Blankenberger Brothers Inc: INDOT bid record
Blankenberger Brothers Inc submitted 46 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 18 of them (39%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $98,743,880
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 6 | 5 | 83% |
| 2023 | 7 | 2 | 29% |
| 2024 | 9 | 3 | 33% |
| 2025 | 10 | 3 | 30% |
| 2026 | 14 | 5 | 36% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Vincennes | 44 | 17 | 39% |
| Seymour | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 46 | 46 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 46 | 46 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 46 | 46 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 45 | 45 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 44 | 44 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 42 | 42 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 35 | 35 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 40 | 22 (55%) | $1,050.00 | $525.00 |
| Road closure sign assembly | 801-04308 | EACH | 36 | 19 (53%) | $263.57 | $280.00 |
| Project estimate adjustment | 109-08463 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Joint adhesive, intermediate | 401-10259 | LFT | 22 | 17 (77%) | $0.57 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ragle, Inc. | 38 | 13 of 38 |
| E & B Paving LLC | 30 | 10 of 30 |
| CLR Inc | 13 | 5 of 13 |
| Deig Brothers Lumber & Constr | 9 | 0 of 9 |
| Milestone Contractors LP | 8 | 1 of 8 |
| Force Construction Co Inc | 5 | 1 of 5 |
| Jbi Construction Inc | 5 | 4 of 5 |
| Weddle Brothers Highway Group LLC | 4 | 2 of 4 |
| Lutgring Brothers Inc | 4 | 3 of 4 |
| Beaty Construction Inc | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-44492-A | Vincennes | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 3 of 7 | $866,870 | +9.0% |
| 07 OCT 2026 | R-43748-A | Seymour | SMALL STRUCTURE REPLACEMENT | 1 of 5 | $1,076,573 | Low, 2.0% under the second |
| 07 OCT 2026 | R-44523-A | Vincennes | SMALL STRUCTURE REPLACEMENT | 2 of 5 | $758,700 | +7.0% |
| 02 SEP 2026 | B-44287-A | Vincennes | BRIDGE REPLACEMENT | 3 of 4 | $2,577,000 | +22% |
| 02 SEP 2026 | B-44507-A | Vincennes | BRIDGE DECK REPLACEMENT, REPLACE SUPERSTRUCTURE AND DRAINS | 2 of 3 | $24,894,000 | +11% |
| 08 JUL 2026 | R-44285-A | Vincennes | ROAD RECONSTRUCTION | 1 of 5 | $5,370,050 | Low, 2.0% under the second |
| 15 APR 2026 | R-43995-A | Vincennes | PAVEMENT REPLACEMENT, SLIDE CORRECTION, ADA SIDEWALK CONSTR | 2 of 3 | $15,693,400 | +3.0% |
| 08 APR 2026 | R-45570-A | Vincennes | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 4 | $619,551 | Low, 7.0% under the second |
| 11 FEB 2026 | R-42008-A | Vincennes | ROAD RECONSTRUCTION AND BRIDGE REHABILITATION OR REPAIR | 3 of 5 | $3,733,000 | +8.0% |
| 11 FEB 2026 | R-45152-A | Vincennes | PAVEMENT REPLACEMENT, INTERSECTION IMPROVEMENT AND ADA RAMPS | 3 of 3 | $39,508,500 | +13% |
| 14 JAN 2026 | R-43470-A | Vincennes | HMA OVERLAY, STRUCTURAL | 1 of 3 | $9,756,450 | Low, 1.0% under the second |
| 14 JAN 2026 | R-43608-A | Vincennes | BIKE AND PEDESTRIAN FACILITIES | 3 of 4 | $1,646,800 | +23% |
| 14 JAN 2026 | R-45752-A | Vincennes | SLIDE CORRECTION | 3 of 6 | $4,533,875 | +18% |
| 14 JAN 2026 | B-43233-A | Vincennes | SMALL STRUCTURE REPLACEMENT | 1 of 5 | $1,467,300 | Low, 6.0% under the second |
| 10 DEC 2025 | R-42808-A | Vincennes | ROAD RECONSTRUCTION | 3 of 4 | $5,798,000 | +3.0% |
| 10 DEC 2025 | B-43968-A | Vincennes | REPLACE SUPERSTRUCTURE | 1 of 2 | $4,256,000 | Low, 4.0% under the second |
| 10 DEC 2025 | B-43969-A | Vincennes | BRIDGE DECK OVERLAY | 4 of 4 | $3,335,005 | +21% |
| 13 NOV 2025 | B-43235-A | Vincennes | BRIDGE REPLACEMENT | 2 of 6 | $1,588,925 | +7.0% |
| 10 SEP 2025 | R-43985-A | Vincennes | SLIDE CORRECTION | 6 of 10 | $1,020,620 | +28% |
| 10 SEP 2025 | B-43972-A | Vincennes | BRIDGE DECK OVERLAY, BRIDGE THIN DECK OVERLAY | 4 of 4 | $1,993,400 | +20% |
| 10 SEP 2025 | B-46016-A | Vincennes | BRIDGE MAINTENANCE AND REPAIR | 2 of 3 | $882,487 | +9.0% |
| 07 MAY 2025 | B-41455-A | Vincennes | BRIDGE REPLACEMENT | 3 of 5 | $11,295,940 | +6.0% |
| 12 FEB 2025 | B-42810-A | Vincennes | BRIDGE REPLACEMENT | 1 of 2 | $2,053,875 | Low, 20% under the second |
| 15 JAN 2025 | B-39418-B | Vincennes | BRIDGE REPLACEMENT | 1 of 3 | $1,357,800 | Low, 1.0% under the second |
| 11 DEC 2024 | B-42732-A | Vincennes | BRIDGE DECK OVERLAY AND SMALL STRUCTURE REPLACEMENT | 1 of 5 | $2,252,300 | Low, 2.0% under the second |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.