| 0001 | Construction engineering (105-06845) | LS | 1 | $20,000 | $19,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $71,000 | $104,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $2,600.00 | $20,500 |
| 0011 | Pavement removal (202-02240) | SYS | 297 | $33.00 | $52.00 |
| 0012 | Railing, remove (202-51133) | LFT | 333 | $11.00 | $2.25 |
| 0013 | Present structure, remove portions, structure no. 035-89-06568 (202-51328) | LS | 1 | $143,500 | $292,261 |
| 0014 | Excavation, common (203-02000) | CYS | 260 | $36.00 | $86.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 24,700 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $13,000 | $7,500.00 |
| 0017 | Cofferdam (206-51235) | LS | 1 | $35,000 | $45,000 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 637 | $33.00 | $65.00 |
| 0019 | Aggregate for end bent backfill (211-06467) | CYS | 48 | $112.00 | $165.00 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 637 | $5.00 | $7.50 |
| 0021 | Compacted aggregate, no. 53 (301-12234) | CYS | 52 | $115.00 | $125.00 |
| 0022 | Subbase for PCCP (302-06464) | CYS | 73 | $138.00 | $185.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 161 | $63.00 | $85.00 |
| 0024 | Milling, transition (306-08043) | SYS | 1,365 | $9.00 | $9.00 |
| 0025 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 139 | $214.45 | $236.00 |
| 0026 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 43 | $208.20 | $380.00 |
| 0027 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 186 | $200.00 | $177.00 |
| 0028 | Joint adhesive (401-11526) | LFT | 1,016 | $1.00 | $2.50 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 1,672 | $0.25 | $0.50 |
| 0030 | Terminal joint, type HMA (503-12477) | LFT | 92 | $350.00 | $370.00 |
| 0031 | Guardrail, remove (601-02241) | LFT | 587 | $10.00 | $3.10 |
| 0032 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 113 | $25.00 | $25.00 |
| 0033 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,500.00 | $3,275.00 |
| 0034 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,400.00 | $3,050.00 |
| 0035 | Barrier delineator (602-06729) | EACH | 14 | $18.00 | $45.00 |
| 0036 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 330 | $153.00 | $170.00 |
| 0037 | HMA for approaches, type B (610-07487) | TON | 3 | $214.45 | $1,044.00 |
| 0038 | Monument, type B (615-06505) | EACH | 2 | $1,800.00 | $940.00 |
| 0039 | Benchmark post, reset (615-06535) | EACH | 1 | $325.00 | $775.00 |
| 0040 | Riprap, class 1 (616-05688) | TON | 848 | $100.00 | $180.00 |
| 0041 | Riprap, class 2 (616-05689) | TON | 346 | $127.00 | $178.00 |
| 0042 | Riprap, revetment (616-06405) | TON | 57 | $90.00 | $88.00 |
| 0043 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,030 | $3.00 | $8.00 |
| 0044 | Sodding (621-06574) | SYS | 39 | $99.95 | $115.00 |
| 0045 | Field office, type C (628-09403) | MOS | 12 | $4,200.00 | $4,000.00 |
| 0046 | Computer system equipment (628-11976) | EACH | 1 | $1,200.00 | $500.00 |
| 0047 | Field drilled hole in concrete (702-51863) | EACH | 56 | $36.00 | $16.00 |
| 0048 | Concrete, C, substructure (702-92857) | CYS | 19.40 | $1,400.00 | $4,600.00 |
| 0049 | Reinforcing bars, epoxy coated (703-06029) | LBS | 109,754 | $1.58 | $1.80 |
| 0050 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 50 | $32.00 | $45.00 |
| 0051 | Concrete, C, superstructure (704-51002) | CYS | 229.40 | $1,400.00 | $2,300.00 |
| 0052 | Railing, concrete type FC (706-11600) | CYS | 31.50 | $700.00 | $800.00 |
| 0053 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $1,788.89 | $2,750.00 |
| 0054 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $13,754 | $14,500 |
| 0055 | Surface seal , bridge no. 035-89-06568 (709-51821) | LS | 1 | $1.15 | $7,500.00 |
| 0056 | Patching concrete structures (710-09158) | SFT | 126 | $185.61 | $175.00 |
| 0057 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 130 | $10.92 | $35.00 |
| 0058 | Geotextile for underdrains, type 2B (718-12308) | SYS | 122 | $8.46 | $20.00 |
| 0059 | Road closure sign assembly (801-04308) | EACH | 7 | $401.16 | $280.00 |
| 0060 | Detour route marker assembly (801-06625) | EACH | 20 | $206.31 | $175.00 |
| 0061 | Construction sign, type A (801-06640) | EACH | 4 | $257.89 | $230.00 |
| 0062 | Maintaining traffic (801-06775) | LS | 1 | $8,992.28 | $4,500.00 |
| 0063 | Barricade, type III-A (801-07118) | LFT | 126 | $22.93 | $18.00 |
| 0064 | Barricade, type III-B (801-07119) | LFT | 120 | $22.93 | $18.00 |
| 0065 | Portable changeable message sign (801-11642) | EACH | 2 | $3,896.87 | $4,250.00 |
| 0066 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $286.54 | $105.00 |
| 0067 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,080 | $1.15 | $4.25 |
| 0068 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,080 | $1.15 | $4.25 |
| 0069 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 7 | $57.31 | $75.00 |
| 0070 | Snowplowable raised pavement marker (808-75998) | EACH | 9 | $171.92 | $125.00 |