H G Mays Corporation: KYTC bid record

H G Mays Corporation submitted 190 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 22 OCT 2026, and was the low bidder on 145 of them (76%). When it was not low, its total sat a median +5.0% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$81,573,166
Latest bid
22 OCT 2026
Data through
22 OCT 2026
190Bids
145Low bids
76Win rate, percent
+5.0%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
201922100%
202016956%
2021392667%
2022363392%
2023332473%
2024262285%
2025262181%
202612867%
H G Mays Corporation, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 9806986%
District 5514078%
District 6201155%
District 710440%
H G Mays Corporation, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Leveling & wedging PG64-22TON12898 (77%)$82.92$94.00
Temporary signsSF9892 (94%)$1.00$6.50
Asphalt pave milling & texturingTON12782 (65%)$28.00$36.50
CL2 asph surf 0.38D PG64-22TON10279 (77%)$82.92$102.95
Pave marking-thermo stop bar-24INLF9278 (85%)$12.00$14.00
Fuel adjustmentDOL7777 (100%)$1.00$1.00
Asphalt adjustmentDOL7777 (100%)$1.00$1.00
Pave striping-perm paint-4 inLF7866 (85%)$0.17$0.29
Dga baseTON8065 (81%)$32.00$45.00
Asphalt material for tackTON7246 (64%)$1.00$10.00
Pave striping-temp paint-4 inLF4940 (82%)$0.18$0.20
Edgeline rumble stripsLF4538 (84%)$0.21$0.26
H G Mays Corporation, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

H G Mays Corporation, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-3046ASPHALT RESURFACING PERKINS RIDGE RD (KY 1011)1 of 3$218,857Low, 7.0% under the second
22 OCT 202626-3048ASPHALT RESURFACING WOLF RUN RD (KY 616)1 of 2$82,142Low, 13% under the second
03 SEP 202626-2121ASPHALT RESURFACING VERSAILLES ROAD (US 60)1 of 2$579,716Low, 11% under the second
03 SEP 202626-2195ASPHALT RESURFACING MAYSVILLE ROAD (US 68)1 of 2$1,988,853Low, 7.0% under the second
03 SEP 202626-2136ASPHALT RESURFACING US 60 & US 60X IN WOODFORD COUNTY4 of 4$1,599,002+5.0%
20 AUG 202626-2156ASPHALT RESURFACING EAST SECOND STREET (KY 2513)1 of 2$336,060Low, 37% under the second
26 MAR 202626-4100ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 8 (KY 8)1 of 3$1,123,619Low, 6.0% under the second
26 MAR 202626-2160ASPHALT RESURFACING MARY INGLES HIGHWAY (KY 8)2 of 3$436,568+5.0%
26 MAR 202626-2107ASPHALT RESURFACING CROPPER ROAD (KY 43)2 of 5$68,946+27%
26 MAR 202626-2113ASPHALT RESURFACING TAYLORSVILLE ROAD (KY 55)2 of 7$370,483+12%
19 FEB 202626-2049ASPHALT RESURFACING CLINTON/ANN STREET (KY 420 NORTHBOUND AND SOUTHBOUND)1 of 2$268,607Low, 23% under the second
29 JAN 202626-2097PAVEMENT (WITH ALTERNATES) GEORGETOWN ROAD (US 460)1 of 3$510,724Low, 11% under the second
20 NOV 202525-2384PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 9)1 of 3$562,952Low, 16% under the second
20 NOV 202525-2393PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 10)1 of 3$499,504Low, 17% under the second
20 NOV 202525-2395PAVEMENT (WITH ALTERNATES) MAYSVILLE ROAD (KY 11)1 of 3$356,891Low, 4.0% under the second
23 OCT 202525-3124ASPHALT RESURFACING CANE RUN RD (KY 928)1 of 2$437,027Low, 13% under the second
23 OCT 202525-3114ASPHALT RESURFACING FISHERVILLE RD (KY 148)6 of 8$814,482+11%
23 OCT 202525-3116ASPHALT RESURFACING VARIOUS ROADS IN FRANKLIN CO2 of 2$532,444+2.0%
23 OCT 202525-3122ASPHALT RESURFACING VARIOUS ROADS IN MASON CO1 of 2$445,466Low, 2.0% under the second
25 SEP 202525-2347ASPHALT RESURFACING BROOKESVILLE CHATHAM ROAD (KY 19)1 of 3$219,452Low, 4.0% under the second
25 SEP 202525-2342ASPHALT RESURFACING CONCORD TO VANCEBURG ROAD (KY 8)1 of 2$283,916Low, 5.0% under the second
25 SEP 202525-2345ASPHALT RESURFACING MAYESVILLE BYPASS/HEATHER FRENCH HENRY HIGHWAY (US 68)1 of 2$1,575,365Low, 9.0% under the second
21 AUG 202525-3105ASPHALT RESURFACING VARIOUS ROADS IN FLEMING CO1 of 2$786,590Low, 7.0% under the second
21 AUG 202525-3103ASPHALT RESURFACING VARIOUS ROADS IN ROBERTSON CO1 of 3$230,310Low, 5.0% under the second
24 JUL 202525-2289ASPHALT RESURFACING BROOKSVILLE - POWERSVILLE ROAD (KY 10)1 of 3$607,576Low, 8.0% under the second
H G Mays Corporation: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy