| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $20,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Clearing and grubbing (201-06587) | ACRE | 0.22 | $61,000 | $2,500.00 |
| 0009 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $15,785 |
| 0010 | Paved side ditch, remove (202-02272) | LFT | 102 | $70.00 | $65.00 |
| 0011 | Fence, farm field, remove (202-99187) | LFT | 107 | $5.00 | $10.00 |
| 0012 | Pump around (205-11626) | EACH | 2 | $7,500.00 | $35,000 |
| 0013 | Stormwater management budget (205-12108) | DOL | 16,101 | $1.00 | $1.00 |
| 0014 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $45,000 |
| 0015 | Flowable backfill, non- removable (213-09269) | CYS | 4 | $700.00 | $685.00 |
| 0016 | Compacted aggregate, no. 2 (301-12231) | CYS | 3 | $1,200.00 | $775.00 |
| 0017 | Compacted aggregate, no. 5 (301-12232) | CYS | 276 | $140.00 | $165.00 |
| 0019 | Paved side ditch, type B (607-06340) | LFT | 40 | $200.00 | $600.00 |
| 0020 | Right-of-way marker (615-06490) | EACH | 4 | $260.00 | $325.00 |
| 0021 | Riprap, class 2 (616-05689) | TON | 269 | $180.00 | $115.00 |
| 0023 | Geotextile for riprap, type 2B (616-12249) | SYS | 2,340 | $5.00 | $12.00 |
| 0024 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $2,000.00 | $650.00 |
| 0025 | Mulched seeding, type R (621-06559) | SYS | 1,660 | $11.00 | $6.50 |
| 0026 | Field office, type C (628-09403) | MOS | 10 | $3,000.00 | $3,900.00 |
| 0027 | Mobile internet service , 1 each (628-09409) | MOS | 10 | $300.00 | $100.00 |
| 0028 | Computer system equipment (628-11976) | EACH | 2 | $800.00 | $60.00 |
| 0029 | Computer system (628-11977) | EACH | 1 | $2,000.00 | $250.00 |
| 0030 | Concrete, A, substructure (702-51005) | CYS | 17 | $7,700.00 | $2,500.00 |
| 0031 | Concrete, B, footings (702-51015) | CYS | 10 | $2,500.00 | $1,200.00 |
| 0032 | Reinforcing bars, epoxy coated (703-06029) | LBS | 3,850 | $4.00 | $8.00 |
| 0033 | Liner pipe, thermoplastic, circular, 23.2-23.8 SFT (725-11289) | LFT | 398 | $1,300.00 | $1,650.00 |
| 0036 | Construction sign, type A (801-06640) | EACH | 24 | $190.00 | $245.00 |
| 0037 | Construction sign, type B (801-06645) | EACH | 2 | $100.00 | $120.00 |
| 0039 | Maintaining traffic (801-06775) | LS | 1 | $49,300 | $15,000 |
| 0040 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 1 | $9,200.00 | $13,350 |
| 0041 | Temporary traffic barrier, type 2 (801-08401) | LFT | 275 | $50.00 | $290.00 |
| 0043 | Mobilization and demobilization (110-01001) | LS | 1 | $217,645 | $820,000 |
| 0044 | Pipe, remove (202-96133) | LFT | 252 | $125.00 | $120.00 |
| 0045 | Excavation, common (203-02000) | CYS | 227 | $120.00 | $110.00 |
| 0046 | Subgrade treatment, type IC (207-09935) | SYS | 306 | $85.00 | $60.00 |
| 0047 | Riprap, class 1 (616-05688) | TON | 236 | $180.00 | $185.00 |
| 0048 | Structure backfill, type 2 (211-09265) | CYS | 2,915 | $100.00 | $200.00 |
| 0049 | Geotextile for pavement, type 2B (214-12239) | SYS | 295 | $5.00 | $7.00 |
| 0050 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 867 | $10.00 | $18.00 |
| 0051 | Milled HMA corrugations, conventional (606-12399) | LFT | 528 | $20.00 | $20.00 |
| 0052 | HMA for structure installation, type D (715-08307) | TON | 296 | $380.00 | $300.00 |
| 0053 | Barricade, type III-A (801-07118) | LFT | 144 | $20.00 | $25.00 |
| 0054 | Line, thermoplastic, broken, white, 4 in. (808-06701) | LFT | 66 | $2.00 | $6.00 |
| 0055 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 264 | $2.00 | $5.00 |
| 0056 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 264 | $2.00 | $5.00 |
| 0057 | Snowplowable raised pavement marker (808-75998) | EACH | 4 | $100.00 | $300.00 |