INDOT contract R-45152-A bid tabulation

PAVEMENT REPLACEMENT, INTERSECTION IMPROVEMENT AND ADA RAMPS. Let by Indiana DOT on February 11, 2026, Vanderburgh, Vincennes. 3 bids received; low bid $35,061,686 by Ragle, Inc/E & B Paving LLC J/V.

Owner
Indiana DOT
Letting
11 FEB 2026
Pay items
317
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ragle, Inc/E & B Paving LLC J/V$35,061,686Low
2Jbi Construction Inc$35,829,903+2.0%
3Blankenberger Brothers Inc$39,508,500+13%
INDOT contract R-45152-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ragle, Inc/E & B Paving LLC J/V2. Jbi Construction Inc3. Blankenberger Brothers Inc
0001Construction engineering (105-06845)LS1$902,500$475,000$487,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00
0005Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00
0009Quality adjustments, pavement traffic markings (109-09377)DOL1$1.00$1.00$1.00
0010Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00
0011Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00
0012Mobilization and demobilization (110-01001)LS1$1,753,000$1,790,000$1,975,000
0013Clearing right-of-way (201-52370)LS1$1,050,000$950,000$1,185,000
0014Pavement removal (202-02240)SYS69,078$13.50$13.00$11.25
0015Remove , waterline valve vault (202-06541)EACH4$4,500.00$4,500.00$6,100.00
0016Present structure, remove portions, structure no. 1 (202-51328)LS1$5,000.00$7,500.00$7,500.00
0017Inlet, remove (202-91385)EACH103$105.00$450.00$700.00
0018Manhole, remove (202-93047)EACH21$200.00$1,500.00$1,600.00
0019Guardrail end treatment, remove (202-93741)EACH3$450.00$450.00$400.00
0020Signal pole foundation, remove (202-93995)EACH8$1,500.00$1,500.00$1,000.00
0021Barrier wall, concrete, remove (202-94954)LFT103$60.00$45.00$65.00
0022Impact attenuator, remove (202-95027)EACH2$1,207.00$1,207.00$1,150.00
0023Pipe, remove (202-96133)LFT17,812$12.75$19.00$29.00
0024Fire hydrant assembly, remove (202-97009)EACH5$750.00$1,070.00$1,500.00
0025Excavation, common (203-02000)CYS34,444$35.00$33.00$39.50
0026Excavation, rock (203-02010)CYS4,838$35.00$39.00$41.00
0027Stormwater management budget (205-12108)DOL135,548.22$1.00$1.00$1.00
0028Stormwater management implementation (205-12616)LS1$100,000$95,500$40,000
0029SWQCP preparation (205-12618)LS1$2,000.00$5,000.00$20,000
0030Subgrade treatment, type II (207-08264)SYS1,874$45.00$28.00$30.50
0031Subgrade treatment, type IC (207-09935)SYS18,677$42.50$39.00$39.50
0032Subgrade treatment, type ibc (207-12635)SYS77,967$15.00$16.50$15.00
0033B borrow (211-02050)CYS13,442$30.00$56.00$48.00
0034Structure backfill, type 2 (211-09265)CYS13,339.50$60.00$73.00$66.50
0035Structure backfill, type 2 , no.11 only (211-09265)CYS181$78.00$58.00$82.00
0036Structure backfill, type 2 , no.53 only (211-09265)CYS1,762$78.00$76.00$106.75
0037Structure backfill, type 3 (211-09266)CYS3,735$57.25$91.00$82.00
0038Flowable backfill, non- removable (213-09269)CYS60$305.00$543.00$435.00
0039Geogrid, type IB (214-11796)SYS859$3.00$2.50$4.00
0040Geotextile for pavement, type 2A (214-12238)SYS92,265$2.75$2.20$2.80
0041Compacted aggregate, no. 53 (301-12234)CYS13,588$92.50$79.00$89.25
0042Dense graded subbase (302-07455)CYS1,085$125.00$93.00$110.00
0043Compacted aggregate, no. 53 (303-01180)TON231$72.50$45.00$72.80
0044PCC base, 10 in. (305-07458)SYS56$85.00$78.00$200.00
0045Milling, asphalt, 1 1/2 in. (306-08034)SYS18,377$2.95$1.90$1.80
0046Milling, PCCP , 8.5 inch (306-08041)SYS228$26.50$40.00$34.15
0047Milling, asphalt , 11 inch (306-08159)SYS237$25.50$28.00$35.00
0048QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON5,772$130.00$124.00$124.00
0049QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON9,354$104.00$102.00$102.00
0050QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053)TON26,988$93.00$94.00$94.00
0051QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067)TON10,218$92.00$85.00$85.00
0052Joint adhesive (401-11526)LFT69,914$0.50$0.26$0.26
0053Inertial profiler, HMA (401-12169)LS1$9,800.00$7,400.00$7,400.00
0054Void reducing asphalt membrane for HMA (401-12439)LFT47,292$2.50$3.75$3.75
0055HMA wedge and level, type C (402-07452)TON1,401$108.00$135.00$135.00
0056HMA for temporary pavement, type C (402-10086)TON2,709$85.00$156.00$160.00
0057Asphalt for tack coat (406-05520)TON81.50$680.00$715.00$715.00
0058QC/QA-PCCP, 10 in. (501-06321)SYS661$110.00$103.00$103.00
0059QC/QA-PCCP, 10.5 in. (501-08193)SYS968$120.00$105.00$105.00
0060QC/QA-PCCP, 9 in. (501-09107)SYS3,059$110.00$88.00$88.00
0061QC/QA-PCCP, 8 in. (501-09606)SYS2,160$95.00$85.50$85.50
0062PCCP, 7 in. (502-11564)SYS47$85.00$82.00$107.65
0063Retrofitted tie bars (503-03489)EACH210$15.25$17.00$25.00
0064D-1 contraction joint (503-05240)LFT8,144$15.25$6.00$11.25
0065Guardrail, remove (601-02241)LFT2,198$7.00$5.50$7.00
0066Impact attenuator, CR1- W1, TL-3 (601-09149)EACH1$34,500$46,000$34,500
0067Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT4,193.75$24.00$20.50$24.00
0068Guardrail height transition, MGS (601-12289)EACH1$1,100.00$875.00$1,100.00
0069Guardrail transition, MGS with curb (601-12291)EACH4$4,000.00$3,225.00$4,000.00
0070Guardrail transition, MGS without curb (601-12292)EACH1$3,900.00$3,200.00$3,900.00
0071Guardrail, MGS W-beam, cable terminal anchor (601-12294)EACH4$1,350.00$1,155.00$1,350.00
0072Guardrail end treatment, type OS (601-94689)EACH5$3,250.00$2,258.00$3,250.00
0073Concrete barrier , 45 inch (602-01064)LFT4,355$100.00$102.00$102.00
0074Barrier delineator (602-06729)EACH289$10.00$17.00$25.00
0075Concrete barrier, modified section , asymmetric barrier (602-11938)CYS169$1,600.00$825.00$1,800.00
0076Concrete barrier, modified section , median barrier transition (602-11938)CYS15$1,350.00$725.00$2,500.00
0077Handrail, aluminum (604-01268)LFT95$310.00$340.00$310.00
0078Sidewalk, concrete (604-06070)SYS5,179$65.00$51.00$82.40
0079Curb ramp, concrete (604-08086)SYS449$145.00$165.00$310.00
0080Detectable warning surfaces (604-12083)SYS59$225.00$235.00$465.00
0081Steps, concrete (604-44251)CYS18$2,600.00$2,500.00$1,650.00
0082Curb, integral concrete (605-06090)LFT762$26.75$45.00$58.50
0083Curb, concrete (605-06120)LFT107$35.00$45.00$55.55
0084Curb, concrete , modified (605-06120)LFT858$28.00$43.00$57.00
0085Curb, concrete , modified I (605-06120)LFT296$107.00$84.00$70.25
0086Curb, concrete , modified II (605-06120)LFT70$46.50$60.00$82.85
0087Curb and gutter, concrete (605-06140)LFT9,975$30.25$27.50$27.50
0088Curb and gutter, concrete , modified (605-06140)LFT168$37.25$45.00$76.75
0089Curb and gutter, concrete , modified 10 inch thickness (605-06140)LFT219$44.00$45.00$106.50
0090Curb and gutter, concrete , modified 9 inch thickness (605-06140)LFT499$40.00$52.00$80.00
0091Curb and gutter, concrete, type B (605-06145)LFT5,665$26.00$27.50$27.50
0092Curb and gutter, concrete, type B , modified 9 inch thickness (605-06145)LFT153$40.00$53.00$82.00
0093Center curb, concrete, type D , modified (605-06255)SYS1,917$126.00$105.00$165.00
0094Curb and gutter, rolled curb , modified, 9 inch thickness (605-97937)LFT299$37.50$41.00$60.30
0095HMA for approaches, type B (610-07487)TON99$255.00$365.00$365.00
0096HMA for approaches, type C (610-07488)TON461$179.00$195.00$195.00
0097PCCP for approaches, 6 in. (610-08446)SYS397$78.50$79.00$165.00
0098PCCP for approaches, 9 in. (610-09108)SYS859$111.54$90.00$181.00
0099Mailbox assembly, single (611-06497)EACH1$550.00$250.00$550.00
0100Monument, type B (615-06505)EACH9$1,000.00$1,150.00$1,000.00
0101Monument, type D (615-06515)EACH1$350.00$133.00$350.00
0102Riprap, revetment (616-06405)TON1,402$55.00$58.00$90.00
0103Riprap, uniform (616-06451)TON1$210.00$215.00$560.00
0104Geotextile for riprap, type 1A (616-12246)SYS2,282$3.15$1.10$3.60
0105Geotextile for riprap, type 2B (616-12249)SYS1,792$4.75$6.20$5.50
0106Sound barrier panels, wall mounted type 1 (620-01753)SFT9,724$90.00$80.50$81.00
0107Sound barrier panels, ground mounted type 1 (620-01754)SFT17,139$47.50$43.00$45.00
0108Sound barrier erection, wall mounted type 1 (620-01755)SFT9,724$15.00$18.00$20.50
0109Sound barrier erection, ground mounted type 1 (620-01756)SFT17,139$17.00$21.35$23.50
0110Sound barrier design and layout (620-08426)LS1$50,000$24,000$25,000
0111Mobilization and demobilization for seeding (621-01004)EACH8$1,050.00$950.00$1,050.00
0112Seed mixture, type U (621-06554)LBS885$7.75$4.50$7.75
0113Mulching material (621-06565)TON9$480.00$550.00$480.00
0114Water (621-06567)KGAL30$2.00$10.00$2.00
0115Sodding (621-06574)SYS318$10.00$13.00$6.00
0116Sodding, nursery (621-06575)SYS6,819$10.00$11.00$6.00
0117Permanent turf reinforcement mat (621-08161)SYS1,573$7.42$6.30$7.42
0118Computer system equipment (628-11976)EACH5$750.00$575.00$600.00
0119Field office, type E (628-12684)MOS36$5,000.00$4,250.00$4,590.00
0120Topsoil processing and distribution (629-000149)SYS26,898$5.50$9.00$9.60
0121Topsoil amendment budget (629-000150)DOL53,796$1.00$1.00$1.00
0122Vibration monitoring (701-12304)LS1$25,000$85,000$200,000
0123Reinforcing bars, epoxy coated (703-06029)LBS102,933$2.25$1.65$2.25
0124Concrete, C, superstructure (704-51002)CYS1.30$2,500.00$7,300.00$6,050.00
0125Reinforced concrete moment slab, 12 in. (706-08496)SYS1,506$240.00$202.00$230.00
0126Reinforced concrete moment slab, 20 in. (706-09789)SYS623$345.00$315.00$320.00
0127Railing, concrete type FT (706-11601)CYS237$530.00$493.00$493.00
0128Concrete bridge railing transition, type TFT (706-11621)EACH4$1,500.00$4,000.00$3,500.00
0129Temporary support , utility des 2301254 (711-51820)LS1$15,000$7,500.00$25,000
0130Temporary support , utility, des 1900263 (711-51820)LS1$7,500.00$65,000$40,000
0131Gate valve with valve box, 6 in. (715-02744)EACH1$2,100.00$2,124.00$2,700.00
0132Gate valve with valve box, 8 in. (715-02745)EACH1$3,000.00$2,936.00$3,650.00
0133Water service , assembly 1 inch to 0.75 inch, type K copper (715-04596)EACH12$2,900.00$3,315.00$3,400.00
0134Pipe, type 2, circular, diameter 36 in. (715-05024)LFT255$138.00$205.00$195.50
0135Pipe, type 2, circular, diameter 36 in. , C900 (715-05024)LFT186$395.00$340.00$375.55
0136Pipe, type 4, circular, diameter 6 in. (715-05048)LFT16,674$12.75$9.25$12.45
0137Pipe, underdrain outlet, diameter 6 in. (715-05053)LFT287$28.00$30.00$52.50
0138Pipe, type 2, circular, diameter 12 in. (715-05149)LFT9,570$50.00$51.00$78.95
0139Pipe, type 2, circular, diameter 12 in. , C900 (715-05149)LFT1,288$85.50$74.00$105.50
0140Pipe, type 2, circular, diameter 15 in. (715-05151)LFT1,948$63.50$54.00$82.50
0141Pipe, type 2, circular, diameter 15 in. , C900 (715-05151)LFT105$110.00$104.00$130.00
0142Pipe, type 2, circular, diameter 18 in. (715-05152)LFT1,407$67.50$78.00$97.25
0143Pipe, type 2, circular, diameter 24 in. (715-05154)LFT779$83.75$111.00$124.50
0144Pipe, type 2, circular, diameter 30 in. (715-05156)LFT690$136.50$153.00$205.00
0145Pipe, type 2, circular, diameter 30 in. , C900 (715-05156)LFT46$286.50$345.00$335.45
0146Pipe, type 2, circular, diameter 42 in. (715-05159)LFT55$300.00$275.00$643.10
0147Pipe, type 2, circular, diameter 48 in. (715-05161)LFT1,635$220.00$280.00$247.35
0148Pipe, type 2, circular, diameter 60 in. (715-05163)LFT445$445.00$1,140.00$650.00
0149Concrete anchor, diameter 42 in. (715-05842)EACH1$3,025.00$3,200.00$12,000
0150Stormwater treatment system (715-08048)EACH2$25,000$24,000$35,000
0151PCCP for structure installation , 10 inch (715-08283)SYS578$102.50$78.00$90.15
0152HMA for structure installation, type B (715-08305)TON96$300.00$180.00$246.60
0153HMA for structure installation, type C (715-08306)TON577$235.00$210.00$210.00
0154Video inspection for pipe (715-09064)LFT18,527$1.60$1.60$1.60
0155Automatic flushing device , with valve and fittings (715-09811)EACH1$13,650$12,920$14,000
0156Water main, ductile iron, 8 in. , offset assembly (715-11571)LFT27$190.00$404.00$435.00
0157Pipe end section, diameter 12 in. (715-46000)EACH3$685.00$685.00$800.00
0158Pipe end section, diameter 15 in. (715-46005)EACH2$985.00$825.00$1,000.00
0159Pipe end section, diameter 18 in. (715-46010)EACH1$1,100.00$1,030.00$1,200.00
0160Pipe PVC, 6 in. (715-91361)LFT216$22.50$32.00$32.50
0161Water meter relocate (715-91742)EACH3$1,665.00$2,600.00$1,970.00
0162Sewer sanitary lateral reconnect (715-92253)EACH12$8,850.00$5,778.00$6,000.00
0163Water main, 6 in. , C900 (715-93912)LFT17$300.00$291.00$395.00
0164Water main, 8 in. , C900 (715-93913)LFT513$86.00$170.00$125.00
0165Pipe installation, trenchless, 42 in. (716-07636)LFT198$1,650.00$1,890.00$1,800.00
0166Pipe installation, trenchless, 8 in. , restrained joint, directional drilled (716-09129)LFT398$138.50$149.00$185.00
0167Outlet protector, type 2 (718-06529)EACH3$1,650.00$1,825.00$1,850.00
0168Video inspection for underdrain (718-06532)LFT3,000$1.20$1.20$1.20
0169Underdrain cleanout port (718-11685)EACH1$2,800.00$1,800.00$2,500.00
0170Geotextile for underdrains, type 1A (718-12305)SYS13,425$1.70$2.50$1.60
0171Geotextile for underdrains, type 2B (718-12308)SYS647$2.75$4.75$4.80
0172Aggregate for underdrains (718-52610)CYS1,373$75.00$94.00$105.25
0173Pipe, plug existing (720-02442)EACH29$575.00$525.00$900.00
0174Manhole , cap sanitary sewer (720-03194)EACH1$2,000.00$1,685.00$2,800.00
0175Manhole , core drill existing (720-03194)EACH1$2,500.00$44,185$28,000
0176Trench drain , 12 inch (720-07309)LFT70$600.00$340.00$575.00
0177Inlet, type HA5, modified (720-09079)EACH58$3,900.00$3,750.00$4,500.00
0178Casting, manhole, adjust to grade (720-12798)EACH14$1,250.00$900.00$850.00
0179Inlet, cap (720-44296)EACH3$825.00$525.00$1,245.00
0180Inlet, type F7 (720-45035)EACH1$2,850.00$2,950.00$3,500.00
0181Inlet, type H5 , modified (720-45041)EACH6$6,450.00$7,350.00$12,000
0182Inlet, type A2, modified (720-45105)EACH2$3,250.00$2,950.00$3,875.00
0183Inlet, type J10, modified (720-45145)EACH2$3,350.00$3,349.00$3,975.00
0184Inlet, type M10, modified (720-45155)EACH1$3,260.00$3,350.00$4,000.00
0185Manhole, type C4 (720-45410)EACH2$4,750.00$3,950.00$4,350.00
0186Manhole, type D4 , modified (720-45415)EACH1$9,500.00$10,500$11,500
0187Manhole, type F4 , modified (720-45425)EACH3$6,300.00$31,000$28,300
0188Manhole, type C4, modified (720-45510)EACH7$5,250.00$4,900.00$5,900.00
0189Manhole, type D4, modified (720-45515)EACH10$9,500.00$10,500$9,200.00
0190Manhole, type E4, modified (720-45520)EACH16$13,750$22,500$16,500
0191Structure, manhole, reconstructed (720-45605)LFT32$700.00$600.00$1,680.00
0192Manhole, type K4, modified (720-92884)EACH5$9,600.00$8,800.00$8,940.00
0193Inlet, type B15, modified (720-93409)EACH85$4,200.00$4,150.00$4,800.00
0194Inlet, type C15, modified (720-93411)EACH154$4,500.00$4,250.00$4,800.00
0195Manhole, type J4, modified (720-95409)EACH10$6,500.00$6,500.00$7,975.00
0196Fire hydrant assembly , with valve and fittings (720-96999)EACH1$11,000$12,020$14,250
0197Manhole, type C2, modified (720-97865)EACH1$5,250.00$4,500.00$5,800.00
0198Manhole, type L4, modified (720-98869)EACH6$12,150$16,750$22,250
0199Automatic drainage gate , 60 inch (721-09548)EACH1$58,000$49,000$45,000
0200Face panels, concrete (731-93945)SFT7,207$65.00$56.00$57.50
0201Wall erection (731-93946)SFT7,207$21.50$19.95$21.50
0202Leveling pad, concrete (731-93947)LFT783$70.00$77.00$77.50
0203Controller, reset timing (801-02595)EACH10$260.00$50.00$50.00
0204Road closure sign assembly (801-04308)EACH30$833.00$833.00$833.00
0205Temporary pavement marking, removable, 6 in. (801-06209)LFT188,825$2.23$2.23$2.23
0206Temporary pavement message marking, removable, lane indication arrow (801-06211)EACH65$238.00$238.00$238.00
0207Temporary transverse pavement marking, removable, 24 in. (801-06218)LFT815$12.92$12.92$12.92
0208Temporary traffic signal installation, maintain (801-06539)LS1$45,425$28,000$28,000
0209Detour route marker assembly (801-06625)EACH200$265.00$265.00$265.00
0210Construction sign, type A (801-06640)EACH245$491.00$491.00$491.00
0211Construction sign, type B (801-06645)EACH560$122.00$122.00$122.00
0212Flashing arrow sign (801-06710)DAY2,920$16.00$13.50$16.00
0213Maintaining traffic (801-06775)LS1$1,250,000$1,110,000$1,710,638
0214Energy absorbing terminal, CZ, TL-3 (801-07024)EACH14$5,000.00$7,100.00$8,850.00
0215Barricade, type III-B (801-07119)LFT640$37.00$37.00$37.00
0216Temporary traffic barrier, type 2 (801-08401)LFT15,294$20.00$41.00$55.00
0217Temporary pavement marking, removable, 12 in. (801-09087)LFT1,306$6.46$6.46$6.46
0218Portable changeable message sign (801-11642)EACH3$5,349.26$16,183$16,183
0219Temporary curb ramp (801-11990)EACH35$1,750.00$4,200.00$6,245.00
0220Truck mounted attenuator (801-12042)DAY12$300.00$250.00$1,300.00
0221Law enforcement officer (801-12324)HRS4,160$60.00$60.00$60.00
0222Temporary pavement marking, removable, 28 in. , 27 inch yield line (801-12392)LFT24$51.00$51.00$51.00
0223Temporary accessible pedestrian path (801-12641)SYS288$43.59$56.00$89.49
0224Temporary speed feedback assembly (801-12832)EACH4$5,800.00$5,800.00$58.00
0225Temporary pedestrian channelizer (801-12862)LFT2,287$35.00$28.50$40.19
0226Temporary worksite speed limit sign assembly, continuous (801-12883)EACH15$610.00$610.00$610.00
0227Temporary pavement marking, removable, 10 in. (801-12956)LFT1,600$6.46$6.46$6.46
0228Signal head relocate (801-94295)EACH72$650.00$700.00$700.00
0229Sign, overhead, relocate (802-03126)EACH18$450.00$350.00$350.00
0230Reference post (802-04893)EACH4$280.00$300.00$300.00
0231Sign post, square, type 1, reinforced anchor base (802-05701)LFT739$21.50$29.00$29.00
0232Sign post, square, type 2, reinforced anchor base (802-05702)LFT93$14.50$28.00$28.00
0233Sign, panel, with legend (802-07057)SFT210$46.50$30.00$30.00
0234Sign, sheet, and supports, remove (802-07059)EACH92$65.00$60.00$60.00
0235Sign, sheet, relocate (802-07060)EACH1$265.00$225.00$225.00
0236Overhead sign structure, cantilever, type C (802-09575)EACH1$70,000$62,000$62,000
0237Cantilever sign support foundation, drilled shaft 36 in. (802-09581)EACH1$19,000$22,500$22,500
0238Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT426$36.50$30.00$30.00
0239Sign, double-faced, sheet, with legend, 0.100 in. thickness (802-09839)SFT37$130.00$39.00$39.00
0240Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT349$35.00$22.00$22.00
0241Sign, sheet, with legend, 0.125 in. thickness (802-09842)SFT317$25.00$28.00$28.00
0242Wide flange sign post support foundation, type A (802-12222)EACH2$1,900.00$2,000.00$2,000.00
0243Sign and supports, wide flange, remove (802-74040)EACH2$1,400.00$1,800.00$3,800.00
0244Structural steel, breakaway (802-76095)LBS350$16.50$15.00$15.00
0245Traffic signal equipment, remove (805-01300)EACH2$8,500.00$4,800.00$4,800.00
0246Signal pole foundation, 36 in. X 144 in. (805-01815)EACH9$3,500.00$4,800.00$4,800.00
0247Transportation of salvageable signal equipment (805-02087)LS1$3,025.00$1,500.00$1,500.00
0248Pedestrian signal head, countdown, 18 in. (805-02150)EACH13$1,000.00$700.00$700.00
0249Flasher installation, new, location no. , 1 (805-02262)LS1$8,850.00$32,000$32,000
0250Controller and cabinet, type P1 (805-02445)EACH2$24,000$24,000$24,000
0251Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645)EACH11$1,250.00$1,800.00$1,800.00
0252Loop detector delay amplifier, counting, no. 2 channel (805-09539)EACH13$775.00$750.00$750.00
0253Handhole, signal, type 2 (805-11744)EACH27$1,350.00$1,850.00$1,850.00
0254Conduit, HDPE, 2 in. schedule 80 (805-11815)LFT10,812$12.00$25.00$25.00
0255Pedestrian push button, APS (805-11817)EACH13$1,150.00$1,020.00$1,020.00
0256Uninterruptible power supply (805-12016)EACH2$9,000.00$8,500.00$8,500.00
0257Traffic signal head, no. 3 (805-78205)EACH29$1,250.00$1,200.00$1,200.00
0258Span, catenary, and tether (805-78415)EACH9$4,250.00$5,500.00$5,500.00
0259Disconnect hanger (805-78420)EACH10$385.00$550.00$550.00
0260Signal service (805-78445)EACH2$2,400.00$2,000.00$2,000.00
0261Signal cable, service, copper, 3C/8 gauge (805-78467)LFT21$15.50$15.00$15.00
0262Signal cable, roadway loop, copper, 1C/14 gauge (805-78470)LFT8,098$1.45$1.20$1.20
0263Signal cable, control, copper, 3C/14 gauge (805-78480)LFT2,446$1.80$2.50$2.50
0264Signal cable, control, copper, 5C/14 gauge (805-78485)LFT4,740$2.40$3.50$3.50
0265Signal cable, control, copper, 9C/14 gauge (805-78495)LFT2,350$3.50$3.50$3.50
0266Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510)LFT8,853$1.20$3.20$3.20
0267Signal detector housing (805-78785)EACH23$1,600.00$2,000.00$2,000.00
0268Saw cut for roadway loop detector and sealant (805-78795)LFT3,252$10.00$12.00$12.00
0269Controller cabinet foundation, type P1 (805-78925)EACH2$22,150$3,000.00$3,000.00
0270Signal pole, steel strain, 36 FT (805-81060)EACH9$11,200$11,000$11,000
0271Signal pole, pedestal, 11 FT (805-99162)EACH10$1,150.00$1,180.00$1,180.00
0272Electrical work (807-02560)LS1$20,000$12,500$12,500
0273Conduit, steel, galvanized, 2 in. (807-06592)LFT2,437$20.50$28.00$28.00
0274Metered service point (807-12354)EACH2$2,500.00$4,500.00$4,500.00
0275Lighting foundation, 45 in. barrier wall, concrete with ground (807-12794)EACH11$4,500.00$8,400.00$10,233
0276Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439)LFT2,473$10.73$10.73$10.73
0277Line, thermoplastic, broken, white, 4 in. (808-06701)LFT347$1.45$1.45$1.45
0278Line, thermoplastic, solid, white, 4 in. (808-06703)LFT2,230$0.61$0.61$0.61
0279Line, paint, broken, white, 4 in. (808-06711)LFT32$48.21$48.21$48.21
0280Line, paint, solid, white, 4 in. (808-06713)LFT398$7.82$7.82$7.82
0281Line, paint, solid, yellow, 4 in. (808-06714)LFT214$7.28$7.28$7.28
0282Line, remove (808-06716)LFT38,450$1.11$1.11$1.11
0283Pavement message marking, paint, lane indication arrow (808-06723)EACH4$382.00$382.00$382.00
0284Retro-reflectivity testing (808-09381)LS1$12,951$12,951$12,951
0285Line, multi-component, broken, white, 4 in. (808-10031)LFT125$2.00$1.43$2.00
0286Line, multi-component, solid, white, 4 in. (808-10033)LFT1,161$2.00$1.43$2.00
0287Line, multi-component, solid, yellow, 4 in. (808-10034)LFT1,629$2.00$1.43$2.00
0288Transverse marking, multi-component, crosshatch line, yellow, 12 in. (808-10042)LFT180$10.00$7.50$10.00
0289Transverse marking, multi-component, crosshatch line, white, 12 in. (808-10047)LFT78$10.00$7.50$10.00
0290Line, multi-component, solid, white, 6 in. (808-10049)LFT1,717$3.00$2.16$3.00
0291Pavement message marking, multi- component, RXR (808-10053)EACH2$1,000.00$780.00$1,000.00
0292Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,334$3.00$2.16$3.00
0293Line, multi-component, broken, white, 6 in. (808-10071)LFT1,877$3.00$2.16$3.00
0294Line, thermoplastic, dotted, white, 6 in. (808-11650)LFT273$1.97$1.97$1.97
0295Grooving for pavement markings (808-12032)LFT64,456$1.46$1.46$1.46
0296Line, preformed plastic, solid, white, 10 in. (808-12666)LFT605$14.52$14.52$14.52
0297Line, preformed plastic, broken, black, 6 in. (808-12783)LFT847$8.69$8.69$8.69
0298Line, preformed plastic, dotted, white, 10 in. (808-12848)LFT825$30.21$30.21$30.21
0299Line, multi-component, broken, black, 6 in. (808-12949)LFT1,877$8.00$8.00$8.00
0300Line, thermoplastic, solid, white, 10 in. (808-12953)LFT6,180$2.25$2.25$2.25
0301Line, paint, broken, white, 6 in. (808-75002)LFT3,072$0.27$0.27$0.27
0302Line, paint, solid, white, 6 in. (808-75007)LFT611$3.13$3.13$3.13
0303Line, thermoplastic, solid, white, 6 in. (808-75043)LFT18,891$0.86$0.86$0.86
0304Line, preformed plastic, broken, white, 6 in. (808-75055)LFT8,887$7.02$7.02$7.02
0305Transverse marking, paint, crosswalk line, white, 6 in. (808-75100)LFT320$3.13$3.13$3.13
0306Line, thermoplastic, solid, white, 12 in. (808-75215)LFT107$5.37$5.37$5.37
0307Line, thermoplastic, solid, yellow, 4 in. (808-75245)LFT3,243$0.61$0.61$0.61
0308Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT18,892$0.87$0.87$0.87
0309Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260)LFT107$5.37$5.37$5.37
0310Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272)LFT745$10.73$10.73$10.73
0311Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297)LFT1,025$10.73$10.73$10.73
0312Pavement message marking, thermoplastic, lane indication arrow (808-75320)EACH54$224.00$224.00$224.00
0313Snowplowable raised pavement marker (808-75998)EACH453$42.00$45.05$45.00
0314ITS antenna (809-06114)EACH2$1,150.00$600.00$600.00
0315CCTV assembly (809-06128)EACH1$7,600.00$2,500.00$2,500.00
0316Temporary sheet piling (206-93520)SFT3,600$35.00$26.50$135.00
0317Traffic signal head, no. 4 (805-78225)EACH2$1,625.00$1,320.00$2,640.00
INDOT contract R-45152-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way