INDOT contract B-43235-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on November 13, 2025, Warrick, Vincennes. 6 bids received; low bid $1,490,348 by Ragle, Inc..

Owner
Indiana DOT
Letting
13 NOV 2025
Pay items
65
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ragle, Inc.$1,490,348Low
2Blankenberger Brothers Inc$1,588,925+7.0%
3E & B Paving LLC$1,651,850+11%
4Deig Brothers Lumber & Constr$1,730,093+16%
5CLR Inc$1,759,122+18%
6Force Construction Co Inc$1,938,075+30%
INDOT contract B-43235-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ragle, Inc.2. Blankenberger Brothers Inc3. E & B Paving LLC4. Deig Brothers Lumber & Constr5. CLR Inc6. Force Construction Co Inc
0001Construction engineering (105-06845)LS1$15,000$20,000$38,641$21,001$75,000$8,315.00
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Mobilization and demobilization (110-01001)LS1$74,250$80,000$82,000$86,000$87,650$96,000
0009Clearing right-of-way (201-52370)LS1$29,500$31,400$32,000$74,280$35,075$37,050
0010Present structure, remove, structure no. 068-87-01583 (202-51330)LS1$64,500$40,000$175,000$34,025$100,000$45,270
0011Excavation, common (203-02000)CYS2,695$14.00$45.90$41.88$40.00$20.00$67.00
0012Excavation, unclassified (203-02020)CYS1,030$14.00$41.15$71.61$104.00$20.00$97.00
0013Borrow (203-02070)CYS2,135$20.00$30.00$4.19$36.77$20.00$39.00
0014Excavation, waterway (203-51223)CYS180$14.00$60.00$60.98$59.50$20.00$110.00
0015Pump around (205-11626)EACH1$20,000$37,000$48,000$38,900$50,000$23,010
0016Stormwater management budget (205-12108)DOL22,000$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$8,000.00$25,000$38,919$14,000$5,000.00$21,120
0018SWQCP preparation (205-12618)LS1$3,000.00$10,000$1,705.57$2,000.00$1,200.00$3,118.00
0019Subgrade treatment, type IC (207-09935)SYS929$45.00$50.25$66.50$61.00$65.00$27.00
0020Structure backfill, type 2 (211-09265)CYS1,003$95.00$74.70$82.77$99.00$105.00$81.00
0021Geotextile for pavement, type 2B (214-12239)SYS929$4.00$5.00$2.12$7.00$6.50$3.70
0022Compacted aggregate, no. 53 (301-12234)CYS8$150.00$316.30$425.42$148.00$195.00$201.00
0023Compacted aggregate, no. 53 (303-01180)TON189$70.00$77.45$79.28$106.00$77.00$35.00
0024Widening with HMA, type B (304-07493)TON142$150.00$120.00$159.83$128.00$310.00$232.00
0025Milling, transition (306-08043)SYS1,147$7.00$5.20$7.38$14.00$5.00$4.60
0026QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON149$170.00$170.00$173.40$181.00$345.00$244.00
0027QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON104$160.00$160.00$148.00$170.00$160.00$177.00
0028QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048)TON256$120.00$120.00$108.00$128.00$120.00$160.00
0029Joint adhesive (401-11526)LFT1,100$0.75$0.75$1.09$0.80$0.75$1.30
0030Asphalt for tack coat (406-05521)SYS3,160$0.25$0.25$0.22$0.27$0.25$0.30
0031D-1 contraction joint (503-05240)LFT76$30.00$78.50$92.74$25.00$75.00$62.00
0032Guardrail, remove (601-02241)LFT633$2.00$2.00$5.33$2.20$2.25$2.10
0033Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT50$20.00$20.00$21.32$21.30$22.50$21.00
0034Guardrail transition, MGS without curb (601-12292)EACH4$3,200.00$3,200.00$3,571.03$3,405.00$3,610.00$3,326.00
0035Guardrail end treatment, type OS (601-94689)EACH4$2,900.00$2,900.00$3,171.29$3,087.00$3,270.00$3,014.00
0036Milled HMA corrugations, conventional (606-12399)LFT1,650$3.56$5.50$4.05$4.20$3.00$8.30
0037Right-of-way marker (615-06490)EACH10$173.00$173.00$170.56$184.00$135.00$180.00
0038Monument, type B (615-06505)EACH2$979.00$979.00$1,071.31$1,042.00$750.00$1,018.00
0039Riprap, revetment (616-06405)TON1,232$65.00$63.00$69.75$89.00$74.00$75.00
0040Geotextile for riprap, type 1A (616-12246)SYS1,255$3.50$3.80$2.10$5.74$4.75$1.50
0041Mobilization and demobilization for seeding (621-01004)EACH3$200.00$950.00$213.19$200.00$200.00$208.00
0042Erosion control blanket (621-02770)SYS2,573$1.75$2.10$1.87$1.90$2.00$1.80
0043Mulched seeding, type R (621-06559)SYS2,573$1.25$0.65$1.33$1.25$1.50$1.30
0044Plant, deciduous shrub, 36 in. to 48 in. (622-05641)EACH14$375.00$95.00$399.74$379.00$425.00$390.00
0045Computer system equipment (628-11976)EACH2$1,000.00$500.00$746.19$1,360.00$100.00$1,668.00
0046Field office, type D (628-12683)MOS18$2,000.00$2,890.00$2,999.21$2,493.00$1,250.00$6,117.00
0047Reinforcing bars, epoxy coated (703-06029)LBS6,744$2.50$2.75$3.20$2.80$2.50$1.80
0048Reinforced concrete moment slab, 12 in. (706-08496)SYS165$246.00$320.50$272.89$251.00$295.00$520.00
0049Concrete bridge railing transition, type TFC (706-11620)EACH4$1,395.00$1,395.00$2,387.80$1,786.00$2,600.00$1,450.00
0050Railing, concrete type C, modified (706-94947)CYS10.70$911.00$911.00$788.83$1,062.00$950.00$947.00
0051Surface seal (709-51821)LS1$500.00$1.00$4,796.91$6,558.00$500.00$4,677.00
0052Waterproofing membrane, type 2 (714-000086)SFT3,658$4.25$2.65$3.97$4.80$5.00$4.70
0053Structure, reinforced concrete, three-sided (723-10171)LFT68$9,000.00$7,650.00$5,371.31$6,835.00$8,055.00$7,099.00
0054Road closure sign assembly (801-04308)EACH3$245.00$260.00$277.15$305.00$350.00$255.00
0055Detour route marker assembly (801-06625)EACH24$98.00$148.00$157.77$122.00$85.00$102.00
0056Construction sign, type A (801-06640)EACH12$165.00$198.00$211.06$205.00$170.00$172.00
0057Maintaining traffic (801-06775)LS1$10,000$18,287$45,082$33,000$80,000$138,001
0058Barricade, type III-A (801-07118)LFT96$12.00$15.88$16.93$15.00$18.00$12.00
0059Barricade, type III-B (801-07119)LFT72$12.00$15.88$16.93$15.00$20.00$12.00
0060Sign, ground mounted, reset (802-91122)EACH6$101.00$101.00$479.69$108.00$75.00$105.00
0061Line, paint, broken, yellow, 6 in. (808-12764)LFT60$9.95$1.03$1.10$12.40$1.25$10.00
0062Line, paint, solid, white, 6 in. (808-75007)LFT1,100$0.45$0.99$1.06$0.60$1.25$0.45
0063Line, paint, solid, yellow, 6 in. (808-75047)LFT850$0.45$0.99$1.06$0.60$1.25$0.45
0064Snowplowable raised pavement marker, remove (808-75996)EACH13$10.00$33.09$43.71$76.00$45.00$260.00
0065Snowplowable raised pavement marker (808-75998)EACH13$245.00$189.00$201.47$305.00$75.00$255.00
INDOT contract B-43235-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy