INDOT contract B-43243-B bid tabulation
BRIDGE MAINTENANCE AND REPAIR. Let by Indiana DOT on July 8, 2026, Posey, Vincennes. 3 bids received; low bid $12,676,734 by Southern Road & Bridge, LLC.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 67
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Southern Road & Bridge, LLC | $12,676,734 | Low |
| 2 | Civil Coatings and Construction Inc | $14,343,964 | +13% |
| 3 | North Star Painting Company, Inc | $19,591,027 | +55% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Southern Road & Bridge, LLC | 2. Civil Coatings and Construction Inc | 3. North Star Painting Company, Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $150,000 | $5,000.00 | $100,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $1,250,000 | $700,000 | $1,000,000 |
| 0010 | Bridge railing, remove (202-62420) | LFT | 12 | $250.00 | $50.00 | $150.00 |
| 0011 | Stormwater management budget (205-12108) | DOL | 113,730 | $1.00 | $1.00 | $1.00 |
| 0012 | Stormwater management implementation (205-12616) | LS | 1 | $85,000 | $25,000 | $100,000 |
| 0013 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 120 | $300.00 | $176.00 | $170.12 |
| 0014 | PCCP patching, partial depth (506-06334) | SYS | 4 | $1,150.00 | $450.00 | $800.00 |
| 0015 | Joints in PCCP, filled (507-08271) | LFT | 66 | $95.00 | $45.00 | $50.88 |
| 0016 | Rcba crack filling, PCC sealer/healer (507-12941) | LFT | 60 | $220.00 | $54.17 | $25.00 |
| 0017 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $50,000 | $50,000 | $300,000 |
| 0018 | Clean steel bridge, partial, QP-2, bridge no. 2 (619-11050) | LS | 1 | $50,000 | $50,000 | $500,000 |
| 0019 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $4,585,000 | $9,567,000 | $7,000,000 |
| 0020 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $85,000 | $500.00 | $100,000 |
| 0021 | Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459) | LS | 1 | $2,500.00 | $500.00 | $15,000 |
| 0022 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $2,785,000 | $750,000 | $6,500,000 |
| 0023 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $50,000 | $5,000.00 | $300,000 |
| 0024 | Coat steel bridge, partial, bridge no. 2 (619-51860) | LS | 1 | $50,000 | $5,000.00 | $500,000 |
| 0025 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $750.00 | $500.00 | $500.00 |
| 0026 | Mulching material (621-06565) | TON | 1 | $1,500.00 | $1,000.00 | $1,000.00 |
| 0027 | Seed mixture, floodplain (621-12612) | LBS | 28 | $300.00 | $250.00 | $250.00 |
| 0028 | Computer system equipment (628-11976) | EACH | 2 | $4,000.00 | $650.00 | $700.00 |
| 0029 | Field office, type D (628-12683) | MOS | 28 | $1,000.00 | $2,000.00 | $4,200.00 |
| 0030 | Reinforcing bars, epoxy coated (703-06029) | LBS | 53 | $8.00 | $20.00 | $30.00 |
| 0031 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 128 | $850.00 | $150.00 | $220.00 |
| 0032 | Railing, concrete type PF-1 (706-09962) | LFT | 12 | $650.00 | $300.00 | $750.00 |
| 0033 | Surface seal , bridge number 1 (709-51821) | LS | 1 | $150,000 | $110,000 | $149,961 |
| 0034 | Surface seal , bridge number 2 (709-51821) | LS | 1 | $150,000 | $110,000 | $155,395 |
| 0035 | Bolt (711-01373) | EACH | 662 | $225.00 | $86.00 | $86.00 |
| 0036 | Peening weld, uit (711-04702) | IN | 8 | $144.00 | $500.00 | $1,250.00 |
| 0037 | Repair , expansion device support (711-05728) | EACH | 4 | $2,500.00 | $6,500.00 | $6,500.00 |
| 0038 | Repair , grinding (711-05728) | EACH | 2 | $1,500.00 | $4,275.00 | $4,275.00 |
| 0039 | Repair weld , field (711-11599) | IN | 8 | $250.00 | $465.00 | $465.00 |
| 0040 | Structural steel (711-51035) | LBS | 368 | $148.00 | $175.00 | $175.00 |
| 0041 | Drilled hole (711-51864) | EACH | 1 | $650.00 | $300.00 | $300.00 |
| 0042 | Rivet, remove (711-51866) | EACH | 662 | $20.00 | $225.00 | $225.00 |
| 0043 | Field welding (711-95290) | LFT | 2 | $250.00 | $1,212.00 | $1,212.00 |
| 0044 | Bridge deck overlay, patching (722-97116) | SFT | 4,477 | $98.00 | $75.00 | $30.00 |
| 0045 | Concrete for patching bridge expansion joint (724-12461) | SFT | 390 | $225.00 | $150.00 | $150.00 |
| 0046 | Bridge expansion joint, type SS, replace (724-12774) | LFT | 357 | $685.00 | $600.00 | $585.07 |
| 0047 | Bridge expansion joint, type M, replace (724-12775) | LFT | 65 | $9,500.00 | $6,000.00 | $12,000 |
| 0048 | Bridge expansion joint, type PCF, replace (724-12776) | LFT | 387 | $180.00 | $150.00 | $158.01 |
| 0049 | Construction sign, type D (801-03291) | EACH | 2 | $280.00 | $200.00 | $249.00 |
| 0050 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 55,400 | $3.00 | $2.00 | $1.94 |
| 0051 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 161 | $12.00 | $10.00 | $9.50 |
| 0052 | Construction sign, type A (801-06640) | EACH | 35 | $244.00 | $400.00 | $205.00 |
| 0053 | Construction sign, type B (801-06645) | EACH | 8 | $148.00 | $200.00 | $103.00 |
| 0054 | Maintaining traffic (801-06775) | LS | 1 | $400,000 | $382,526 | $500,000 |
| 0055 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $28,500 | $17,150 | $20,000 |
| 0056 | Barricade, type III-A (801-07118) | LFT | 52 | $21.00 | $25.00 | $15.52 |
| 0057 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,150 | $85.00 | $150.00 | $60.00 |
| 0058 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 400 | $125.00 | $170.00 | $25.00 |
| 0059 | Portable changeable message sign (801-11642) | EACH | 3 | $4,250.00 | $10,000 | $3,031.00 |
| 0060 | Portable signal (801-12081) | LS | 1 | $125,000 | $130,000 | $54,539 |
| 0061 | Driveway assistance device (801-12482) | EACH | 1 | $3,500.00 | $39,000 | $2,500.00 |
| 0062 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 12 | $1,250.00 | $600.00 | $897.00 |
| 0063 | Line, remove (808-06716) | LFT | 17,260 | $0.85 | $0.75 | $0.57 |
| 0064 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 12,940 | $0.75 | $0.75 | $0.45 |
| 0065 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 4,320 | $0.75 | $0.75 | $0.45 |
| 0066 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 44 | $44.00 | $25.00 | $24.00 |
| 0067 | Snowplowable raised pavement marker (808-75998) | EACH | 44 | $69.00 | $125.00 | $55.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.