| 0001 | Construction engineering (105-06845) | LS | 1 | $16,500 | $23,750 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $101,500 | $124,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $40,500 | $55,000 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $37,200 | $150,000 |
| 0012 | Excavation, common (203-02000) | CYS | 3,254 | $37.50 | $60.00 |
| 0013 | Excavation, waterway (203-51223) | CYS | 577 | $66.85 | $50.00 |
| 0014 | Pump around (205-11626) | EACH | 4 | $8,000.00 | $12,500 |
| 0015 | Stormwater management budget (205-12108) | DOL | 16,429 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $18,500 | $25,000 |
| 0017 | SWQCP preparation (205-12618) | LS | 1 | $10,000 | $5,000.00 |
| 0018 | Excavation, wet (206-51220) | CYS | 129 | $159.60 | $260.00 |
| 0019 | Cofferdam (206-51235) | LS | 1 | $308,300 | $300,000 |
| 0020 | Subgrade treatment, type II (207-08264) | SYS | 1,125 | $28.50 | $25.00 |
| 0021 | Flowable backfill, non- removable (213-09269) | CYS | 20 | $337.30 | $300.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 178 | $9.60 | $6.25 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 108 | $89.55 | $105.00 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 44 | $193.80 | $170.00 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 87 | $92.50 | $55.00 |
| 0026 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 80 | $225.00 | $225.00 |
| 0027 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 134 | $165.00 | $165.00 |
| 0028 | Joint adhesive, surface (401-10258) | LFT | 346 | $0.50 | $0.50 |
| 0029 | Joint adhesive, intermediate (401-10259) | LFT | 346 | $0.50 | $0.50 |
| 0030 | Liquid asphalt sealant (401-11785) | LFT | 346 | $0.25 | $0.25 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 969 | $0.50 | $0.50 |
| 0032 | Guardrail transition, type TGS-1 , modified (601-06374) | EACH | 4 | $1,450.00 | $1,450.00 |
| 0033 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,050.00 | $3,050.00 |
| 0034 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 180 | $222.00 | $225.00 |
| 0035 | Right-of-way marker (615-06490) | EACH | 12 | $242.00 | $242.00 |
| 0036 | Monument, type B (615-06505) | EACH | 2 | $1,285.00 | $1,285.00 |
| 0037 | Monument, section corner (615-06527) | EACH | 1 | $940.00 | $940.00 |
| 0038 | Riprap, revetment (616-06405) | TON | 325 | $98.80 | $75.00 |
| 0039 | Geotextile for riprap, type 1A (616-12246) | SYS | 541 | $4.90 | $2.75 |
| 0040 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,050.00 | $1,050.00 |
| 0041 | Fertilizer , for permanent seeding (621-06545) | TON | 1 | $1,032.00 | $1,032.00 |
| 0042 | Mulching material (621-06565) | TON | 3 | $911.00 | $911.00 |
| 0043 | Seed mixture, floodplain (621-12612) | LBS | 24 | $180.00 | $180.00 |
| 0044 | Sign, "DO not spray" (621-52448) | EACH | 4 | $133.50 | $133.50 |
| 0045 | Computer system equipment (628-11976) | EACH | 2 | $650.00 | $1,000.00 |
| 0046 | Field office, type D (628-12683) | MOS | 12 | $2,870.00 | $2,200.00 |
| 0047 | Test pile, indicator, production (701-09558) | LFT | 320 | $102.25 | $110.00 |
| 0048 | Test pile, indicator, restrike (701-09560) | EACH | 4 | $2,500.00 | $7,500.00 |
| 0049 | Pile shoe, HP 12 X 74 (701-09683) | EACH | 20 | $140.00 | $225.00 |
| 0050 | Pile, steel H, HP 12 X 74 (701-95780) | LFT | 1,120 | $96.50 | $110.00 |
| 0051 | Concrete, A, substructure (702-51005) | CYS | 105.60 | $1,850.00 | $1,650.00 |
| 0052 | Reinforcing bars (703-06028) | LBS | 26,229 | $1.90 | $2.00 |
| 0053 | Reinforcing bars, epoxy coated (703-06029) | LBS | 54,137 | $1.95 | $2.15 |
| 0054 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 32 | $54.50 | $62.50 |
| 0055 | Concrete, C, superstructure (704-51002) | CYS | 214.80 | $2,235.00 | $2,700.00 |
| 0056 | Railing, steel type TS-1 (706-06344) | LFT | 213 | $86.00 | $90.00 |
| 0057 | Longitudinal grooving (722-12732) | SYS | 525 | $8.75 | $10.00 |
| 0058 | Road closure sign assembly (801-04308) | EACH | 5 | $259.00 | $259.00 |
| 0059 | Detour route marker assembly (801-06625) | EACH | 25 | $157.00 | $157.00 |
| 0060 | Construction sign, type A (801-06640) | EACH | 10 | $229.00 | $229.00 |
| 0061 | Maintaining traffic (801-06775) | LS | 1 | $19,917 | $70,000 |
| 0062 | Barricade, type III-A (801-07118) | LFT | 48 | $16.16 | $16.16 |
| 0063 | Barricade, type III-B (801-07119) | LFT | 36 | $16.16 | $16.16 |
| 0064 | Sign, ground mounted, reset (802-91122) | EACH | 1 | $478.00 | $478.00 |
| 0065 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,000 | $0.53 | $0.53 |
| 0066 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,000 | $0.53 | $0.53 |