INDOT contract B-43969-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on December 10, 2025, Gibson, Warrick, Vincennes. 4 bids received; low bid $2,748,500 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 102
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $2,748,500 | Low |
| 2 | Ragle, Inc. | $3,221,922 | +17% |
| 3 | American Contracting & Services Inc | $3,293,230 | +20% |
| 4 | Blankenberger Brothers Inc | $3,335,005 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Ragle, Inc. | 3. American Contracting & Services Inc | 4. Blankenberger Brothers Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $70,000 | $23,500 | $25,000 | $55,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $137,425 | $160,750 | $164,661 | $165,095 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $24,000 | $32,000 | $35,000 | $55,000 |
| 0013 | Pavement removal (202-02240) | SYS | 880 | $58.00 | $50.00 | $50.00 | $55.00 |
| 0014 | Pipe abandon and grout fill (202-02637) | LFT | 252 | $24.00 | $32.50 | $50.00 | $20.00 |
| 0015 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $10,000 | $50,000 | $10,000 | $50,000 |
| 0016 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $10,000 | $50,000 | $10,000 | $50,000 |
| 0017 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $10,000 | $50,000 | $10,000 | $50,000 |
| 0018 | Present structure, remove portions, structure no. 4 (202-51328) | LS | 1 | $10,000 | $50,000 | $10,000 | $50,000 |
| 0019 | Pipe, remove (202-96133) | LFT | 8 | $80.00 | $72.50 | $100.00 | $91.00 |
| 0020 | Pipe end section, remove (202-98488) | EACH | 2 | $530.00 | $175.00 | $500.00 | $395.00 |
| 0021 | Excavation, common (203-02000) | CYS | 600 | $74.00 | $36.00 | $116.00 | $67.50 |
| 0022 | Borrow (203-02070) | CYS | 25 | $208.00 | $1.00 | $250.00 | $1.00 |
| 0023 | Linear grading (203-08607) | LFT | 200 | $32.00 | $5.50 | $50.00 | $15.00 |
| 0024 | Stormwater management budget (205-12108) | DOL | 54,190 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $12,000 | $15,000 | $25,000 | $25,000 |
| 0026 | Cofferdam (206-51235) | LS | 1 | $40,000 | $30,000 | $75,000 | $40,000 |
| 0027 | Structure backfill, type 4 (211-09267) | CYS | 30 | $240.00 | $375.00 | $350.00 | $300.00 |
| 0028 | Flowable backfill, non- removable (213-09269) | CYS | 32 | $264.00 | $365.00 | $375.00 | $300.00 |
| 0029 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,014 | $5.00 | $4.00 | $6.00 | $12.00 |
| 0030 | Subbase for PCCP (302-06464) | CYS | 256 | $186.00 | $170.00 | $150.00 | $172.61 |
| 0031 | Milling, scarification (306-08042) | SYS | 2,192 | $4.50 | $4.50 | $5.00 | $0.76 |
| 0032 | Milling, transition (306-08043) | SYS | 5,776 | $4.00 | $3.50 | $10.00 | $4.10 |
| 0033 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 117 | $213.00 | $213.00 | $213.00 | $214.46 |
| 0034 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 546 | $235.00 | $235.00 | $235.00 | $236.61 |
| 0035 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 606 | $203.00 | $203.00 | $203.00 | $204.39 |
| 0036 | Joint adhesive (401-11526) | LFT | 8,280 | $0.25 | $0.25 | $0.25 | $0.25 |
| 0037 | Asphalt for tack coat (406-05521) | SYS | 12,336 | $0.25 | $0.25 | $0.25 | $0.25 |
| 0038 | Guardrail, reset (601-06035) | LFT | 200 | $21.00 | $21.00 | $21.00 | $21.14 |
| 0039 | Barrier delineator (602-06729) | EACH | 16 | $44.00 | $20.00 | $50.00 | $26.97 |
| 0040 | Fence, chain link, reset (603-06065) | LFT | 53 | $43.00 | $43.00 | $50.00 | $46.56 |
| 0041 | Milled HMA corrugations, conventional (606-12399) | LFT | 2,880 | $10.00 | $3.00 | $4.00 | $6.23 |
| 0042 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 1,014 | $285.00 | $270.00 | $255.00 | $251.00 |
| 0043 | Riprap, class 1 (616-05688) | TON | 487 | $112.00 | $110.00 | $130.00 | $70.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 166 | $99.00 | $102.50 | $130.00 | $70.00 |
| 0045 | Riprap, uniform (616-06451) | TON | 11 | $156.00 | $98.50 | $200.00 | $100.00 |
| 0046 | Geotextile for riprap, type 1A (616-12246) | SYS | 706 | $2.50 | $6.00 | $5.00 | $2.00 |
| 0047 | Clean drains (619-98427) | EACH | 12 | $150.00 | $100.00 | $100.00 | $1.00 |
| 0048 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $900.00 | $1,050.00 | $1,100.00 | $1,057.20 |
| 0049 | Mulched seeding, type R (621-06559) | SYS | 2,896 | $0.50 | $2.12 | $2.20 | $2.13 |
| 0050 | Computer system equipment (628-11976) | EACH | 2 | $500.00 | $750.00 | $1,500.00 | $535.00 |
| 0051 | Field office, type D (628-12683) | MOS | 12 | $3,000.00 | $3,000.00 | $4,500.00 | $2,600.00 |
| 0052 | Temporary shoring (702-04325) | LS | 1 | $45,000 | $50,000 | $40,000 | $13,000 |
| 0053 | Field drilled hole in concrete (702-51863) | EACH | 180 | $20.00 | $23.50 | $30.00 | $40.00 |
| 0054 | Reinforcing bars, epoxy coated (703-06029) | LBS | 69,789 | $2.00 | $2.25 | $1.80 | $2.00 |
| 0055 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 448 | $36.00 | $45.00 | $50.00 | $35.00 |
| 0056 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 14 | $4,500.00 | $5,700.00 | $4,600.00 | $12,800 |
| 0057 | Concrete bridge railing transition, type TFT , modified (706-11621) | EACH | 2 | $4,500.00 | $8,250.00 | $6,380.00 | $12,500 |
| 0058 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $3,774.14 | $3,756.00 | $7,500.00 | $3,800.02 |
| 0059 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $3,774.14 | $3,756.00 | $7,500.00 | $3,800.02 |
| 0060 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $3,373.27 | $3,570.00 | $6,000.00 | $3,396.40 |
| 0061 | Surface seal , bridge no. 4 (709-51821) | LS | 1 | $3,187.24 | $3,480.00 | $5,600.00 | $3,209.09 |
| 0062 | Surface seal , bridge no. 5 (709-51821) | LS | 1 | $2,181.87 | $3,480.00 | $3,000.00 | $2,196.83 |
| 0063 | Patching concrete structures (710-09158) | SFT | 260 | $13.00 | $13.00 | $15.00 | $30.00 |
| 0064 | Safety metal end section, 4:1, diameter 15 in. (715-03475) | EACH | 1 | $1,730.00 | $1,050.00 | $1,500.00 | $2,520.79 |
| 0065 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 25 | $435.00 | $65.00 | $150.00 | $84.37 |
| 0066 | Pipe installation, trenchless, 15 in. (716-07631) | LFT | 100 | $610.00 | $750.00 | $600.00 | $974.27 |
| 0067 | Inlet, type P12A (720-45070) | EACH | 2 | $4,500.00 | $4,100.00 | $6,500.00 | $5,250.00 |
| 0068 | Bridge deck overlay, rigid (722-000134) | SYS | 1,706 | $126.00 | $180.00 | $175.00 | $215.00 |
| 0069 | Bridge deck, remove polymer overlay and surface (722-000146) | SYS | 218 | $35.00 | $25.00 | $30.00 | $39.74 |
| 0070 | Bridge deck, remove concrete overlay and surface (722-000183) | SYS | 1,706 | $11.50 | $11.00 | $25.00 | $25.00 |
| 0071 | Hydrodemolition (722-01066) | SYS | 1,924 | $96.50 | $115.00 | $140.00 | $90.20 |
| 0072 | Bridge deck overlay budget (722-12380) | DOL | 47,210 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0073 | Bridge deck overlay, LMC- VE (722-12381) | SYS | 218 | $210.00 | $200.00 | $210.00 | $245.00 |
| 0074 | Longitudinal grooving (722-12732) | SYS | 2,882 | $9.30 | $7.00 | $12.00 | $9.18 |
| 0075 | Bridge deck patching, full depth (722-51401) | SFT | 603 | $35.00 | $80.00 | $45.00 | $30.00 |
| 0076 | Overlay dam (722-51874) | SFT | 342 | $82.00 | $32.50 | $85.00 | $55.00 |
| 0077 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 5 | $20.00 | $55.00 | $55.00 | $50.34 |
| 0078 | Epoxy injection, crack preparation (727-90308) | LFT | 30 | $55.00 | $20.00 | $20.00 | $88.88 |
| 0079 | Epoxy injection, furnishing equipment , bridge no. 5 (727-93560) | LS | 1 | $965.00 | $965.00 | $965.00 | $2,517.14 |
| 0080 | Smart arrow board (801-000138) | DAY | 720 | $35.00 | $35.00 | $35.00 | $20.14 |
| 0081 | Connected work zone location markers (801-000209) | EACH | 720 | $32.50 | $32.50 | $32.50 | $25.17 |
| 0082 | Road closure sign assembly (801-04308) | EACH | 4 | $250.00 | $250.00 | $250.00 | $297.02 |
| 0083 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 44,780 | $1.65 | $1.65 | $1.65 | $3.00 |
| 0084 | Detour route marker assembly (801-06625) | EACH | 19 | $150.00 | $150.00 | $150.00 | $120.82 |
| 0085 | Construction sign, type A (801-06640) | EACH | 126 | $200.00 | $200.00 | $200.00 | $166.13 |
| 0086 | Maintaining traffic (801-06775) | LS | 1 | $135,752 | $245,000 | $100,000 | $65,805 |
| 0087 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $9,100.00 | $9,100.00 | $15,000 | $9,162.40 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 108 | $12.49 | $12.49 | $15.00 | $12.08 |
| 0089 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,780 | $15.00 | $40.00 | $58.00 | $57.46 |
| 0090 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,100 | $20.00 | $60.00 | $60.00 | $63.81 |
| 0091 | Law enforcement officer (801-12324) | HRS | 120 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0092 | Digital speed limit sign assembly (801-12594) | EACH | 8 | $1,249.00 | $1,249.00 | $10,000 | $3,524.00 |
| 0093 | Reference post (802-04893) | EACH | 4 | $215.00 | $215.00 | $215.00 | $216.48 |
| 0094 | Line, remove (808-06716) | LFT | 18,260 | $0.71 | $0.71 | $1.00 | $0.45 |
| 0095 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 9,824 | $0.69 | $0.69 | $1.00 | $0.99 |
| 0096 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 8,092 | $0.69 | $0.69 | $1.00 | $0.99 |
| 0097 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 1,740 | $1.03 | $1.03 | $1.05 | $1.26 |
| 0098 | Grooving for pavement markings (808-12032) | LFT | 19,560 | $0.77 | $0.77 | $1.00 | $0.45 |
| 0099 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 106 | $1.03 | $1.03 | $2.00 | $1.26 |
| 0100 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 30 | $10.44 | $15.00 | $50.00 | $166.96 |
| 0101 | Snowplowable raised pavement marker (808-75998) | EACH | 30 | $33.37 | $33.37 | $50.00 | $125.86 |
| 0102 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $4,530.86 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.