INDOT contract R-41469-A bid tabulation

SMALL STRUCTURE REPLACEMENT AND SLIDE CORRECTION. Let by Indiana DOT on February 12, 2025, Lawrence, Vincennes. 7 bids received; low bid $2,139,248 by Crider & Crider Inc.

Owner
Indiana DOT
Letting
12 FEB 2025
Pay items
110
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Crider & Crider Inc$2,139,248Low
2Milestone Contractors LP$2,336,136+9.0%
3Ragle, Inc.$2,445,867+14%
4Force Construction Co Inc$2,682,911+25%
5E & B Paving LLC$2,924,429+37%
6Lutgring Brothers Inc$2,971,000+39%
7Morphey Construction Inc.$3,160,000+48%
INDOT contract R-41469-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Crider & Crider Inc2. Milestone Contractors LP3. Ragle, Inc.4. Force Construction Co Inc5. E & B Paving LLC6. Lutgring Brothers Inc
0001Construction engineering (105-06845)LS1$47,639$33,000$40,000$54,890$39,900$61,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$69,388$115,000$121,500$130,000$145,000$138,601
0011Clearing right-of-way (201-52370)LS1$100,046$82,000$95,688$80,150$109,110$85,000
0012Headwall, remove (202-02271)EACH1$1,830.00$1,300.00$350.00$2,221.00$1,225.00$1,300.00
0013Present structure, remove, structure no. CV 058-047-86.41 (202-51330)LS1$6,684.00$5,500.00$15,000$13,330$3,200.00$6,000.00
0014Present structure, remove, structure no. CV 058-047-86.77 (202-51330)LS1$6,243.00$7,000.00$15,000$10,410$6,300.00$9,000.00
0015Guardrail end treatment, remove (202-93741)EACH6$419.00$350.00$350.00$367.00$440.00$350.00
0016Pipe, remove (202-96133)LFT67$77.00$75.00$121.00$213.00$63.00$40.00
0017Fence, farm field, remove (202-99187)LFT1,125$4.00$3.00$3.00$3.20$4.50$3.00
0018Excavation, common (203-02000)CYS1,925$53.00$50.00$50.00$52.00$89.00$56.00
0019Excavation, rock (203-02010)CYS16$162.00$250.00$130.00$225.00$295.00$220.00
0020Excavation, unclassified (203-02020)CYS855$66.00$50.00$45.00$74.00$67.00$56.00
0021Borrow (203-02070)CYS588$23.00$45.00$1.00$47.00$45.00$79.00
0022Pump around (205-11626)EACH12$5,000.00$9,500.00$6,000.00$16,610$8,750.00$12,000
0023Stormwater management budget (205-12108)DOL58,495$1.00$1.00$1.00$1.00$1.00$1.00
0024Stormwater management implementation (205-12616)LS1$14,320$25,000$10,000$25,180$42,000$25,000
0025SWQCP preparation (205-12618)LS1$4,359.00$3,000.00$5,000.00$5,245.00$3,250.00$12,000
0026Excavation, foundation, unclassified (206-51230)CYS215$46.00$125.00$100.00$102.00$122.00$124.00
0027Subgrade treatment, type IC (207-09935)SYS3,072$31.00$28.00$33.00$31.00$42.00$49.00
0028B borrow (211-02050)CYS125$60.00$99.00$65.00$52.00$93.00$99.00
0029Structure backfill, type 1 (211-09264)CYS187$60.00$115.00$45.00$48.00$176.75$70.00
0030Structure backfill, type 2 (211-09265)CYS630$60.00$90.00$50.00$76.00$119.00$62.00
0031Structure backfill, type 5 (211-09268)CYS147$189.00$199.00$350.00$174.00$177.00$200.00
0032Geotextile for pavement, type 2B (214-12239)SYS1,318$3.00$4.00$4.00$3.70$2.90$8.00
0033Geotextile for moisture management, type 1MA (214-12927)SYS1,670$5.00$10.50$5.50$11.00$5.80$16.00
0034Compacted aggregate, no. 2 (301-12231)CYS506$77.00$89.00$75.00$61.00$84.00$120.00
0035Compacted aggregate, no. 8 (301-12233)CYS110.70$102.00$95.00$54.00$64.00$182.00$300.00
0036Compacted aggregate, no. 53 (301-12234)CYS53$75.00$149.00$100.00$65.00$81.00$146.00
0037Compacted aggregate, no. 53 (303-01180)TON1,271$39.00$35.00$40.00$42.00$48.00$59.00
0038Milling, asphalt, 1 1/2 in. (306-08034)SYS4,470$6.00$3.50$6.00$6.00$7.00$7.50
0039Milling, transition (306-08043)SYS471$9.00$9.00$7.00$6.00$7.00$14.00
0040Milling, profile (306-11872)SYS298$9.00$12.00$5.50$5.90$7.00$14.00
0041QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON631$125.00$115.00$115.00$121.00$162.00$115.00
0043QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON357$120.00$110.00$110.00$115.00$189.00$110.00
0044QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON332$114.00$105.00$105.00$110.00$137.00$105.00
0045QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053)TON515$114.00$105.00$105.00$110.00$157.00$105.00
0046Joint adhesive, surface (401-10258)LFT3,251$1.00$1.00$1.00$1.10$1.00$1.00
0047Joint adhesive, intermediate (401-10259)LFT1,828$1.00$1.00$1.00$1.10$1.00$1.00
0048Liquid asphalt sealant (401-11785)LFT3,256$1.00$1.00$1.00$1.10$0.05$1.00
0049HMA wedge and level, type B (402-07451)TON27$218.00$200.00$200.00$210.00$161.00$200.00
0050Asphalt for tack coat (406-05520)TON5.90$1,308.00$1,200.00$1,200.00$1,259.00$650.00$1,200.00
0051Cracks in asphalt pavement, fill (408-12028)TON0.10$436.00$4,000.00$1,800.00$1,574.00$500.00$4,000.00
0052Guardrail terminal system, W-beam curved, type 6 (601-01839)EACH1$3,051.00$2,975.00$2,975.00$3,121.00$3,150.00$2,975.00
0053Guardrail, remove (601-02241)LFT617$7.00$6.00$6.00$6.30$11.35$6.00
0054Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT275$22.00$19.00$19.00$20.00$22.00$19.00
0055Guardrail height transition, MGS (601-12289)EACH1$981.00$875.00$875.00$918.00$1,000.00$875.00
0056Guardrail end treatment, type OS (601-94689)EACH3$3,378.00$3,200.00$3,200.00$3,357.00$3,200.00$3,200.00
0057Fence, farm field, 47 in. (603-06040)LFT345$33.00$18.00$18.00$19.00$23.00$18.00
0058Temporary fence (603-97461)LFT826$17.00$18.00$18.00$19.00$14.50$18.00
0059Right-of-way marker (615-06490)EACH41$192.00$225.00$225.00$236.00$250.00$275.00
0060Monument, type B (615-06505)EACH6$1,090.00$890.00$890.00$934.00$1,100.00$1,240.00
0061Riprap, class 1 (616-05688)TON3,469$73.00$70.00$80.00$91.00$109.00$100.00
0062Riprap, class 2 (616-05689)TON55.60$67.00$90.00$100.00$103.00$165.00$189.00
0063Riprap, revetment (616-06405)TON267.90$58.00$89.00$80.00$86.00$123.00$122.00
0064Riprap, uniform (616-06451)TON644.50$59.00$70.00$62.00$27.00$107.00$59.00
0065Riprap, grouted, 24 in. (616-11928)SYS590$123.00$110.00$122.00$134.00$215.00$215.00
0066Geotextile for riprap, type 1A (616-12246)SYS444$2.00$2.00$2.50$2.50$3.85$7.00
0067Geotextile for riprap, type 2A (616-12248)SYS100$9.00$7.00$4.00$8.70$4.35$12.00
0068Geotextile for riprap, type 2B (616-12249)SYS1,587$3.00$4.50$5.00$2.80$4.75$7.00
0069Geotextile for riprap, type 3 (616-12251)SYS3,815$4.00$3.00$4.00$3.40$5.25$7.00
0070Mobilization and demobilization for seeding (621-01004)EACH10$218.00$200.00$200.00$210.00$200.00$1,182.52
0071Erosion control blanket (621-02770)SYS789$4.00$3.25$3.25$3.40$3.25$3.20
0072Mulched seeding, type R (621-06559)SYS5,721$5.00$4.25$4.25$4.50$4.25$3.84
0073Mulching material (621-06565)TON0.30$1,417.00$1,300.00$1,300.00$1,364.00$1,300.00$9,455.00
0074Water (621-06567)KGAL2$0.25$0.25$0.25$0.25$0.25$1.00
0075Sodding (621-06574)SYS561$11.00$15.50$13.50$10.00$10.00$23.50
0076Seed mixture, floodplain (621-12612)LBS8.60$512.00$470.00$470.00$493.00$470.00$192.00
0077Computer system equipment (628-11976)EACH3$1,139.00$1,200.00$1,000.00$2,098.00$600.00$1,200.00
0078Field office, type D (628-12683)MOS14$2,222.00$2,200.00$2,800.00$4,490.00$3,100.00$2,900.00
0079Waterproofing membrane type 2 (714-000086)SFT5,122$3.00$2.50$3.25$4.30$3.00$5.50
0080Structure, reinforced concrete, box sections, 6 FT X 6 FT (714-11176)LFT50$1,227.00$1,800.00$2,800.00$1,239.00$2,000.00$2,852.00
0081Structure, reinforced concrete, box sections, 12 FT X 6 FT (714-11187)LFT90$1,675.00$2,100.00$2,600.00$1,737.00$2,235.00$2,765.00
0082Structure, reinforced concrete, box sections, 5 FT X 4 FT (714-11191)LFT47$1,065.00$1,100.00$1,500.00$698.00$965.00$1,493.00
0083Safety metal end section, 4:1, diameter 12 in. (715-04611)EACH4$1,731.00$1,400.00$1,000.00$1,553.00$900.00$1,450.00
0084Pipe, type 1, circular, diameter 36 in. (715-05019)LFT54$184.00$120.00$220.00$173.00$250.00$325.00
0085Pipe, type 1, circular, diameter 60 in. (715-05133)LFT86$409.00$250.00$426.00$193.00$440.00$485.00
0086Pipe, type 3, circular, diameter 12 in. (715-05168)LFT109$69.00$68.00$75.00$79.00$72.00$74.00
0087Pipe extension, circular, diameter 18 in. , CMP (715-05596)LFT6$573.00$350.00$145.00$282.00$268.00$460.00
0088Pipe extension, circular, diameter 24 in. , CMP (715-05597)LFT7$569.00$550.00$188.00$359.00$269.00$520.00
0089Concrete anchor, diameter 60 in. (715-05841)EACH2$2,606.00$7,500.00$1,686.00$4,502.00$4,800.00$5,000.00
0090Pipe end section, diameter 18 in. (715-46010)EACH1$918.00$650.00$1,500.00$825.00$585.00$1,200.00
0091Pipe end section, diameter 24 in. (715-46020)EACH1$999.00$750.00$2,540.00$909.00$875.00$1,300.00
0092Pipe end section, diameter 36 in. (715-46040)EACH2$2,312.00$2,600.00$2,266.00$2,189.00$1,975.00$3,050.00
0093Road closure sign assembly (801-04308)EACH22$136.00$267.00$125.00$166.00$267.00$267.00
0094Temporary pavement marking, 4 in. (801-06203)LFT5,400$0.40$0.35$0.40$1.30$0.90$0.34
0095Detour route marker assembly (801-06625)EACH137$82.00$168.00$75.00$145.00$168.00$168.00
0096Construction sign, type A (801-06640)EACH92$163.00$234.00$150.00$320.00$234.00$234.00
0097Construction sign, type B (801-06645)EACH7$82.00$114.00$75.00$56.00$114.00$114.00
0098Maintaining traffic (801-06775)LS1$23,299$59,500$80,000$205,000$21,000$27,000
0099Barricade, type III-A (801-07118)LFT188$11.00$16.00$10.00$8.40$15.91$15.91
0100Barricade, type III-B (801-07119)LFT464$11.00$16.00$10.00$9.40$15.91$15.91
0101Sign post, square, type 1, reinforced anchor base (802-05701)LFT338$25.00$34.00$34.00$36.00$26.50$34.00
0102Sign, sheet, and supports, remove (802-07059)EACH21$62.00$42.00$42.00$44.00$46.00$42.00
0103Sign, sheet, relocate (802-07060)EACH15$354.00$375.00$375.00$393.00$200.00$375.00
0104Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT54$39.00$18.00$18.00$19.00$48.00$18.00
0105Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT27.12$44.00$25.00$25.00$26.00$50.00$25.00
0106Line, paint, solid, white, 4 in. (808-06713)LFT800$1.00$1.00$0.75$1.50$0.88$0.88
0107Line, paint, solid, yellow, 4 in. (808-06714)LFT800$1.00$1.00$0.75$0.70$0.88$0.88
0108Line, paint, solid, white, 6 in. (808-75007)LFT4,969$1.00$0.50$0.75$1.40$0.42$0.42
0109Line, paint, solid, yellow, 6 in. (808-75047)LFT4,969$1.00$0.50$0.75$1.30$0.42$0.42
0110Snowplowable raised pavement marker, remove (808-75996)EACH61$27.00$30.00$45.97$262.00$10.00$15.00
0111Snowplowable raised pavement marker (808-75998)EACH61$82.00$58.00$99.59$210.00$58.00$58.00
INDOT contract R-41469-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy