INDOT contract R-43443-A bid tabulation
SMALL STRUCTURE REPLACEMENT AND PIPE LINING. Let by Indiana DOT on May 7, 2025, Warren, Crawfordsville. 3 bids received; low bid $1,483,000 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 07 MAY 2025
- Pay items
- 30
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $1,483,000 | Low |
| 2 | Temple & Temple Excavating & Paving Inc | $1,628,623 | +10% |
| 3 | Yarberry Companies Inc | $1,755,781 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Temple & Temple Excavating & Paving Inc | 3. Yarberry Companies Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $2,500.00 | $10,000 | $30,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $74,150 | $80,000 | $85,000 |
| 0008 | Clearing right-of-way (201-52370) | LS | 1 | $74,150 | $12,200 | $70,000 |
| 0009 | Excavation, common (203-02000) | CYS | 10 | $100.00 | $350.00 | $350.00 |
| 0010 | Borrow (203-02070) | CYS | 10 | $50.00 | $250.00 | $250.00 |
| 0011 | Pump around (205-11626) | EACH | 6 | $10,000 | $29,000 | $15,000 |
| 0012 | Stormwater management budget (205-12108) | DOL | 59,100 | $1.00 | $1.00 | $1.00 |
| 0013 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $6,500.00 | $6,000.00 |
| 0014 | Structure backfill, type 5 (211-09268) | CYS | 118 | $400.00 | $385.00 | $250.00 |
| 0015 | Riprap, class 2 (616-05689) | TON | 126 | $300.00 | $145.00 | $175.00 |
| 0016 | Geotextile for riprap, type 1A (616-12246) | SYS | 166 | $13.00 | $8.00 | $20.00 |
| 0017 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $1,000.00 | $800.00 | $750.00 |
| 0018 | Seeding wetland (621-02356) | LBS | 1.20 | $6,000.00 | $900.00 | $1,500.00 |
| 0019 | Mulched seeding, type R (621-06559) | SYS | 7,170 | $7.00 | $2.50 | $2.00 |
| 0020 | Field office, type C (628-09403) | MOS | 9 | $3,000.00 | $4,300.00 | $4,500.00 |
| 0021 | Computer system equipment (628-11976) | EACH | 1 | $800.00 | $600.00 | $2,000.00 |
| 0022 | Pipe installation, trenchless, 48 in. (716-07637) | LFT | 215 | $1,600.00 | $1,895.00 | $2,250.00 |
| 0023 | Pipe liner, cured-in- place, 48 in. (725-08296) | LFT | 362 | $600.00 | $775.00 | $825.00 |
| 0024 | Pipe liner, cured-in- place, 60 in. (725-11288) | LFT | 216 | $1,000.00 | $1,150.00 | $1,226.00 |
| 0025 | Construction sign, type A (801-06640) | EACH | 54 | $175.00 | $225.00 | $210.00 |
| 0026 | Construction sign, type B (801-06645) | EACH | 18 | $75.00 | $100.00 | $120.00 |
| 0027 | Maintaining traffic (801-06775) | LS | 1 | $72,647 | $10,000 | $58,000 |
| 0028 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 6 | $10,000 | $12,000 | $10,000 |
| 0029 | Temporary traffic barrier, type 2 (801-08401) | LFT | 1,680 | $60.00 | $62.00 | $65.00 |
| 0030 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 12 | $400.00 | $1,550.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of May 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.