INDOT contract R-45752-A bid tabulation

SLIDE CORRECTION. Let by Indiana DOT on January 14, 2026, Spencer, Vincennes. 6 bids received; low bid $3,830,099 by Beaty Construction Inc.

Owner
Indiana DOT
Letting
14 JAN 2026
Pay items
59
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Beaty Construction Inc$3,830,099Low
2Weddle Brothers Highway Group LLC$4,458,700+16%
3Blankenberger Brothers Inc$4,533,875+18%
4Ragle, Inc.$4,744,113+24%
5E & B Paving LLC$4,949,000+29%
6Mac Construction & Excavating Inc$5,167,000+35%
INDOT contract R-45752-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Beaty Construction Inc2. Weddle Brothers Highway Group LLC3. Blankenberger Brothers Inc4. Ragle, Inc.5. E & B Paving LLC6. Mac Construction & Excavating Inc
0001Construction engineering (105-06845)LS1$60,000$48,662$30,000$21,000$98,563$50,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$191,500$194,077$226,600$237,000$245,000$240,000
0010Clearing right-of-way (201-52370)LS1$85,000$55,000$38,000$95,000$90,000$184,600
0011Pipe, remove (202-96133)LFT127$21.00$26.00$28.00$22.00$14.06$24.00
0012Excavation, unclassified (203-02020)CYS5,460$20.75$48.80$31.00$30.00$70.00$30.00
0013Lagging, precast concrete (203-02588)SYS1,081$312.00$321.00$480.00$380.00$315.00$460.00
0014Pier, drill in bedrock socket (203-02590)LFT2,494$273.00$321.00$130.00$275.00$215.00$260.00
0015Pier, nonformed, drill above bedrock socket (203-02592)LFT1,991$71.00$100.00$130.00$325.00$230.00$285.00
0016Stormwater management budget (205-12108)DOL50,984$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$2,000.00$38,000$11,000$7,500.00$24,000$50,000
0018SWQCP preparation (205-12618)LS1$2,800.00$3,200.00$1,500.00$2,750.00$2,700.00$3,010.00
0019Subgrade treatment, type II (207-08264)SYS81$39.50$31.70$42.50$30.00$91.00$28.00
0020Subgrade treatment, type IC (207-09935)SYS256$36.00$53.00$45.00$50.00$65.00$50.00
0021Structure backfill, type 3 (211-09266)CYS2,200$70.00$154.75$80.25$70.00$100.00$72.00
0022Structure backfill, type 5 (211-09268)CYS46$223.92$195.00$265.00$180.00$197.70$72.00
0023Geogrid, type IB (214-11796)SYS81$13.00$8.00$6.00$2.00$5.58$10.00
0024Compacted aggregate, no. 53 (303-01180)TON205$54.50$64.25$55.00$40.00$71.81$80.00
0025HMA patching, full depth, type B (304-12623)TON47$429.00$495.00$210.00$280.00$314.20$230.00
0026Milling, asphalt, 1 1/2 in. (306-08034)SYS2,650$4.50$2.85$2.75$2.00$2.74$3.24
0027QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON219$162.00$170.50$197.00$162.00$162.00$195.00
0028QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON39$155.00$165.00$185.00$155.00$155.00$185.00
0029QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053)TON60$200.00$211.00$230.00$200.00$200.00$230.00
0030Joint adhesive (401-11526)LFT826$0.60$0.60$0.35$0.60$0.60$0.50
0031Asphalt for prime coat (405-05518)SYS81$2.20$2.25$25.00$2.20$2.20$24.00
0032Asphalt for tack coat (406-05521)SYS309$0.20$0.22$0.50$0.20$0.20$0.14
0033HMA for approaches, type B (610-07487)TON18$270.00$286.00$415.00$270.00$270.00$415.00
0034Riprap, revetment (616-06405)TON1,053$48.00$77.00$65.00$62.00$100.00$95.00
0035Riprap, uniform (616-06451)TON761$55.00$95.50$55.00$60.00$100.00$92.00
0036Geotextile for riprap, type 1A (616-12246)SYS3,836$8.50$2.15$2.75$3.25$4.02$3.00
0037Computer system equipment (628-11976)EACH1$600.00$1,100.00$900.00$750.00$750.00$500.00
0038Field office, type D (628-12683)MOS14$3,100.00$2,100.00$3,300.00$3,000.00$2,500.40$4,100.00
0039Structural steel (711-51038)LS1$1,571,929$1,654,000$2,303,750$1,873,000$1,977,000$2,050,000
0040Pipe, type 4, circular, diameter 12 in. (715-05052)LFT816$19.50$23.00$24.50$20.00$28.00$25.00
0041Pipe, type 1, circular, diameter 12 in. (715-05118)LFT40$52.00$78.00$95.00$35.00$167.00$45.00
0042Pipe, type 1, circular, diameter 15 in. (715-05119)LFT127$67.00$66.00$105.00$46.00$150.00$58.00
0043Pipe end section, diameter 15 in. (715-46005)EACH2$800.00$1,115.00$500.00$700.00$1,250.00$2,000.00
0044Pipe, PVC, 2 in. (715-97122)LFT315$50.00$5.25$7.00$1.50$14.00$30.00
0045Inlet, type E7 (720-45030)EACH2$3,200.00$3,200.00$2,500.00$3,750.00$4,100.00$3,300.00
0046Aggregate for drainage fill (732-11770)CYS310$70.00$125.50$80.25$90.00$94.00$72.00
0047Road closure sign assembly (801-04308)EACH8$270.00$280.00$250.00$265.00$265.00$200.00
0048Detour route marker assembly (801-06625)EACH25$158.00$105.00$90.00$98.00$98.00$75.00
0049Construction sign, type A (801-06640)EACH10$221.00$175.00$155.00$165.00$165.00$200.00
0050Maintaining traffic (801-06775)LS1$42,467$24,800$26,000$30,000$40,000$25,000
0051Barricade, type III-A (801-07118)LFT48$16.31$15.00$10.00$14.00$14.00$18.00
0052Barricade, type III-B (801-07119)LFT144$16.31$15.00$10.00$14.00$14.00$18.00
0053Portable changeable message sign (801-11642)EACH2$3,910.00$4,210.00$3,500.00$4,000.00$4,000.00$4,000.00
0054Line, thermoplastic, solid, white, 6 in. (808-75043)LFT1,653$1.05$1.30$1.15$1.25$1.25$3.00
0055Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT1,130$1.05$1.30$1.15$1.25$1.25$3.00
0056Snowplowable raised pavement marker, remove (808-75996)EACH22$11.00$57.00$125.00$20.00$42.77$100.00
0057Snowplowable raised pavement marker (808-75998)EACH22$91.58$155.00$120.00$145.00$145.00$100.00
0058Line, thermoplastic, broken, yellow, 6 in. (808-96078)LFT523$1.53$1.50$1.15$1.45$1.45$3.00
0059Pipe end section, diameter 12 in. (715-46000)EACH2$800.00$1,040.00$1,250.00$675.00$1,000.00$1,900.00
INDOT contract R-45752-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy