Lexington Quarry Company submitted 40 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 03 SEP 2026, and was the low bidder on 35 of them (88%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$26,452,509
Latest bid
03 SEP 2026
Data through
22 OCT 2026
40Bids
35Low bids
88Win rate, percent
+6.0%Median gap to the low bid when not low, 5 bids

By year

YearBidsLow bidsWin rate
201911100%
202033100%
202177100%
20227686%
20239778%
202422100%
20257686%
20264375%
Lexington Quarry Company, KYTC: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Maintain & control trafficLS A66 (100%)$1,650.00$11,500
Asphalt pave milling & texturingTON75 (71%)$15.00$36.50
Asphalt material for tackTON75 (71%)$1.00$10.00
Maintain & control trafficLS A A84 (50%)$5,850.00$10,625
Leveling & wedging PG64-22TON64 (67%)$69.88$94.00
DemobilizationLS A A54 (80%)$4,705.00$10,682
Pave marking-thermo stop bar-24INLF83 (38%)$11.89$14.00
Temporary signsSF73 (43%)$8.00$6.50
Pave striping-perm paint-4 inLF73 (43%)$0.23$0.29
Portable changeable message signEACH53 (60%)$1,200.00$1,750.00
Pave marking-thermo curv arrowEACH53 (60%)$98.00$125.00
Temporary signsSQFT A A52 (40%)$10.00$6.05
Lexington Quarry Company, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Lexington Quarry Company, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 SEP 202626-2136ASPHALT RESURFACING US 60 & US 60X IN WOODFORD COUNTY3 of 4$1,581,735+4.0%
29 JAN 202626-2081PAVEMENT (WITH ALTERNATES) UNION MILL ROAD (KY 169)1 of 2$149,132Low, 62% under the second
29 JAN 202626-3008PAVEMENT (WITH ALTERNATES) VARIOUS ROADS IN JESSAMINE CO1 of 2$247,159Low, 73% under the second
29 JAN 202626-3007ASPHALT RESURFACING VARIOUS PROJECTS IN WOODFORD CO1 of 3$318,091Low, 2.0% under the second
20 NOV 202525-3134ASPHALT RESURFACING RIVER ROAD (KY 1541)1 of 1$232,541Low
24 JUL 202525-2302ASPHALT RESURFACING HARRODSBURG ROAD (US 68)1 of 1$915,614Low
24 JUL 202525-2258ASPHALT RESURFACING SOUTH MAIN STREET (US 27X)1 of 1$805,050Low
22 MAY 202525-2223ASPHALT RESURFACING LEXINGTON ROAD (US 60)1 of 2$327,156Low, 17% under the second
24 APR 202525-3024District 7ASPHALT RESURFACING HOOVER PIKE (KY 3374)1 of 1$154,936Low
23 JAN 202525-2029District 7PAVEMENT (WITH ALTERNATES) WILMORE ROAD / WEST MAPLE STREET (KY 29)1 of 2$251,618Low, 34% under the second
23 JAN 202525-2045District 7PAVEMENT (WITH ALTERNATES) PINKARD PIKE (KY 169)2 of 4$166,908+6.0%
12 DEC 202424-3135District 7ASPHALT RESURFACING VARIOUS ROADS IN WOODFORD CO1 of 2$109,015Low, 18% under the second
20 JUN 202424-2224District 7ASPHALT RESURFACING NICHOLASVILLE ROAD (US 27)1 of 1$1,666,598Low
14 DEC 202323-3137District 7ASPHALT RESURFACING VARIOUS ROADS IN WOODFORD COUNTY3 of 3$476,055+18%
26 OCT 202323-3133District 7PAVEMENT (WITH ALTERNATES) VARIOUS ROADS IN JESSAMINE CO1 of 2$315,780Low, 26% under the second
28 SEP 202323-3113District 7ASPHALT RESURFACING LOGANA PIKE (KY1981)1 of 1$127,089Low
28 SEP 202323-2440District 7ASPHALT PAVEMENT & ROADWAY REHAB CATNIP HILL ROAD (KY 3375)1 of 1$1,314,883Low
22 JUN 202323-2357District 7ASPHALT PAVEMENT & ROADWAY REHAB CATNIP HILL ROAD (KY 3375)1 of 1$1,357,038Low
27 APR 202323-2145District 7ASPHALT PAVEMENT & ROADWAY REHAB CATNIP HILL ROAD (KY 3375)1 of 1$1,367,375Low
27 APR 202323-3022District 7PAVEMENT (WITH ALTERNATES) LITTLE HICKMAN RD (KY 1268)1 of 1$61,383Low
23 MAR 202323-2014District 7ASPHALT RESURFACING HARRODSBURG ROAD (US 68)1 of 1$1,994,297Low
26 JAN 202323-3012District 7ASPHALT RESURFACING VARIOUS ROADS IN WOODFORD CO3 of 3$293,387+34%
22 SEP 202222-3074District 7ASPHALT RESURFACING LOGANA PIKE (KY1981)1 of 1$124,800Low
21 JUL 202222-1037District 7ASPHALT REHAB INTERSTATE/PARKWAY BLUEGRASS PARKWAY (PW-9002)1 of 2$268,729Low, 11% under the second
26 MAY 202222-2372District 7ASPHALT RESURFACING NICHOLASVILLE ROAD (US 27)1 of 1$1,454,193Low
Lexington Quarry Company: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy