INDOT contract R-45752-A bid tabulation
SLIDE CORRECTION. Let by Indiana DOT on January 14, 2026, Spencer, Vincennes. 6 bids received; low bid $3,830,099 by Beaty Construction Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 59
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beaty Construction Inc | $3,830,099 | Low |
| 2 | Weddle Brothers Highway Group LLC | $4,458,700 | +16% |
| 3 | Blankenberger Brothers Inc | $4,533,875 | +18% |
| 4 | Ragle, Inc. | $4,744,113 | +24% |
| 5 | E & B Paving LLC | $4,949,000 | +29% |
| 6 | Mac Construction & Excavating Inc | $5,167,000 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beaty Construction Inc | 2. Weddle Brothers Highway Group LLC | 3. Blankenberger Brothers Inc | 4. Ragle, Inc. | 5. E & B Paving LLC | 6. Mac Construction & Excavating Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $60,000 | $48,662 | $30,000 | $21,000 | $98,563 | $50,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $191,500 | $194,077 | $226,600 | $237,000 | $245,000 | $240,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $85,000 | $55,000 | $38,000 | $95,000 | $90,000 | $184,600 |
| 0011 | Pipe, remove (202-96133) | LFT | 127 | $21.00 | $26.00 | $28.00 | $22.00 | $14.06 | $24.00 |
| 0012 | Excavation, unclassified (203-02020) | CYS | 5,460 | $20.75 | $48.80 | $31.00 | $30.00 | $70.00 | $30.00 |
| 0013 | Lagging, precast concrete (203-02588) | SYS | 1,081 | $312.00 | $321.00 | $480.00 | $380.00 | $315.00 | $460.00 |
| 0014 | Pier, drill in bedrock socket (203-02590) | LFT | 2,494 | $273.00 | $321.00 | $130.00 | $275.00 | $215.00 | $260.00 |
| 0015 | Pier, nonformed, drill above bedrock socket (203-02592) | LFT | 1,991 | $71.00 | $100.00 | $130.00 | $325.00 | $230.00 | $285.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 50,984 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $2,000.00 | $38,000 | $11,000 | $7,500.00 | $24,000 | $50,000 |
| 0018 | SWQCP preparation (205-12618) | LS | 1 | $2,800.00 | $3,200.00 | $1,500.00 | $2,750.00 | $2,700.00 | $3,010.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 81 | $39.50 | $31.70 | $42.50 | $30.00 | $91.00 | $28.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 256 | $36.00 | $53.00 | $45.00 | $50.00 | $65.00 | $50.00 |
| 0021 | Structure backfill, type 3 (211-09266) | CYS | 2,200 | $70.00 | $154.75 | $80.25 | $70.00 | $100.00 | $72.00 |
| 0022 | Structure backfill, type 5 (211-09268) | CYS | 46 | $223.92 | $195.00 | $265.00 | $180.00 | $197.70 | $72.00 |
| 0023 | Geogrid, type IB (214-11796) | SYS | 81 | $13.00 | $8.00 | $6.00 | $2.00 | $5.58 | $10.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 205 | $54.50 | $64.25 | $55.00 | $40.00 | $71.81 | $80.00 |
| 0025 | HMA patching, full depth, type B (304-12623) | TON | 47 | $429.00 | $495.00 | $210.00 | $280.00 | $314.20 | $230.00 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,650 | $4.50 | $2.85 | $2.75 | $2.00 | $2.74 | $3.24 |
| 0027 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 219 | $162.00 | $170.50 | $197.00 | $162.00 | $162.00 | $195.00 |
| 0028 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 39 | $155.00 | $165.00 | $185.00 | $155.00 | $155.00 | $185.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 60 | $200.00 | $211.00 | $230.00 | $200.00 | $200.00 | $230.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 826 | $0.60 | $0.60 | $0.35 | $0.60 | $0.60 | $0.50 |
| 0031 | Asphalt for prime coat (405-05518) | SYS | 81 | $2.20 | $2.25 | $25.00 | $2.20 | $2.20 | $24.00 |
| 0032 | Asphalt for tack coat (406-05521) | SYS | 309 | $0.20 | $0.22 | $0.50 | $0.20 | $0.20 | $0.14 |
| 0033 | HMA for approaches, type B (610-07487) | TON | 18 | $270.00 | $286.00 | $415.00 | $270.00 | $270.00 | $415.00 |
| 0034 | Riprap, revetment (616-06405) | TON | 1,053 | $48.00 | $77.00 | $65.00 | $62.00 | $100.00 | $95.00 |
| 0035 | Riprap, uniform (616-06451) | TON | 761 | $55.00 | $95.50 | $55.00 | $60.00 | $100.00 | $92.00 |
| 0036 | Geotextile for riprap, type 1A (616-12246) | SYS | 3,836 | $8.50 | $2.15 | $2.75 | $3.25 | $4.02 | $3.00 |
| 0037 | Computer system equipment (628-11976) | EACH | 1 | $600.00 | $1,100.00 | $900.00 | $750.00 | $750.00 | $500.00 |
| 0038 | Field office, type D (628-12683) | MOS | 14 | $3,100.00 | $2,100.00 | $3,300.00 | $3,000.00 | $2,500.40 | $4,100.00 |
| 0039 | Structural steel (711-51038) | LS | 1 | $1,571,929 | $1,654,000 | $2,303,750 | $1,873,000 | $1,977,000 | $2,050,000 |
| 0040 | Pipe, type 4, circular, diameter 12 in. (715-05052) | LFT | 816 | $19.50 | $23.00 | $24.50 | $20.00 | $28.00 | $25.00 |
| 0041 | Pipe, type 1, circular, diameter 12 in. (715-05118) | LFT | 40 | $52.00 | $78.00 | $95.00 | $35.00 | $167.00 | $45.00 |
| 0042 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 127 | $67.00 | $66.00 | $105.00 | $46.00 | $150.00 | $58.00 |
| 0043 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $800.00 | $1,115.00 | $500.00 | $700.00 | $1,250.00 | $2,000.00 |
| 0044 | Pipe, PVC, 2 in. (715-97122) | LFT | 315 | $50.00 | $5.25 | $7.00 | $1.50 | $14.00 | $30.00 |
| 0045 | Inlet, type E7 (720-45030) | EACH | 2 | $3,200.00 | $3,200.00 | $2,500.00 | $3,750.00 | $4,100.00 | $3,300.00 |
| 0046 | Aggregate for drainage fill (732-11770) | CYS | 310 | $70.00 | $125.50 | $80.25 | $90.00 | $94.00 | $72.00 |
| 0047 | Road closure sign assembly (801-04308) | EACH | 8 | $270.00 | $280.00 | $250.00 | $265.00 | $265.00 | $200.00 |
| 0048 | Detour route marker assembly (801-06625) | EACH | 25 | $158.00 | $105.00 | $90.00 | $98.00 | $98.00 | $75.00 |
| 0049 | Construction sign, type A (801-06640) | EACH | 10 | $221.00 | $175.00 | $155.00 | $165.00 | $165.00 | $200.00 |
| 0050 | Maintaining traffic (801-06775) | LS | 1 | $42,467 | $24,800 | $26,000 | $30,000 | $40,000 | $25,000 |
| 0051 | Barricade, type III-A (801-07118) | LFT | 48 | $16.31 | $15.00 | $10.00 | $14.00 | $14.00 | $18.00 |
| 0052 | Barricade, type III-B (801-07119) | LFT | 144 | $16.31 | $15.00 | $10.00 | $14.00 | $14.00 | $18.00 |
| 0053 | Portable changeable message sign (801-11642) | EACH | 2 | $3,910.00 | $4,210.00 | $3,500.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0054 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 1,653 | $1.05 | $1.30 | $1.15 | $1.25 | $1.25 | $3.00 |
| 0055 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 1,130 | $1.05 | $1.30 | $1.15 | $1.25 | $1.25 | $3.00 |
| 0056 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 22 | $11.00 | $57.00 | $125.00 | $20.00 | $42.77 | $100.00 |
| 0057 | Snowplowable raised pavement marker (808-75998) | EACH | 22 | $91.58 | $155.00 | $120.00 | $145.00 | $145.00 | $100.00 |
| 0058 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 523 | $1.53 | $1.50 | $1.15 | $1.45 | $1.45 | $3.00 |
| 0059 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $800.00 | $1,040.00 | $1,250.00 | $675.00 | $1,000.00 | $1,900.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.