INDOT contract R-41469-A bid tabulation
SMALL STRUCTURE REPLACEMENT AND SLIDE CORRECTION. Let by Indiana DOT on February 12, 2025, Lawrence, Vincennes. 7 bids received; low bid $2,139,248 by Crider & Crider Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 110
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crider & Crider Inc | $2,139,248 | Low |
| 2 | Milestone Contractors LP | $2,336,136 | +9.0% |
| 3 | Ragle, Inc. | $2,445,867 | +14% |
| 4 | Force Construction Co Inc | $2,682,911 | +25% |
| 5 | E & B Paving LLC | $2,924,429 | +37% |
| 6 | Lutgring Brothers Inc | $2,971,000 | +39% |
| 7 | Morphey Construction Inc. | $3,160,000 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crider & Crider Inc | 2. Milestone Contractors LP | 3. Ragle, Inc. | 4. Force Construction Co Inc | 5. E & B Paving LLC | 6. Lutgring Brothers Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $47,639 | $33,000 | $40,000 | $54,890 | $39,900 | $61,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $69,388 | $115,000 | $121,500 | $130,000 | $145,000 | $138,601 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $100,046 | $82,000 | $95,688 | $80,150 | $109,110 | $85,000 |
| 0012 | Headwall, remove (202-02271) | EACH | 1 | $1,830.00 | $1,300.00 | $350.00 | $2,221.00 | $1,225.00 | $1,300.00 |
| 0013 | Present structure, remove, structure no. CV 058-047-86.41 (202-51330) | LS | 1 | $6,684.00 | $5,500.00 | $15,000 | $13,330 | $3,200.00 | $6,000.00 |
| 0014 | Present structure, remove, structure no. CV 058-047-86.77 (202-51330) | LS | 1 | $6,243.00 | $7,000.00 | $15,000 | $10,410 | $6,300.00 | $9,000.00 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 6 | $419.00 | $350.00 | $350.00 | $367.00 | $440.00 | $350.00 |
| 0016 | Pipe, remove (202-96133) | LFT | 67 | $77.00 | $75.00 | $121.00 | $213.00 | $63.00 | $40.00 |
| 0017 | Fence, farm field, remove (202-99187) | LFT | 1,125 | $4.00 | $3.00 | $3.00 | $3.20 | $4.50 | $3.00 |
| 0018 | Excavation, common (203-02000) | CYS | 1,925 | $53.00 | $50.00 | $50.00 | $52.00 | $89.00 | $56.00 |
| 0019 | Excavation, rock (203-02010) | CYS | 16 | $162.00 | $250.00 | $130.00 | $225.00 | $295.00 | $220.00 |
| 0020 | Excavation, unclassified (203-02020) | CYS | 855 | $66.00 | $50.00 | $45.00 | $74.00 | $67.00 | $56.00 |
| 0021 | Borrow (203-02070) | CYS | 588 | $23.00 | $45.00 | $1.00 | $47.00 | $45.00 | $79.00 |
| 0022 | Pump around (205-11626) | EACH | 12 | $5,000.00 | $9,500.00 | $6,000.00 | $16,610 | $8,750.00 | $12,000 |
| 0023 | Stormwater management budget (205-12108) | DOL | 58,495 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $14,320 | $25,000 | $10,000 | $25,180 | $42,000 | $25,000 |
| 0025 | SWQCP preparation (205-12618) | LS | 1 | $4,359.00 | $3,000.00 | $5,000.00 | $5,245.00 | $3,250.00 | $12,000 |
| 0026 | Excavation, foundation, unclassified (206-51230) | CYS | 215 | $46.00 | $125.00 | $100.00 | $102.00 | $122.00 | $124.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 3,072 | $31.00 | $28.00 | $33.00 | $31.00 | $42.00 | $49.00 |
| 0028 | B borrow (211-02050) | CYS | 125 | $60.00 | $99.00 | $65.00 | $52.00 | $93.00 | $99.00 |
| 0029 | Structure backfill, type 1 (211-09264) | CYS | 187 | $60.00 | $115.00 | $45.00 | $48.00 | $176.75 | $70.00 |
| 0030 | Structure backfill, type 2 (211-09265) | CYS | 630 | $60.00 | $90.00 | $50.00 | $76.00 | $119.00 | $62.00 |
| 0031 | Structure backfill, type 5 (211-09268) | CYS | 147 | $189.00 | $199.00 | $350.00 | $174.00 | $177.00 | $200.00 |
| 0032 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,318 | $3.00 | $4.00 | $4.00 | $3.70 | $2.90 | $8.00 |
| 0033 | Geotextile for moisture management, type 1MA (214-12927) | SYS | 1,670 | $5.00 | $10.50 | $5.50 | $11.00 | $5.80 | $16.00 |
| 0034 | Compacted aggregate, no. 2 (301-12231) | CYS | 506 | $77.00 | $89.00 | $75.00 | $61.00 | $84.00 | $120.00 |
| 0035 | Compacted aggregate, no. 8 (301-12233) | CYS | 110.70 | $102.00 | $95.00 | $54.00 | $64.00 | $182.00 | $300.00 |
| 0036 | Compacted aggregate, no. 53 (301-12234) | CYS | 53 | $75.00 | $149.00 | $100.00 | $65.00 | $81.00 | $146.00 |
| 0037 | Compacted aggregate, no. 53 (303-01180) | TON | 1,271 | $39.00 | $35.00 | $40.00 | $42.00 | $48.00 | $59.00 |
| 0038 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 4,470 | $6.00 | $3.50 | $6.00 | $6.00 | $7.00 | $7.50 |
| 0039 | Milling, transition (306-08043) | SYS | 471 | $9.00 | $9.00 | $7.00 | $6.00 | $7.00 | $14.00 |
| 0040 | Milling, profile (306-11872) | SYS | 298 | $9.00 | $12.00 | $5.50 | $5.90 | $7.00 | $14.00 |
| 0041 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 631 | $125.00 | $115.00 | $115.00 | $121.00 | $162.00 | $115.00 |
| 0043 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 357 | $120.00 | $110.00 | $110.00 | $115.00 | $189.00 | $110.00 |
| 0044 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 332 | $114.00 | $105.00 | $105.00 | $110.00 | $137.00 | $105.00 |
| 0045 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 515 | $114.00 | $105.00 | $105.00 | $110.00 | $157.00 | $105.00 |
| 0046 | Joint adhesive, surface (401-10258) | LFT | 3,251 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.00 |
| 0047 | Joint adhesive, intermediate (401-10259) | LFT | 1,828 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.00 |
| 0048 | Liquid asphalt sealant (401-11785) | LFT | 3,256 | $1.00 | $1.00 | $1.00 | $1.10 | $0.05 | $1.00 |
| 0049 | HMA wedge and level, type B (402-07451) | TON | 27 | $218.00 | $200.00 | $200.00 | $210.00 | $161.00 | $200.00 |
| 0050 | Asphalt for tack coat (406-05520) | TON | 5.90 | $1,308.00 | $1,200.00 | $1,200.00 | $1,259.00 | $650.00 | $1,200.00 |
| 0051 | Cracks in asphalt pavement, fill (408-12028) | TON | 0.10 | $436.00 | $4,000.00 | $1,800.00 | $1,574.00 | $500.00 | $4,000.00 |
| 0052 | Guardrail terminal system, W-beam curved, type 6 (601-01839) | EACH | 1 | $3,051.00 | $2,975.00 | $2,975.00 | $3,121.00 | $3,150.00 | $2,975.00 |
| 0053 | Guardrail, remove (601-02241) | LFT | 617 | $7.00 | $6.00 | $6.00 | $6.30 | $11.35 | $6.00 |
| 0054 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 275 | $22.00 | $19.00 | $19.00 | $20.00 | $22.00 | $19.00 |
| 0055 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $981.00 | $875.00 | $875.00 | $918.00 | $1,000.00 | $875.00 |
| 0056 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,378.00 | $3,200.00 | $3,200.00 | $3,357.00 | $3,200.00 | $3,200.00 |
| 0057 | Fence, farm field, 47 in. (603-06040) | LFT | 345 | $33.00 | $18.00 | $18.00 | $19.00 | $23.00 | $18.00 |
| 0058 | Temporary fence (603-97461) | LFT | 826 | $17.00 | $18.00 | $18.00 | $19.00 | $14.50 | $18.00 |
| 0059 | Right-of-way marker (615-06490) | EACH | 41 | $192.00 | $225.00 | $225.00 | $236.00 | $250.00 | $275.00 |
| 0060 | Monument, type B (615-06505) | EACH | 6 | $1,090.00 | $890.00 | $890.00 | $934.00 | $1,100.00 | $1,240.00 |
| 0061 | Riprap, class 1 (616-05688) | TON | 3,469 | $73.00 | $70.00 | $80.00 | $91.00 | $109.00 | $100.00 |
| 0062 | Riprap, class 2 (616-05689) | TON | 55.60 | $67.00 | $90.00 | $100.00 | $103.00 | $165.00 | $189.00 |
| 0063 | Riprap, revetment (616-06405) | TON | 267.90 | $58.00 | $89.00 | $80.00 | $86.00 | $123.00 | $122.00 |
| 0064 | Riprap, uniform (616-06451) | TON | 644.50 | $59.00 | $70.00 | $62.00 | $27.00 | $107.00 | $59.00 |
| 0065 | Riprap, grouted, 24 in. (616-11928) | SYS | 590 | $123.00 | $110.00 | $122.00 | $134.00 | $215.00 | $215.00 |
| 0066 | Geotextile for riprap, type 1A (616-12246) | SYS | 444 | $2.00 | $2.00 | $2.50 | $2.50 | $3.85 | $7.00 |
| 0067 | Geotextile for riprap, type 2A (616-12248) | SYS | 100 | $9.00 | $7.00 | $4.00 | $8.70 | $4.35 | $12.00 |
| 0068 | Geotextile for riprap, type 2B (616-12249) | SYS | 1,587 | $3.00 | $4.50 | $5.00 | $2.80 | $4.75 | $7.00 |
| 0069 | Geotextile for riprap, type 3 (616-12251) | SYS | 3,815 | $4.00 | $3.00 | $4.00 | $3.40 | $5.25 | $7.00 |
| 0070 | Mobilization and demobilization for seeding (621-01004) | EACH | 10 | $218.00 | $200.00 | $200.00 | $210.00 | $200.00 | $1,182.52 |
| 0071 | Erosion control blanket (621-02770) | SYS | 789 | $4.00 | $3.25 | $3.25 | $3.40 | $3.25 | $3.20 |
| 0072 | Mulched seeding, type R (621-06559) | SYS | 5,721 | $5.00 | $4.25 | $4.25 | $4.50 | $4.25 | $3.84 |
| 0073 | Mulching material (621-06565) | TON | 0.30 | $1,417.00 | $1,300.00 | $1,300.00 | $1,364.00 | $1,300.00 | $9,455.00 |
| 0074 | Water (621-06567) | KGAL | 2 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 | $1.00 |
| 0075 | Sodding (621-06574) | SYS | 561 | $11.00 | $15.50 | $13.50 | $10.00 | $10.00 | $23.50 |
| 0076 | Seed mixture, floodplain (621-12612) | LBS | 8.60 | $512.00 | $470.00 | $470.00 | $493.00 | $470.00 | $192.00 |
| 0077 | Computer system equipment (628-11976) | EACH | 3 | $1,139.00 | $1,200.00 | $1,000.00 | $2,098.00 | $600.00 | $1,200.00 |
| 0078 | Field office, type D (628-12683) | MOS | 14 | $2,222.00 | $2,200.00 | $2,800.00 | $4,490.00 | $3,100.00 | $2,900.00 |
| 0079 | Waterproofing membrane type 2 (714-000086) | SFT | 5,122 | $3.00 | $2.50 | $3.25 | $4.30 | $3.00 | $5.50 |
| 0080 | Structure, reinforced concrete, box sections, 6 FT X 6 FT (714-11176) | LFT | 50 | $1,227.00 | $1,800.00 | $2,800.00 | $1,239.00 | $2,000.00 | $2,852.00 |
| 0081 | Structure, reinforced concrete, box sections, 12 FT X 6 FT (714-11187) | LFT | 90 | $1,675.00 | $2,100.00 | $2,600.00 | $1,737.00 | $2,235.00 | $2,765.00 |
| 0082 | Structure, reinforced concrete, box sections, 5 FT X 4 FT (714-11191) | LFT | 47 | $1,065.00 | $1,100.00 | $1,500.00 | $698.00 | $965.00 | $1,493.00 |
| 0083 | Safety metal end section, 4:1, diameter 12 in. (715-04611) | EACH | 4 | $1,731.00 | $1,400.00 | $1,000.00 | $1,553.00 | $900.00 | $1,450.00 |
| 0084 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 54 | $184.00 | $120.00 | $220.00 | $173.00 | $250.00 | $325.00 |
| 0085 | Pipe, type 1, circular, diameter 60 in. (715-05133) | LFT | 86 | $409.00 | $250.00 | $426.00 | $193.00 | $440.00 | $485.00 |
| 0086 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 109 | $69.00 | $68.00 | $75.00 | $79.00 | $72.00 | $74.00 |
| 0087 | Pipe extension, circular, diameter 18 in. , CMP (715-05596) | LFT | 6 | $573.00 | $350.00 | $145.00 | $282.00 | $268.00 | $460.00 |
| 0088 | Pipe extension, circular, diameter 24 in. , CMP (715-05597) | LFT | 7 | $569.00 | $550.00 | $188.00 | $359.00 | $269.00 | $520.00 |
| 0089 | Concrete anchor, diameter 60 in. (715-05841) | EACH | 2 | $2,606.00 | $7,500.00 | $1,686.00 | $4,502.00 | $4,800.00 | $5,000.00 |
| 0090 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $918.00 | $650.00 | $1,500.00 | $825.00 | $585.00 | $1,200.00 |
| 0091 | Pipe end section, diameter 24 in. (715-46020) | EACH | 1 | $999.00 | $750.00 | $2,540.00 | $909.00 | $875.00 | $1,300.00 |
| 0092 | Pipe end section, diameter 36 in. (715-46040) | EACH | 2 | $2,312.00 | $2,600.00 | $2,266.00 | $2,189.00 | $1,975.00 | $3,050.00 |
| 0093 | Road closure sign assembly (801-04308) | EACH | 22 | $136.00 | $267.00 | $125.00 | $166.00 | $267.00 | $267.00 |
| 0094 | Temporary pavement marking, 4 in. (801-06203) | LFT | 5,400 | $0.40 | $0.35 | $0.40 | $1.30 | $0.90 | $0.34 |
| 0095 | Detour route marker assembly (801-06625) | EACH | 137 | $82.00 | $168.00 | $75.00 | $145.00 | $168.00 | $168.00 |
| 0096 | Construction sign, type A (801-06640) | EACH | 92 | $163.00 | $234.00 | $150.00 | $320.00 | $234.00 | $234.00 |
| 0097 | Construction sign, type B (801-06645) | EACH | 7 | $82.00 | $114.00 | $75.00 | $56.00 | $114.00 | $114.00 |
| 0098 | Maintaining traffic (801-06775) | LS | 1 | $23,299 | $59,500 | $80,000 | $205,000 | $21,000 | $27,000 |
| 0099 | Barricade, type III-A (801-07118) | LFT | 188 | $11.00 | $16.00 | $10.00 | $8.40 | $15.91 | $15.91 |
| 0100 | Barricade, type III-B (801-07119) | LFT | 464 | $11.00 | $16.00 | $10.00 | $9.40 | $15.91 | $15.91 |
| 0101 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 338 | $25.00 | $34.00 | $34.00 | $36.00 | $26.50 | $34.00 |
| 0102 | Sign, sheet, and supports, remove (802-07059) | EACH | 21 | $62.00 | $42.00 | $42.00 | $44.00 | $46.00 | $42.00 |
| 0103 | Sign, sheet, relocate (802-07060) | EACH | 15 | $354.00 | $375.00 | $375.00 | $393.00 | $200.00 | $375.00 |
| 0104 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 54 | $39.00 | $18.00 | $18.00 | $19.00 | $48.00 | $18.00 |
| 0105 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 27.12 | $44.00 | $25.00 | $25.00 | $26.00 | $50.00 | $25.00 |
| 0106 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 800 | $1.00 | $1.00 | $0.75 | $1.50 | $0.88 | $0.88 |
| 0107 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 800 | $1.00 | $1.00 | $0.75 | $0.70 | $0.88 | $0.88 |
| 0108 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 4,969 | $1.00 | $0.50 | $0.75 | $1.40 | $0.42 | $0.42 |
| 0109 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 4,969 | $1.00 | $0.50 | $0.75 | $1.30 | $0.42 | $0.42 |
| 0110 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 61 | $27.00 | $30.00 | $45.97 | $262.00 | $10.00 | $15.00 |
| 0111 | Snowplowable raised pavement marker (808-75998) | EACH | 61 | $82.00 | $58.00 | $99.59 | $210.00 | $58.00 | $58.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.