Lutgring Brothers Inc: INDOT bid record
Lutgring Brothers Inc submitted 21 bids on Indiana DOT contracts in the data, from 05 MAY 2022 to 14 JAN 2026, and was the low bidder on 7 of them (33%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $23,531,100
- Latest bid
- 14 JAN 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 1 | 50% |
| 2023 | 4 | 3 | 75% |
| 2024 | 5 | 0 | 0% |
| 2025 | 9 | 2 | 22% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Vincennes | 18 | 5 | 28% |
| Seymour | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Stormwater management budget | 205-12108 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Liquidated damages | 109-08359 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Line, paint, solid, white, 6 in. | 808-75007 | LFT | 12 | 10 (83%) | $0.57 | $1.00 |
| Line, paint, solid, yellow, 6 in. | 808-75047 | LFT | 10 | 9 (90%) | $0.49 | $1.00 |
| Snowplowable raised pavement marker | 808-75998 | EACH | 13 | 8 (62%) | $109.00 | $89.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & B Paving LLC | 19 | 8 of 19 |
| Ragle, Inc. | 11 | 7 of 11 |
| Force Construction Co Inc | 6 | 1 of 6 |
| CLR Inc | 5 | 2 of 5 |
| Milestone Contractors LP | 5 | 3 of 5 |
| Morphey Construction Inc. | 5 | 0 of 5 |
| Deig Brothers Lumber & Constr | 4 | 1 of 4 |
| Mac Construction & Excavating Inc | 4 | 1 of 4 |
| 5 Star Company Inc | 4 | 2 of 4 |
| Blankenberger Brothers Inc | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 JAN 2026 | R-45573-A | Vincennes | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 4 | $267,000 | Low, 4.0% under the second |
| 10 DEC 2025 | R-42808-A | Vincennes | ROAD RECONSTRUCTION | 2 of 4 | $5,795,000 | +3.0% |
| 13 NOV 2025 | B-44004-A | Vincennes | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 6 | $1,860,000 | +9.0% |
| 08 OCT 2025 | B-43237-A | Vincennes | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | 3 of 4 | $757,000 | +11% |
| 10 SEP 2025 | R-43985-A | Vincennes | SLIDE CORRECTION | 1 of 10 | $796,500 | Low, 3.0% under the second |
| 17 MAY 2025 | R-46176-A | Vincennes | SLIDE CORRECTION | 2 of 3 | $224,285 | +21% |
| 07 MAY 2025 | B-44985-B | Vincennes | BRIDGE REPLACEMENT AND SLIDE CORRECTION | 3 of 5 | $5,590,000 | +9.0% |
| 12 MAR 2025 | R-40551-A | Vincennes | SMALL STRUCTURE REPLACEMENT AND REPLACE SUPERSTRUCTURE | 1 of 4 | $5,296,500 | Low, 3.0% under the second |
| 12 FEB 2025 | R-41469-A | Vincennes | SMALL STRUCTURE REPLACEMENT AND SLIDE CORRECTION | 6 of 7 | $2,971,000 | +39% |
| 12 FEB 2025 | R-43234-A | Vincennes | SMALL STRUCTURE REPLACEMENT | 3 of 8 | $586,000 | +8.0% |
| 14 NOV 2024 | R-42005-A | Vincennes | ROAD RECONSTRUCTION | 2 of 6 | $5,043,000 | +1.0% |
| 09 OCT 2024 | R-44971-A | Vincennes | SLIDE CORRECTION | 7 of 7 | $668,100 | +35% |
| 11 SEP 2024 | R-45319-A | Seymour | SMALL STRUCTURE REPLACEMENT | 5 of 5 | $326,600 | +56% |
| 09 MAY 2024 | R-41450-A | Vincennes | SLIDE CORRECTION AND SMALL STRUCTURE REPLACEMENT | 4 of 7 | $1,008,000 | +41% |
| 18 JAN 2024 | B-42196-A | Vincennes | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 2 of 2 | $2,653,981 | +1.0% |
| 13 DEC 2023 | R-40417-A | Seymour | SMALL STRUCTURE REPLACEMENT | 1 of 5 | $1,789,100 | Low, 9.0% under the second |
| 13 DEC 2023 | B-44033-A | Vincennes | DEBRIS REMOVAL FROM CHANNEL AND SCOUR PROTECTION | 1 of 4 | $505,000 | Low, 55% under the second |
| 15 MAR 2023 | R-41408-A | Vincennes | SLIDE CORRECTION | 3 of 5 | $545,999 | +13% |
| 19 JAN 2023 | R-40888-A | Seymour | NEW ROAD AND BRIDGE CONSTRUCTION | 1 of 3 | $13,641,000 | Low, 22% under the second |
| 16 NOV 2022 | R-44035-A | Vincennes | DRAINAGE DITCH CORRECTION, SMALL STRUCTURE AND DRAINS CONSTR | 3 of 4 | $2,052,000 | +7.0% |
| 05 MAY 2022 | R-43212-A | Vincennes | DRAINAGE DITCH CORRECTION | 1 of 2 | $1,236,000 | Low, 7.0% under the second |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.