INDOT contract R-43204-A bid tabulation
DRAINAGE DITCH CORRECTION. Let by Indiana DOT on April 9, 2025, Posey, Vanderburgh, Vincennes. 5 bids received; low bid $1,256,784 by S.A.M.M. Trucking & Excavating Inc.
- Owner
- Indiana DOT
- Letting
- 09 APR 2025
- Pay items
- 29
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S.A.M.M. Trucking & Excavating Inc | $1,256,784 | Low |
| 2 | Jbi Construction Inc | $1,402,815 | +12% |
| 3 | Ragle, Inc. | $1,819,703 | +45% |
| 4 | E & B Paving LLC | $2,452,000 | +95% |
| 5 | Yarberry Companies Inc | $2,860,606 | +128% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S.A.M.M. Trucking & Excavating Inc | 2. Jbi Construction Inc | 3. Ragle, Inc. | 4. E & B Paving LLC | 5. Yarberry Companies Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $74,000 | $44,500 | $45,000 | $90,000 | $100,000 |
| 0002 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 1 | $650.00 | $1,200.00 | $520.00 | $4,500.00 | $700.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $62,500 | $95,000 | $90,900 | $117,598 | $125,000 |
| 0009 | Clearing and grubbing (201-06587) | ACRE | 9 | $11,500 | $16,500 | $36,390 | $19,250 | $30,000 |
| 0010 | Contaminated soil, remove (202-06580) | CYS | 12 | $275.00 | $265.00 | $600.00 | $1,500.00 | $500.00 |
| 0011 | Linear grading , ditch grading (203-08607) | LFT | 44,827 | $5.75 | $4.95 | $13.00 | $11.50 | $16.00 |
| 0012 | Linear grading , guardrail clipping (203-08607) | LFT | 34,637 | $4.50 | $6.75 | $4.50 | $11.50 | $16.00 |
| 0013 | Linear grading , shoulder clipping (203-08607) | LFT | 38,861 | $4.40 | $3.85 | $4.50 | $7.00 | $10.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 95,623 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $44,055 | $100,500 | $12,550 | $235,000 | $100,000 |
| 0016 | SWQCP preparation (205-12618) | LS | 1 | $2,750.00 | $12,000 | $1,900.00 | $2,750.00 | $20,000 |
| 0017 | Riprap, revetment (616-06405) | TON | 296 | $135.00 | $95.00 | $66.25 | $125.00 | $150.00 |
| 0018 | Geotextile for riprap, type 1B (616-12247) | SYS | 564 | $6.00 | $3.65 | $2.85 | $5.00 | $20.00 |
| 0019 | Mobilization and demobilization for seeding (621-01004) | EACH | 12 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 | $750.00 |
| 0020 | Fertilizer , for permanent seeding (621-06545) | TON | 4 | $1,032.00 | $1,200.00 | $1,032.00 | $1,032.00 | $1,500.00 |
| 0021 | Seed mixture, type R (621-06553) | LBS | 1,674 | $13.16 | $15.00 | $13.16 | $13.16 | $20.00 |
| 0022 | Mulching material (621-06565) | TON | 17 | $945.00 | $1,070.00 | $945.00 | $945.00 | $800.00 |
| 0023 | Sodding (621-06574) | SYS | 3,757 | $8.75 | $10.00 | $9.00 | $6.12 | $12.00 |
| 0024 | Computer system equipment (628-11976) | EACH | 1 | $500.00 | $1,000.00 | $750.00 | $1,100.00 | $2,000.00 |
| 0025 | Field office, type D (628-12683) | MOS | 12 | $1,800.00 | $2,800.00 | $2,500.00 | $3,700.00 | $4,500.00 |
| 0026 | Construction sign, type A (801-06640) | EACH | 70 | $245.00 | $245.00 | $200.00 | $231.00 | $225.00 |
| 0027 | Flashing arrow sign (801-06710) | DAY | 150 | $30.00 | $30.00 | $166.00 | $100.00 | $55.00 |
| 0028 | Maintaining traffic (801-06775) | LS | 1 | $84,000 | $92,500 | $91,500 | $253,506 | $220,000 |
| 0029 | Truck mounted attenuator (801-12042) | DAY | 120 | $225.00 | $165.00 | $450.00 | $680.00 | $170.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 9, 2025. Compiled by Mirage Metrics.