488$8.89$15.00$14.00$22.00$11.00$15.00
0027QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON68$200.00$270.00$310.00$375.00$310.00$345.00
0028QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON46$200.00$270.00$172.00$280.29$172.00$191.00
0029QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON112$200.00$150.00$170.00$160.00$170.00$189.00
0030Asphalt for tack coat (406-05521)SYS1,143$1.00$0.22$0.40$0.16$0.40$0.40
0031Joint adhesive (410-000228)LFT1,428$1.25$3.56$1.20$0.75$1.20$1.20
0032Guardrail terminal system, W-beam, curved, type 3 (601-01846)EACH1$3,647.59$2,975.00$2,975.00$2,975.00$2,975.00$4,500.00
0033Guardrail, remove (601-02241)LFT296$6.13$5.00$5.00$5.00$5.00$6.00
0034Guardrail, reset (601-06035)LFT50$18.39$15.00$15.00$15.00$15.00$10.00
0035Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT81$33.10$27.00$27.00$27.00$27.00$30.00
0036Guardrail, MGS, long span, type 1 (601-12287)EACH2$1,501.95$1,225.00$1,225.00$1,225.00$1,225.00$1,375.00
0037Guardrail height transition, MGS (601-12289)EACH1$1,348.69$1,100.00$1,100.00$1,100.00$1,100.00$1,250.00
0038Guardrail end treatment, type OS (601-94689)EACH3$4,107.37$3,350.00$3,350.00$3,350.00$3,350.00$3,350.00
0039HMA for approaches, type B (610-07487)TON26$287.76$341.67$297.00$233.00$297.00$297.00
0040Right-of-way marker (615-06490)EACH6$245.22$200.00$200.00$200.00$200.00$120.00
0041Monument, type B (615-06505)EACH2$1,379.34$1,125.00$1,125.00$1,125.00$1,125.00$650.00
0042Riprap, class 1 (616-05688)TON45$175.00$65.00$45.00$103.00$120.00$175.00
0043Riprap, class 2 (616-05689)TON78$269.00$70.00$47.00$108.00$105.00$105.00
0044Riprap, uniform (616-06451)TON1$721.58$150.00$336.00$725.00$200.00$875.00
0045Geotextile for riprap, type 1A (616-12246)SYS133$7.52$5.00$6.00$7.00$7.00$15.00
0046Geotextile for riprap, type 2A (616-12248)SYS25$11.36$28.00$30.00$51.00$55.00$23.00
0047Mobilization and demobilization for seeding (621-01004)EACH2$1,471.30$1,200.00$1,200.00$1,050.00$1,200.00$1,350.00
0048Erosion control blanket (621-02770)SYS750$2.45$2.00$2.00$2.05$2.00$2.25
0049Mulched seeding, type R (621-06559)SYS1,739$2.76$2.25$2.25$2.73$2.25$2.50
0050Sodding (621-06574)SYS85$61.30$50.00$50.00$37.00$60.00$50.00
0051Computer system equipment (628-11976)EACH1$1,226.08$700.00$550.00$1,200.00$1,000.00$100.00
0052Field office, type D (628-12683)MOS10$2,800.00$3,015.30$2,950.00$4,100.00$3,000.00$1,000.00
0053Concrete, B, footings (702-51015)CYS7.40$4,022.65$1,000.00$775.00$935.00$1,800.00$2,000.00
0054Waterproofing membrane, type 2 (714-000086)SFT1,020$6.86$4.00$6.50$2.25$4.50$7.00
0055Structure, coated reinforced concrete, box sections, 11 FT X 5 FT (714-12838)LFT38$1,616.53$2,500.00$3,600.00$3,675.00$4,200.00$4,325.00
0056Pipe, type 3, circular, diameter 15 in. (715-05169)LFT50$72.44$100.00$75.00$101.00$120.00$75.00
0057Pipe end section, diameter 15 in. (715-46005)EACH2$2,309.19$550.00$1,200.00$918.00$800.00$450.00
0058Pipe liner, cured-in- place, 60 in. (725-11288)LFT271$1,241.04$880.00$995.50$799.64$1,200.00$1,150.00
0059Road closure sign assembly (801-04308)EACH6$153.26$245.00$245.00$500.00$300.00$125.00
0060Detour route marker assembly (801-06625)EACH41$79.70$145.00$145.00$150.00$120.00$65.00
0061Construction sign, type A (801-06640)EACH25$214.56$169.00$169.00$350.00$180.00$175.00
0062Maintaining traffic (801-06775)LS1$5,517.37$41,122$25,973$93,713$23,000$25,388
0063Barricade, type III-A (801-07118)LFT72$9.81$14.29$14.29$28.00$17.00$8.00
0064Barricade, type III-B (801-07119)LFT96$9.81$14.29$14.29$28.00$17.00$8.00
0065Reference post (802-04893)EACH1$429.13$350.00$350.00$350.00$350.00$390.00
0066Sign, ground mounted, reset (802-91122)EACH4$459.78$375.00$375.00$375.00$375.00$220.00
0067Grooving for pavement markings (808-12032)LFT1,084$2.45$0.61$0.61$2.00$0.75$1.20
0068Line, thermoplastic, solid, white, 6 in. (808-75043)LFT542$3.07$1.88$1.88$2.00$1.00$3.00
0069Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT542$3.07$1.88$1.88$2.00$1.00$3.00
INDOT contract R-44492-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy