INDOT contract B-43429-A bid tabulation
SCOUR PROTECTION. Let by Indiana DOT on March 12, 2025, Fountain, Parke, Vermillion, Crawfordsville. 2 bids received; low bid $988,888 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 43
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $988,888 | Low |
| 2 | Yarberry Companies Inc | $1,019,919 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Yarberry Companies Inc |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $40,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $50,000 | $50,000 |
| 0009 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $50,000 |
| 0010 | Debris, remove, structure no. 3 (201-90788) | LS | 1 | $50,000 | $10,000 |
| 0011 | Debris, remove, structure no. 4 (201-90788) | LS | 1 | $20,000 | $10,000 |
| 0012 | Debris, remove, structure no. 5 (201-90788) | LS | 1 | $25,000 | $10,000 |
| 0013 | Excavation, common (203-02000) | CYS | 139 | $50.00 | $150.00 |
| 0014 | Borrow (203-02070) | CYS | 130 | $50.00 | $100.00 |
| 0015 | Excavation, waterway (203-51223) | CYS | 335 | $90.00 | $150.00 |
| 0016 | Pump around (205-11626) | EACH | 3 | $20,000 | $15,000 |
| 0017 | Stormwater management budget (205-12108) | DOL | 100,390 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $500.00 |
| 0019 | Cofferdam (206-51235) | LS | 1 | $40,000 | $25,000 |
| 0020 | Guardrail, reset (601-06035) | LFT | 48 | $182.00 | $80.00 |
| 0021 | Fence, farm field, reset (603-06060) | LFT | 50 | $151.00 | $40.00 |
| 0022 | Riprap, class 1 (616-05688) | TON | 1,551 | $120.00 | $140.00 |
| 0023 | Riprap, class 2 (616-05689) | TON | 771 | $120.00 | $140.00 |
| 0024 | Riprap, revetment (616-06405) | TON | 297 | $120.00 | $130.00 |
| 0025 | Geotextile for riprap, type 1A (616-12246) | SYS | 3,310.20 | $3.00 | $12.00 |
| 0026 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $875.00 | $750.00 |
| 0027 | Mulched seeding, type R (621-06559) | SYS | 366 | $45.00 | $3.00 |
| 0028 | Mulching material (621-06565) | TON | 1.83 | $690.00 | $850.00 |
| 0029 | Seed mixture, emergent wetland (621-06737) | LBS | 1 | $1,944.50 | $1,500.00 |
| 0030 | Seed mixture, floodplain (621-12612) | LBS | 58.50 | $272.62 | $2.00 |
| 0031 | Sign, "DO not spray" (621-52448) | EACH | 15 | $95.00 | $50.00 |
| 0032 | Sign, "DO not mow or spray" (622-52436) | EACH | 3 | $95.00 | $50.00 |
| 0033 | Field office, type C (628-09403) | MOS | 9 | $3,250.00 | $4,500.00 |
| 0034 | Computer system equipment (628-11976) | EACH | 1 | $1,200.00 | $2,000.00 |
| 0035 | Pipe cleaning, diameter 12 in. to 48 in. (715-01662) | LFT | 120 | $65.00 | $300.00 |
| 0036 | Clean inlet (720-96995) | EACH | 2 | $850.00 | $1,500.00 |
| 0037 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 4,600 | $1.65 | $2.50 |
| 0038 | Construction sign, type A (801-06640) | EACH | 68 | $190.00 | $200.00 |
| 0039 | Construction sign, type B (801-06645) | EACH | 4 | $190.00 | $110.00 |
| 0040 | Flashing arrow sign (801-06710) | DAY | 60 | $15.00 | $45.00 |
| 0041 | Maintaining traffic (801-06775) | LS | 1 | $55,226 | $63,000 |
| 0042 | Portable changeable message sign (801-11642) | EACH | 3 | $3,513.00 | $3.40 |
| 0043 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $600.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.