E & B Paving LLC: KYTC bid record
E & B Paving LLC submitted 258 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JAN 2020 to 22 OCT 2026, and was the low bidder on 54 of them (21%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $145,717,384
- Latest bid
- 22 OCT 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 16 | 2 | 13% |
| 2021 | 24 | 6 | 25% |
| 2022 | 64 | 15 | 23% |
| 2023 | 34 | 8 | 24% |
| 2024 | 37 | 10 | 27% |
| 2025 | 44 | 6 | 14% |
| 2026 | 39 | 7 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 136 | 22 | 16% |
| District 2 | 30 | 11 | 37% |
| District 4 | 21 | 10 | 48% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel adjustment | DOL | 86 | 86 (100%) | $1.00 | $1.00 | |
| Pave marking-thermo stop bar-24IN | LF | 102 | 84 (82%) | $14.00 | $14.00 | |
| Asphalt adjustment | DOL | 83 | 83 (100%) | $1.00 | $1.00 | |
| Pave striping-temp paint-4 in | LF | 93 | 75 (81%) | $0.26 | $0.20 | |
| Pave marking-thermo curv arrow | EACH | 81 | 69 (85%) | $145.00 | $125.00 | |
| Trenching and backfilling | LF | 70 | 62 (89%) | $7.00 | $7.00 | |
| Pave striping-thermo-6 in W | LF | 68 | 59 (87%) | $1.35 | $1.26 | |
| Pave striping-thermo-6 in Y | LF | 63 | 55 (87%) | $1.35 | $1.25 | |
| Pave marking-thermo X-walk-6 in | LF | 54 | 46 (85%) | $3.95 | $4.00 | |
| Asphalt pave milling & texturing | TON | 127 | 44 (35%) | $25.00 | $36.50 | |
| Pave striping-perm paint-4 in | LF | 52 | 44 (85%) | $0.30 | $0.29 | |
| Pave striping-perm paint-6 in | LF | 54 | 43 (80%) | $0.32 | $0.32 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Louisville Paving Company Inc | 180 | 128 of 180 |
| Mac Construction & Excavating Inc | 120 | 59 of 120 |
| Flynn Brothers Contracting Inc | 83 | 45 of 83 |
| Hall Contracting of Kentucky Inc | 71 | 41 of 71 |
| Mago Construction Company LLC | 64 | 44 of 64 |
| Rogers Group Inc | 36 | 24 of 36 |
| Scotty'S Contracting & Stone LLC | 33 | 16 of 33 |
| Hall Contracting of Kentucky Inc & Subsidiary | 24 | 17 of 24 |
| C & R Construction and Consulting LLC | 21 | 9 of 21 |
| Libs Paving Company Inc | 16 | 8 of 16 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-2162 | ASPHALT RESURFACING JEFFERSON COUNTY (KY 61, KY 1703) | 5 of 5 | $1,846,615 | +15% | |
| 22 OCT 2026 | 26-3063 | ASPHALT RESURFACING KY 1389 (KY 1389) | 2 of 3 | $182,500 | +5.0% | |
| 22 OCT 2026 | 26-3051 | ASPHALT RESURFACING ROUTT RD (KY 1531) | 2 of 6 | $106,499 | +4.0% | |
| 22 OCT 2026 | 26-3050 | ASPHALT RESURFACING OLD STATE RD (KY 710) | 3 of 5 | $225,607 | +6.0% | |
| 22 OCT 2026 | 26-2556 | ASPHALT RESURFACING DIXIE HIGHWAY (US 31W) | 2 of 6 | $1,089,656 | +4.0% | |
| 22 OCT 2026 | 26-3060 | ASPHALT RESURFACING VARIOUS ROAD IN UNION CO | 2 of 2 | $782,911 | +6.0% | |
| 22 OCT 2026 | 26-3066 | ASPHALT RESURFACING VARIOUS ROADS IN WEBSTER CO | 3 of 3 | $1,396,176 | +14% | |
| 24 SEP 2026 | 26-1519 | GRADE & DRAIN WITH ASPHALT SURFACE BEULAH CHURCH ROAD (KY 864) | 4 of 4 | $25,454,052 | +25% | |
| 24 SEP 2026 | 26-2240 | ASPHALT RESURFACING BYPASS ROAD (KY 313) | 1 of 5 | $1,771,313 | Low, 5.0% under the second | |
| 03 SEP 2026 | 26-2055 | ASPHALT RESURFACING FOORS LN/FAIRVIEW DR. (KY 3143) | 2 of 2 | $466,595 | +9.0% | |
| 03 SEP 2026 | 26-2079 | ASPHALT RESURFACING BROADWAY STREET (KY 448) | 4 of 5 | $368,378 | +3.0% | |
| 03 SEP 2026 | 26-2025 | ASPHALT RESURFACING UNIONTOWN TO MORGANFIELD ROAD (KY 1179) | 1 of 2 | $407,561 | Low, 1.0% under the second | |
| 03 SEP 2026 | 26-2046 | ASPHALT RESURFACING MORGANFIELD TO CORYDON ROAD (US 60) | 2 of 2 | $2,386,569 | +7.0% | |
| 03 SEP 2026 | 26-2193 | ASPHALT RESURFACING JEFFERSON COUNTY (US 42 & US 60) | 3 of 5 | $201,786 | +8.0% | |
| 03 SEP 2026 | 26-3035 | ASPHALT RESURFACING KY 1389 (KY 1389) | 2 of 2 | $350,643 | +4.0% | |
| 20 AUG 2026 | 26-4127 | PAVEMENT (WITH ALTERNATES) W US HIGHWAY 42 (US 42) | 1 of 5 | $413,146 | Low, 13% under the second | |
| 20 AUG 2026 | 26-2021 | ASPHALT RESURFACING HOUSE BRIDGE ROAD (KY 1557) | 2 of 3 | $359,557 | +1.0% | |
| 20 AUG 2026 | 26-2027 | ASPHALT RESURFACING DIXON TO SEBREE ROAD (KY 132) | 3 of 3 | $638,649 | +4.0% | |
| 20 AUG 2026 | 26-3018 | ASPHALT RESURFACING KY 1078 (KY 1078) | 1 of 3 | $387,600 | Low, 3.0% under the second | |
| 20 AUG 2026 | 26-3016 | ASPHALT RESURFACING OLD MOODY LN (KY 2856) | 4 of 6 | $239,050 | +12% | |
| 20 AUG 2026 | 26-3022 | ASPHALT RESURFACING VARIOUS ROADS IN BULLITT CO | 4 of 5 | $353,286 | +13% | |
| 20 AUG 2026 | 26-3021 | ASPHALT RESURFACING VARIOUS COUNTY ROADS IN WEBSTER CO | 3 of 3 | $460,605 | +14% | |
| 23 JUL 2026 | 26-4532 | GRADE & DRAIN WITH ASPHALT SURFACE JOE PRATHER HIGHWAY (KY 313) | 4 of 6 | $198,600 | +15% | |
| 21 MAY 2026 | 26-3014 | ASPHALT RESURFACING VARIOUS ROADS IN UNION CO | 2 of 2 | $648,705 | +19% | |
| 23 APR 2026 | 26-4401 | ASPHALT RESURFACING EAST BROADWAY (US 150) | 5 of 5 | $1,998,000 | +14% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.