INDOT contract B-41455-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on May 7, 2025, Gibson, Vincennes. 5 bids received; low bid $10,621,675 by Beaty Construction Inc.
- Owner
- Indiana DOT
- Letting
- 07 MAY 2025
- Pay items
- 128
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beaty Construction Inc | $10,621,675 | Low |
| 2 | Ragle, Inc. | $10,959,729 | +3.0% |
| 3 | Blankenberger Brothers Inc | $11,295,940 | +6.0% |
| 4 | CLR Inc | $11,656,393 | +10% |
| 5 | E & B Paving LLC | $12,406,000 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beaty Construction Inc | 2. Ragle, Inc. | 3. Blankenberger Brothers Inc | 4. CLR Inc | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $65,000 | $72,500 | $60,000 | $331,000 | $75,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $531,000 | $548,500 | $580,000 | $570,000 | $600,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $212,400 | $219,000 | $232,000 | $171,100 | $149,595 |
| 0013 | Pavement removal (202-02240) | SYS | 405 | $30.50 | $25.00 | $54.80 | $85.00 | $70.00 |
| 0014 | Pipe abandon and grout fill (202-02637) | LFT | 231 | $48.50 | $100.00 | $85.00 | $180.00 | $205.00 |
| 0016 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $740,901 | $460,000 | $600,000 | $800,000 | $800,000 |
| 0017 | Inlet, remove (202-91385) | EACH | 7 | $1,950.00 | $27.50 | $765.00 | $1,059.00 | $1,900.00 |
| 0018 | Barrier wall, concrete, remove (202-94954) | LFT | 429 | $25.00 | $40.00 | $36.00 | $88.00 | $70.00 |
| 0019 | Pipe, remove (202-96133) | LFT | 1,524 | $10.50 | $20.00 | $32.50 | $8.50 | $42.00 |
| 0020 | Pipe end section, remove (202-98488) | EACH | 1 | $715.00 | $180.00 | $800.00 | $500.00 | $560.00 |
| 0021 | Excavation, common (203-02000) | CYS | 2,642 | $34.00 | $31.50 | $33.75 | $25.00 | $126.00 |
| 0022 | Excavation, waterway (203-51223) | CYS | 1,005 | $38.50 | $36.50 | $55.75 | $41.00 | $80.00 |
| 0023 | Stormwater management budget (205-12108) | DOL | 36,219 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $114,500 | $45,000 | $46,900 | $20,000 | $150,000 |
| 0025 | SWQCP preparation (205-12618) | LS | 1 | $3,500.00 | $2,350.00 | $15,000 | $1,800.00 | $1,800.00 |
| 0026 | Excavation, foundation, unclassified (206-51230) | CYS | 158 | $84.00 | $35.00 | $64.00 | $57.00 | $154.00 |
| 0027 | Cofferdam (206-51235) | LS | 1 | $75,000 | $50,000 | $295,000 | $52,000 | $150,000 |
| 0028 | Subgrade treatment, type IC (207-09935) | SYS | 11,157 | $40.00 | $42.50 | $42.50 | $32.00 | $48.50 |
| 0029 | Aggregate for end bent backfill (211-06467) | CYS | 112 | $150.00 | $170.00 | $185.85 | $105.00 | $260.00 |
| 0030 | Flowable backfill, non- removable (213-09269) | CYS | 48 | $260.00 | $310.00 | $300.00 | $389.00 | $460.00 |
| 0031 | Geotextile for pavement, type 2B (214-12239) | SYS | 838 | $6.00 | $5.25 | $5.00 | $16.00 | $10.00 |
| 0032 | Compacted aggregate, no. 2 (301-12231) | CYS | 75 | $105.00 | $150.00 | $158.40 | $133.00 | $205.00 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 944 | $94.50 | $110.00 | $111.00 | $112.00 | $125.00 |
| 0034 | Subbase for PCCP (302-06464) | CYS | 103 | $175.00 | $175.00 | $205.00 | $220.00 | $275.00 |
| 0035 | Compacted aggregate, no. 53 (303-01180) | TON | 691 | $56.75 | $55.00 | $52.80 | $72.00 | $80.00 |
| 0036 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,781 | $9.50 | $8.00 | $12.00 | $16.00 | $15.00 |
| 0037 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 598 | $210.00 | $210.00 | $210.00 | $231.00 | $186.00 |
| 0038 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 755 | $165.00 | $165.00 | $165.00 | $182.00 | $138.00 |
| 0039 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 2,258 | $97.00 | $97.00 | $97.00 | $107.00 | $118.00 |
| 0040 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 864 | $102.00 | $102.00 | $102.00 | $112.00 | $118.00 |
| 0042 | Joint adhesive, intermediate (401-10259) | LFT | 3,960 | $0.25 | $0.25 | $0.25 | $0.25 | $0.70 |
| 0043 | HMA for temporary pavement, type D (402-10087) | TON | 2,633 | $120.00 | $96.00 | $96.00 | $106.00 | $135.00 |
| 0044 | Asphalt for tack coat (406-05520) | TON | 13 | $650.00 | $650.00 | $650.00 | $650.00 | $600.00 |
| 0045 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $475.00 | $475.00 | $475.00 | $475.00 | $900.00 |
| 0046 | PCCP, 14 in. (502-06331) | SYS | 431 | $215.00 | $200.00 | $177.50 | $125.00 | $155.00 |
| 0047 | Terminal joint, type HMA (503-12477) | LFT | 144 | $472.00 | $360.00 | $411.25 | $562.00 | $400.00 |
| 0048 | Guardrail, remove (601-02241) | LFT | 1,411 | $7.75 | $4.00 | $4.00 | $4.25 | $4.00 |
| 0049 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,233 | $22.00 | $22.00 | $22.00 | $24.00 | $22.00 |
| 0050 | Guardrail height transition, MGS (601-12289) | EACH | 3 | $900.00 | $1,150.00 | $1,150.00 | $1,675.00 | $1,150.00 |
| 0051 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,100.00 | $3,850.00 | $3,850.00 | $4,250.00 | $3,850.00 |
| 0052 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $3,145.00 | $3,500.00 | $3,500.00 | $5,025.00 | $3,500.00 |
| 0053 | Concrete barrier (602-01064) | LFT | 429 | $118.75 | $131.00 | $160.00 | $204.00 | $160.00 |
| 0054 | Concrete barrier , modified (602-01064) | LFT | 790 | $120.00 | $150.00 | $160.00 | $176.00 | $160.00 |
| 0055 | Barrier delineator (602-06729) | EACH | 74 | $20.00 | $12.50 | $24.50 | $15.00 | $170.00 |
| 0056 | Fence, farm field, reset (603-06060) | LFT | 50 | $50.00 | $70.00 | $70.00 | $100.00 | $70.00 |
| 0057 | Milled HMA corrugations, conventional (606-12399) | LFT | 2,980 | $6.75 | $2.50 | $4.30 | $3.00 | $9.00 |
| 0058 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 408 | $210.00 | $200.00 | $268.40 | $257.00 | $300.00 |
| 0060 | Riprap, revetment (616-06405) | TON | 1,346 | $60.00 | $71.50 | $94.60 | $112.00 | $95.00 |
| 0061 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,979 | $3.15 | $3.50 | $4.30 | $5.00 | $3.00 |
| 0062 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $250.00 | $1,050.00 | $1,050.00 | $275.00 | $1,050.00 |
| 0063 | Mulched seeding, type R (621-06559) | SYS | 2,545 | $3.00 | $2.33 | $2.33 | $5.50 | $2.33 |
| 0064 | Sodding (621-06574) | SYS | 26 | $150.00 | $60.00 | $49.00 | $100.00 | $49.00 |
| 0065 | Seed mixture, floodplain (621-12612) | LBS | 33 | $165.00 | $137.20 | $137.20 | $165.00 | $137.20 |
| 0066 | Sign, "DO not spray" (621-52448) | EACH | 15 | $130.00 | $123.50 | $123.50 | $100.00 | $123.50 |
| 0067 | Computer system equipment (628-11976) | EACH | 3 | $2,725.00 | $750.00 | $600.00 | $100.00 | $800.00 |
| 0068 | Field office, type D (628-12683) | MOS | 30 | $4,100.00 | $3,000.00 | $2,950.00 | $1,200.00 | $3,300.00 |
| 0069 | Dynamic pile load test (701-06011) | EACH | 2 | $3,050.00 | $2,500.00 | $4,800.00 | $2,300.00 | $3,500.00 |
| 0070 | Test pile, dynamic, production (701-09557) | LFT | 157 | $44.75 | $60.00 | $105.50 | $67.00 | $140.00 |
| 0071 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $1,600.00 | $8,000.00 | $4,000.00 | $1,800.00 | $6,500.00 |
| 0072 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 28 | $155.00 | $175.00 | $175.00 | $208.00 | $160.00 |
| 0073 | Automated pile driving data acquisition device (701-12836) | EACH | 1 | $15,000 | $3,500.00 | $11,000 | $9,500.00 | $7,500.00 |
| 0074 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 1,781 | $100.00 | $70.00 | $92.50 | $104.00 | $145.00 |
| 0075 | Temporary shoring (702-04325) | LS | 1 | $55,000 | $50,000 | $45,000 | $50,000 | $65,000 |
| 0076 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $1,700.00 | $1,300.00 | $2,200.00 | $2,300.00 | $1,850.00 |
| 0077 | Concrete, A, substructure (702-51005) | CYS | 151.20 | $1,685.00 | $1,750.00 | $1,925.00 | $1,355.00 | $2,400.00 |
| 0078 | Concrete, C, substructure (702-92857) | CYS | 68.50 | $1,420.00 | $1,600.00 | $1,450.00 | $1,173.00 | $1,700.00 |
| 0079 | Reinforcing bars (703-06028) | LBS | 42,306 | $1.55 | $2.00 | $1.80 | $1.43 | $2.45 |
| 0080 | Reinforcing bars, epoxy coated (703-06029) | LBS | 214,354 | $1.60 | $2.00 | $1.85 | $1.70 | $1.70 |
| 0081 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 80 | $43.25 | $56.50 | $55.00 | $23.00 | $45.00 |
| 0082 | Concrete, C, superstructure (704-51002) | CYS | 613.20 | $1,190.00 | $1,275.00 | $1,353.50 | $1,293.00 | $1,500.00 |
| 0083 | Railing, concrete type FT (706-11601) | CYS | 136.80 | $756.00 | $567.00 | $725.00 | $800.00 | $725.00 |
| 0084 | Concrete bridge railing transition, type TFT (706-11621) | EACH | 4 | $2,625.00 | $1,305.00 | $2,500.00 | $2,750.00 | $2,500.00 |
| 0085 | Surface seal (709-51821) | LS | 1 | $2,500.00 | $8,000.00 | $11,217 | $10,000 | $2,500.00 |
| 0086 | Structural steel (711-51038) | LS | 1 | $2,375,000 | $2,950,000 | $2,503,102 | $2,760,000 | $2,600,000 |
| 0087 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 1,826 | $24.25 | $8.50 | $11.30 | $10.50 | $40.00 |
| 0088 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 40 | $99.00 | $23.50 | $44.10 | $72.00 | $150.00 |
| 0089 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 200 | $23.25 | $15.00 | $24.50 | $39.00 | $12.00 |
| 0090 | Pipe, slotted drain, diameter 12 in. , 0.064 inch thickness (715-05422) | LFT | 1,521 | $90.00 | $100.00 | $184.60 | $86.00 | $140.00 |
| 0091 | Pipe, roadway drain casting extension (715-10238) | EACH | 4 | $925.00 | $1,750.00 | $1,120.00 | $1,065.00 | $600.00 |
| 0092 | Outlet protector, type 1 (718-06528) | EACH | 4 | $900.00 | $1,100.00 | $1,800.00 | $3,900.00 | $3,000.00 |
| 0093 | Geotextile for underdrains, type 1A (718-12305) | SYS | 289 | $9.00 | $3.50 | $5.50 | $4.25 | $3.80 |
| 0094 | Geotextile for underdrains, type 2A (718-12307) | SYS | 1,262 | $1.00 | $1.50 | $3.00 | $3.50 | $3.00 |
| 0095 | Aggregate for underdrains (718-52610) | CYS | 151 | $70.00 | $105.00 | $137.60 | $135.00 | $72.00 |
| 0096 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $925.00 | $350.00 | $1,300.00 | $1,000.00 | $3,500.00 |
| 0097 | Inlet, cap (720-44296) | EACH | 2 | $1,300.00 | $700.00 | $1,000.00 | $1,600.00 | $5,000.00 |
| 0098 | Longitudinal grooving (722-12732) | SYS | 1,592 | $7.00 | $5.00 | $6.50 | $20.00 | $8.00 |
| 0099 | Bearing assembly, elastomeric (726-92406) | EACH | 20 | $2,020.00 | $2,100.00 | $2,490.00 | $2,455.00 | $2,250.00 |
| 0100 | Drilled shaft exploratory core (728-11672) | LFT | 716 | $81.50 | $50.00 | $68.90 | $41.00 | $131.00 |
| 0101 | Drilled shaft permanent casing (728-11673) | LFT | 516 | $718.00 | $485.00 | $477.40 | $789.00 | $600.00 |
| 0102 | Drilled shaft, diameter 48 in. (728-11674) | LFT | 516 | $675.00 | $1,200.00 | $1,137.00 | $1,309.00 | $900.00 |
| 0103 | Drilled shaft, diameter 42 in. (728-11789) | LFT | 80 | $730.00 | $1,450.00 | $3,600.00 | $1,358.00 | $2,000.00 |
| 0104 | Road closure sign assembly (801-04308) | EACH | 5 | $345.00 | $996.00 | $345.00 | $380.00 | $345.00 |
| 0105 | Temporary pavement marking, 6 in. (801-06206) | LFT | 84,518 | $0.30 | $0.61 | $0.30 | $0.30 | $0.30 |
| 0106 | Construction sign, type A (801-06640) | EACH | 69 | $225.00 | $612.00 | $225.00 | $248.00 | $225.00 |
| 0107 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 147 | $17.95 | $50.00 | $17.95 | $17.75 | $17.95 |
| 0108 | Flashing arrow sign (801-06710) | DAY | 596 | $35.00 | $21.00 | $12.00 | $75.00 | $12.00 |
| 0109 | Maintaining traffic (801-06775) | LS | 1 | $450,000 | $155,000 | $144,986 | $159,000 | $275,000 |
| 0110 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $13,000 | $8,250.00 | $8,250.00 | $11,925 | $8,250.00 |
| 0111 | Barricade, type III-A (801-07118) | LFT | 168 | $18.00 | $33.00 | $18.00 | $18.00 | $18.00 |
| 0112 | Barricade, type III-B (801-07119) | LFT | 200 | $18.00 | $41.00 | $18.00 | $18.00 | $18.00 |
| 0113 | Temporary traffic barrier, type 2 (801-08401) | LFT | 310 | $52.50 | $60.00 | $91.00 | $76.00 | $90.00 |
| 0114 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,070 | $88.50 | $90.00 | $85.00 | $168.00 | $96.00 |
| 0115 | Portable changeable message sign (801-11642) | EACH | 2 | $9,500.00 | $18,622 | $9,500.00 | $10,450 | $9,500.00 |
| 0116 | Law enforcement officer (801-12324) | HRS | 200 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0117 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $1,500.00 | $800.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0118 | Temporary pavement marking, 10 in. (801-12955) | LFT | 6,546 | $0.98 | $0.75 | $0.98 | $0.98 | $0.98 |
| 0119 | Temporary crossover, type B (801-52817) | EACH | 2 | $50,000 | $125,000 | $73,500 | $127,000 | $50,000 |
| 0120 | Sign, panel, remove and reinstall (802-02158) | EACH | 2 | $2,000.00 | $4,500.00 | $800.00 | $660.00 | $1,500.00 |
| 0121 | Reference post (802-04893) | EACH | 2 | $200.00 | $250.00 | $250.00 | $275.00 | $250.00 |
| 0122 | Line, remove (808-06716) | LFT | 111,399 | $0.70 | $0.66 | $0.70 | $0.63 | $0.70 |
| 0123 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,000.00 | $5,912.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0124 | Grooving for pavement markings (808-12032) | LFT | 18,845 | $0.45 | $1.11 | $0.45 | $0.45 | $0.45 |
| 0125 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 9,252 | $1.25 | $1.34 | $1.25 | $1.25 | $1.25 |
| 0126 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 7,685 | $1.25 | $1.34 | $1.25 | $1.25 | $1.25 |
| 0127 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 28 | $25.00 | $17.50 | $21.50 | $50.00 | $181.48 |
| 0128 | Snowplowable raised pavement marker (808-75998) | EACH | 28 | $115.00 | $150.00 | $115.00 | $120.00 | $115.00 |
| 0129 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 3,398 | $1.65 | $2.73 | $1.65 | $1.65 | $1.65 |
| 0130 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 4,410 | $7.75 | $7.75 | $7.75 | $7.75 | $13.50 |
| 0131 | Truck mounted attenuator (801-12042) | DAY | 30 | $2,000.00 | $350.00 | $500.00 | $400.00 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of May 7, 2025. Compiled by Mirage Metrics.