INDOT contract B-43969-A bid tabulation

BRIDGE DECK OVERLAY. Let by Indiana DOT on December 10, 2025, Gibson, Warrick, Vincennes. 4 bids received; low bid $2,748,500 by E & B Paving LLC.

Owner
Indiana DOT
Letting
10 DEC 2025
Pay items
102
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E & B Paving LLC$2,748,500Low
2Ragle, Inc.$3,221,922+17%
3American Contracting & Services Inc$3,293,230+20%
4Blankenberger Brothers Inc$3,335,005+21%
INDOT contract B-43969-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E & B Paving LLC2. Ragle, Inc.3. American Contracting & Services Inc4. Blankenberger Brothers Inc
0001Construction engineering (105-06845)LS1$70,000$23,500$25,000$55,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00
0008Quality adjustments, pavement traffic markings (109-09377)DOL1$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$137,425$160,750$164,661$165,095
0012Clearing right-of-way (201-52370)LS1$24,000$32,000$35,000$55,000
0013Pavement removal (202-02240)SYS880$58.00$50.00$50.00$55.00
0014Pipe abandon and grout fill (202-02637)LFT252$24.00$32.50$50.00$20.00
0015Present structure, remove portions, structure no. 1 (202-51328)LS1$10,000$50,000$10,000$50,000
0016Present structure, remove portions, structure no. 2 (202-51328)LS1$10,000$50,000$10,000$50,000
0017Present structure, remove portions, structure no. 3 (202-51328)LS1$10,000$50,000$10,000$50,000
0018Present structure, remove portions, structure no. 4 (202-51328)LS1$10,000$50,000$10,000$50,000
0019Pipe, remove (202-96133)LFT8$80.00$72.50$100.00$91.00
0020Pipe end section, remove (202-98488)EACH2$530.00$175.00$500.00$395.00
0021Excavation, common (203-02000)CYS600$74.00$36.00$116.00$67.50
0022Borrow (203-02070)CYS25$208.00$1.00$250.00$1.00
0023Linear grading (203-08607)LFT200$32.00$5.50$50.00$15.00
0024Stormwater management budget (205-12108)DOL54,190$1.00$1.00$1.00$1.00
0025Stormwater management implementation (205-12616)LS1$12,000$15,000$25,000$25,000
0026Cofferdam (206-51235)LS1$40,000$30,000$75,000$40,000
0027Structure backfill, type 4 (211-09267)CYS30$240.00$375.00$350.00$300.00
0028Flowable backfill, non- removable (213-09269)CYS32$264.00$365.00$375.00$300.00
0029Geotextile for pavement, type 2B (214-12239)SYS1,014$5.00$4.00$6.00$12.00
0030Subbase for PCCP (302-06464)CYS256$186.00$170.00$150.00$172.61
0031Milling, scarification (306-08042)SYS2,192$4.50$4.50$5.00$0.76
0032Milling, transition (306-08043)SYS5,776$4.00$3.50$10.00$4.10
0033QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON117$213.00$213.00$213.00$214.46
0034QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009)TON546$235.00$235.00$235.00$236.61
0035QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045)TON606$203.00$203.00$203.00$204.39
0036Joint adhesive (401-11526)LFT8,280$0.25$0.25$0.25$0.25
0037Asphalt for tack coat (406-05521)SYS12,336$0.25$0.25$0.25$0.25
0038Guardrail, reset (601-06035)LFT200$21.00$21.00$21.00$21.14
0039Barrier delineator (602-06729)EACH16$44.00$20.00$50.00$26.97
0040Fence, chain link, reset (603-06065)LFT53$43.00$43.00$50.00$46.56
0041Milled HMA corrugations, conventional (606-12399)LFT2,880$10.00$3.00$4.00$6.23
0042Reinforced concrete bridge approach, 12 in. (609-06259)SYS1,014$285.00$270.00$255.00$251.00
0043Riprap, class 1 (616-05688)TON487$112.00$110.00$130.00$70.00
0044Riprap, revetment (616-06405)TON166$99.00$102.50$130.00$70.00
0045Riprap, uniform (616-06451)TON11$156.00$98.50$200.00$100.00
0046Geotextile for riprap, type 1A (616-12246)SYS706$2.50$6.00$5.00$2.00
0047Clean drains (619-98427)EACH12$150.00$100.00$100.00$1.00
0048Mobilization and demobilization for seeding (621-01004)EACH3$900.00$1,050.00$1,100.00$1,057.20
0049Mulched seeding, type R (621-06559)SYS2,896$0.50$2.12$2.20$2.13
0050Computer system equipment (628-11976)EACH2$500.00$750.00$1,500.00$535.00
0051Field office, type D (628-12683)MOS12$3,000.00$3,000.00$4,500.00$2,600.00
0052Temporary shoring (702-04325)LS1$45,000$50,000$40,000$13,000
0053Field drilled hole in concrete (702-51863)EACH180$20.00$23.50$30.00$40.00
0054Reinforcing bars, epoxy coated (703-06029)LBS69,789$2.00$2.25$1.80$2.00
0055Threaded tie bar assembly, epoxy coated (703-97936)EACH448$36.00$45.00$50.00$35.00
0056Concrete bridge railing transition, type TFC , modified (706-11620)EACH14$4,500.00$5,700.00$4,600.00$12,800
0057Concrete bridge railing transition, type TFT , modified (706-11621)EACH2$4,500.00$8,250.00$6,380.00$12,500
0058Surface seal , bridge no. 1 (709-51821)LS1$3,774.14$3,756.00$7,500.00$3,800.02
0059Surface seal , bridge no. 2 (709-51821)LS1$3,774.14$3,756.00$7,500.00$3,800.02
0060Surface seal , bridge no. 3 (709-51821)LS1$3,373.27$3,570.00$6,000.00$3,396.40
0061Surface seal , bridge no. 4 (709-51821)LS1$3,187.24$3,480.00$5,600.00$3,209.09
0062Surface seal , bridge no. 5 (709-51821)LS1$2,181.87$3,480.00$3,000.00$2,196.83
0063Patching concrete structures (710-09158)SFT260$13.00$13.00$15.00$30.00
0064Safety metal end section, 4:1, diameter 15 in. (715-03475)EACH1$1,730.00$1,050.00$1,500.00$2,520.79
0065Pipe, type 2, circular, diameter 15 in. (715-05032)LFT25$435.00$65.00$150.00$84.37
0066Pipe installation, trenchless, 15 in. (716-07631)LFT100$610.00$750.00$600.00$974.27
0067Inlet, type P12A (720-45070)EACH2$4,500.00$4,100.00$6,500.00$5,250.00
0068Bridge deck overlay, rigid (722-000134)SYS1,706$126.00$180.00$175.00$215.00
0069Bridge deck, remove polymer overlay and surface (722-000146)SYS218$35.00$25.00$30.00$39.74
0070Bridge deck, remove concrete overlay and surface (722-000183)SYS1,706$11.50$11.00$25.00$25.00
0071Hydrodemolition (722-01066)SYS1,924$96.50$115.00$140.00$90.20
0072Bridge deck overlay budget (722-12380)DOL47,210$1.00$1.00$1.00$1.00
0073Bridge deck overlay, LMC- VE (722-12381)SYS218$210.00$200.00$210.00$245.00
0074Longitudinal grooving (722-12732)SYS2,882$9.30$7.00$12.00$9.18
0075Bridge deck patching, full depth (722-51401)SFT603$35.00$80.00$45.00$30.00
0076Overlay dam (722-51874)SFT342$82.00$32.50$85.00$55.00
0077Epoxy injection, epoxy injection adhesive (727-000188)GAL5$20.00$55.00$55.00$50.34
0078Epoxy injection, crack preparation (727-90308)LFT30$55.00$20.00$20.00$88.88
0079Epoxy injection, furnishing equipment , bridge no. 5 (727-93560)LS1$965.00$965.00$965.00$2,517.14
0080Smart arrow board (801-000138)DAY720$35.00$35.00$35.00$20.14
0081Connected work zone location markers (801-000209)EACH720$32.50$32.50$32.50$25.17
0082Road closure sign assembly (801-04308)EACH4$250.00$250.00$250.00$297.02
0083Temporary pavement marking, removable, 6 in. (801-06209)LFT44,780$1.65$1.65$1.65$3.00
0084Detour route marker assembly (801-06625)EACH19$150.00$150.00$150.00$120.82
0085Construction sign, type A (801-06640)EACH126$200.00$200.00$200.00$166.13
0086Maintaining traffic (801-06775)LS1$135,752$245,000$100,000$65,805
0087Energy absorbing terminal, CZ, TL-3 (801-07024)EACH4$9,100.00$9,100.00$15,000$9,162.40
0088Barricade, type III-A (801-07118)LFT108$12.49$12.49$15.00$12.08
0089Temporary traffic barrier, type 2 (801-08401)LFT2,780$15.00$40.00$58.00$57.46
0090Temporary traffic barrier, anchored, type 2 (801-08508)LFT1,100$20.00$60.00$60.00$63.81
0091Law enforcement officer (801-12324)HRS120$60.00$60.00$60.00$60.00
0092Digital speed limit sign assembly (801-12594)EACH8$1,249.00$1,249.00$10,000$3,524.00
0093Reference post (802-04893)EACH4$215.00$215.00$215.00$216.48
0094Line, remove (808-06716)LFT18,260$0.71$0.71$1.00$0.45
0095Line, multi-component, solid, white, 6 in. (808-10049)LFT9,824$0.69$0.69$1.00$0.99
0096Line, multi-component, solid, yellow, 6 in. (808-10057)LFT8,092$0.69$0.69$1.00$0.99
0097Line, multi-component, broken, white, 6 in. (808-10071)LFT1,740$1.03$1.03$1.05$1.26
0098Grooving for pavement markings (808-12032)LFT19,560$0.77$0.77$1.00$0.45
0099Line, multi-component, broken, yellow, 6 in. (808-12841)LFT106$1.03$1.03$2.00$1.26
0100Snowplowable raised pavement marker, remove (808-75996)EACH30$10.44$15.00$50.00$166.96
0101Snowplowable raised pavement marker (808-75998)EACH30$33.37$33.37$50.00$125.86
0102Retro-reflectivity testing (808-09381)LS1$2,500.00$2,500.00$2,500.00$4,530.86
INDOT contract B-43969-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy