KYTC contract 26-1519 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE BEULAH CHURCH ROAD (KY 864). Let by Kentucky Transportation Cabinet on September 24, 2026. 4 bids received; low bid $20,325,703 by Louisville Paving Company Inc, -16% against the engineer's estimate of $24,240,785.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 SEP 2026
- Pay items
- 209
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Louisville Paving Company Inc | $20,325,703 | Low | -16% |
| 2 | Mac Construction & Excavating Inc | $20,988,000 | +3.0% | -13% |
| 3 | Cleary Construction Inc | $23,525,000 | +16% | -3.0% |
| 4 | E & B Paving LLC | $25,454,052 | +25% | +5.0% |
Engineer's estimate: $24,240,785.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louisville Paving Company Inc | 2. Mac Construction & Excavating Inc | 3. Cleary Construction Inc | 4. E & B Paving LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 13,144 | $45.00 | $40.00 | $42.00 | $56.00 |
| 0020 | Cement stabilized roadbed | SQYD A A | 40,350 | $6.00 | $3.85 | $6.50 | $5.50 |
| 0030 | Drainage blanket-type II-asph | TON A A | 8,097 | $75.00 | $92.00 | $88.85 | $84.50 |
| 0040 | Traffic bound base | TON A A | 2,800 | $45.00 | $75.00 | $55.00 | $45.00 |
| 0050 | Crushed aggregate size no 2 | TON A A | 1,800 | $65.00 | $33.00 | $42.00 | $55.00 |
| 0060 | Asphalt seal aggregate | TON A A | 19 | $295.00 | $1,200.00 | $350.00 | $1,413.66 |
| 0070 | Asphalt seal coat | TON A A | 3 | $1,500.00 | $1,850.00 | $2,500.00 | $2,773.73 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 14,116 | $83.00 | $105.00 | $95.05 | $103.00 |
| 0090 | Asphalt material for tack | TON A A | 8 | $0.01 | $0.01 | $715.00 | $1.00 |
| 0100 | Asphalt curing seal | TON A A | 45 | $835.82 | $990.00 | $715.00 | $1.00 |
| 0110 | CL3 asph surf 0.38B PG64-22 | TON A A | 3,560 | $103.00 | $143.00 | $100.75 | $173.00 |
| 0120 | Cem conc ent pavement-8 in | SQYD A A | 1,934 | $119.04 | $89.00 | $114.00 | $114.00 |
| 0130 | Cement | TON A A | 749 | $253.00 | $344.30 | $265.00 | $344.30 |
| 0140 | Fabric-geotextile class 1 | SQYD A A | 3,000 | $2.11 | $2.50 | $3.00 | $1.64 |
| 0150 | Sand for blotter | TON A A | 106 | $59.33 | $85.00 | $95.00 | $110.02 |
| 0160 | Joint adhesive | LF A A | 7,215 | $1.89 | $1.00 | $1.00 | $1.00 |
| 0170 | Asphalt material for tack non-tracking | TON A A | 42 | $0.01 | $0.01 | $715.00 | $1.00 |
| 0180 | Crushed aggregate size no 2 | TON A A | 10,400 | $32.21 | $30.00 | $42.00 | $33.00 |
| 0190 | Inspect & certify edge drain system | LS A A | 1 | $12,050 | $10,000 | $7,500.00 | $7,500.00 |
| 0200 | Standard curb and gutter | LF A A | 13,517 | $32.00 | $30.75 | $30.75 | $30.75 |
| 0210 | Standard header curb | LF A A | 64 | $77.00 | $35.00 | $35.00 | $35.00 |
| 0220 | Delineator for G/R BI directional white | EACH A A | 22 | $12.75 | $15.81 | $12.75 | $12.75 |
| 0230 | Barricade-type III | EACH A A | 20 | $100.00 | $150.00 | $159.00 | $150.00 |
| 0240 | Remove pavement | SQYD A A | 879 | $12.63 | $20.00 | $26.00 | $19.00 |
| 0250 | Temp ditch | LF A A | 8,721 | $1.11 | $1.75 | $1.00 | $6.50 |
| 0260 | Clean temp ditch | LF A A | 17,442 | $0.51 | $0.75 | $0.01 | $5.00 |
| 0270 | Embankment in place | CUYD A A | 75,846 | $26.00 | $20.00 | $39.00 | $63.75 |
| 0280 | Water | MGAL A A | 900 | $0.01 | $0.01 | $0.01 | $20.00 |
| 0290 | G/R-W beam-S face TL-3 | LF A A | 1,537.50 | $29.75 | $34.43 | $29.75 | $29.75 |
| 0300 | G/R terminal section no 1 | EACH A A | 9 | $98.75 | $69.78 | $98.75 | $98.75 |
| 0310 | G/R end treatment type 1 | EACH A A | 4 | $3,950.75 | $3,507.31 | $3,950.75 | $3,950.75 |
| 0320 | G/R end treatment type 2M | EACH A A | 1 | $1,850.75 | $1,907.23 | $1,850.75 | $1,850.75 |
| 0330 | Remove G/R | LF A A | 300 | $1.75 | $3.58 | $1.75 | $1.75 |
| 0340 | G/R end treatment type 4A | EACH A A | 2 | $3,850.75 | $3,604.21 | $3,850.75 | $3,850.75 |
| 0350 | Septic tank treatment | EACH A A | 3 | $2,841.98 | $4,000.00 | $2,500.00 | $5,500.00 |
| 0360 | Right-of-way monument type 1 | EACH A A | 80 | $149.75 | $198.02 | $149.75 | $149.75 |
| 0370 | Right-of-way monument type 1A | EACH A A | 6 | $149.75 | $198.02 | $149.75 | $149.75 |
| 0380 | Witness post | EACH A A | 3 | $149.75 | $178.62 | $149.75 | $149.75 |
| 0390 | Fill and cap sinkhole | EACH A A | 4 | $4,701.22 | $10,000 | $6,500.00 | $15,000 |
| 0400 | Channel lining class II | TON A A | 331 | $68.08 | $70.00 | $65.00 | $95.00 |
| 0410 | Channel lining class III | TON A A | 684 | $99.24 | $85.00 | $75.00 | $100.00 |
| 0420 | Clearing and grubbing | LS A A | 1 | $250,000 | $1,250,000 | $385,000 | $350,000 |
| 0430 | Temporary signs | SQFT A A | 1,463 | $5.00 | $6.00 | $6.36 | $6.00 |
| 0440 | Fabric-geotextile class 2 | SQYD A A | 17,333 | $2.19 | $2.00 | $2.75 | $1.57 |
| 0450 | Maintain & control traffic | LS A A | 1 | $1,600,000 | $926,272 | $450,000 | $500,000 |
| 0460 | Diversions (by-pass detours) | LS A A | 1 | $13,627 | $10,000 | $45,000 | $35,000 |
| 0470 | Diversions (by-pass detours) | LS A A | 1 | $12,921 | $10,000 | $35,000 | $15,000 |
| 0480 | Portable changeable message sign | EACH A A | 5 | $15,264 | $8,500.00 | $9,010.00 | $8,500.00 |
| 0490 | Safeloading | CUYD A A | 18 | $440.87 | $570.00 | $420.00 | $400.00 |
| 0500 | Temp silt fence | LF A A | 8,721 | $2.12 | $2.12 | $3.50 | $2.00 |
| 0510 | Silt trap type A | EACH A A | 64 | $244.21 | $170.00 | $420.00 | $600.00 |
| 0520 | Silt trap type B | EACH A A | 64 | $611.13 | $150.00 | $225.00 | $300.00 |
| 0530 | Silt trap type C | EACH A A | 96 | $136.74 | $170.00 | $390.00 | $150.00 |
| 0540 | Clean silt trap type A | EACH A A | 382 | $48.84 | $30.00 | $1.00 | $150.00 |
| 0550 | Clean silt trap type B | EACH A A | 382 | $48.84 | $35.00 | $1.00 | $150.00 |
| 0560 | Clean silt trap type C | EACH A A | 573 | $48.84 | $30.00 | $1.00 | $75.00 |
| 0570 | Sidewalk-4 in concrete | SQYD A A | 7,760 | $73.00 | $57.00 | $57.00 | $70.21 |
| 0580 | Remove concrete sidewalk | SQYD A A | 67 | $56.00 | $50.00 | $45.00 | $15.41 |
| 0590 | Staking | LS A A | 1 | $260,000 | $200,000 | $285,000 | $250,000 |
| 0600 | Remove structure | LS A A | 1 | $15,000 | $10,000 | $35,000 | $50,000 |
| 0610 | Remove structure | LS A A | 1 | $22,000 | $10,000 | $25,000 | $40,000 |
| 0620 | Remove structure | LS A A | 1 | $17,000 | $10,000 | $30,000 | $35,000 |
| 0630 | Erosion control blanket | SQYD A A | 2,420 | $1.74 | $1.74 | $1.74 | $1.85 |
| 0640 | Temp mulch | SQYD A A | 108,616 | $0.24 | $0.24 | $0.24 | $0.25 |
| 0650 | Temp seeding and protection | SQYD A A | 54,308 | $0.31 | $0.31 | $0.31 | $0.31 |
| 0660 | Initial fertilizer | TON A A | 6 | $1,032.00 | $1,032.00 | $1,032.00 | $800.00 |
| 0670 | Maintenance fertilizer | TON A A | 6 | $1,032.00 | $1,032.00 | $1,032.00 | $800.00 |
| 0680 | Seeding and protection | SQYD A A | 108,616 | $0.52 | $0.52 | $0.58 | $0.45 |
| 0690 | Sodding | SQYD A A | 10,406 | $6.17 | $6.17 | $6.17 | $6.05 |
| 0700 | Agricultural limestone | TON A A | 69 | $98.00 | $98.00 | $98.00 | $95.00 |
| 0710 | SBM alum sheet signs .080 in | SQFT A A | 356 | $29.75 | $41.02 | $29.75 | $29.75 |
| 0720 | SBM alum sheet signs .125 in | SQFT A A | 100 | $31.75 | $44.66 | $31.75 | $31.75 |
| 0730 | Steel post type 1 | LF A A | 1,093 | $19.75 | $26.87 | $19.75 | $19.75 |
| 0740 | Steel post mile markers | EACH A A | 2 | $100.75 | $294.99 | $100.75 | $100.75 |
| 0750 | Pave striping-temp paint-4 in | LF A A | 17,442 | $0.19 | $0.19 | $0.19 | $0.19 |
| 0760 | Pave striping-perm paint-4 in | LF A A | 2,741 | $0.22 | $0.22 | $0.22 | $0.22 |
| 0770 | Pave striping-perm paint-6 in | LF A A | 37,570 | $0.26 | $0.26 | $0.26 | $0.26 |
| 0780 | Pave striping-temp rem tape-W | LF A A | 8,721 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0790 | Pave striping-temp rem tape-Y | LF A A | 8,721 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0800 | Pave striping-dur TY 1-4 in Y | LF A A | 100 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0810 | Pave marking-thermo X-walk-6 in | LF A A | 1,250 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0820 | Pave marking-thermo stop bar-24IN | LF A A | 281 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0830 | Pave marking-thermo cross-hatch | SQFT A A | 1,044 | $2.25 | $2.25 | $2.25 | $2.25 |
| 0840 | Pave marking-thermo STR arrow | EACH A A | 8 | $94.00 | $94.00 | $94.00 | $94.00 |
| 0850 | Pave marking-thermo curv arrow | EACH A A | 54 | $94.00 | $94.00 | $94.00 | $94.00 |
| 0860 | Inlaid pavement marker-MW | EACH A A | 76 | $26.00 | $26.00 | $26.00 | $26.00 |
| 0870 | Inlaid pavement marker-by | EACH A A | 298 | $26.00 | $26.00 | $26.00 | $26.00 |
| 0880 | Fuel adjustment | DOLL A A | 39,329 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0890 | Asphalt adjustment | DOLL A A | 71,600 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0900 | Object marker TY 3 | EACH A A | 6 | $99.75 | $25.82 | $99.75 | $99.75 |
| 0910 | Sawcut pavement | LF A A | 254 | $2.95 | $5.00 | $3.00 | $2.00 |
| 0920 | Pave marking thermo-bike | EACH A A | 8 | $150.00 | $150.00 | $150.00 | $150.00 |
| 0930 | Detectable warnings | SQFT A A | 447 | $48.38 | $24.00 | $24.00 | $24.00 |
| 0940 | Pave mark TY 1 tape stop bar-12 in | LF A A | 10 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0950 | Pave mark-thermo-X-walk-24 in | LF A A | 115 | $8.00 | $8.00 | $8.00 | $8.00 |
| 0960 | Turf reinforcement mat 1 | SQYD A A | 5,051 | $5.71 | $5.71 | $5.71 | $15.00 |
| 0970 | Pave mark thermo-6 in W cat traxx | LF A A | 20 | $2.95 | $2.95 | $2.95 | $2.95 |
| 0980 | Install | EACH A A | 1 | $1,499.75 | $350.00 | $1,499.75 | $1,500.00 |
| 0990 | Barcode sign inventory | EACH A A | 85 | $15.00 | $23.24 | $15.00 | $15.00 |
| 1000 | Pipeline inspection | LF A A | 5,295 | $2.45 | $2.00 | $2.45 | $2.45 |
| 1010 | Crushed aggregate size no 2 | TON A A | 10 | $200.00 | $200.00 | $120.00 | $170.00 |
| 1020 | Entrance pipe-15 in | LF A A | 277 | $97.00 | $90.00 | $110.00 | $160.00 |
| 1030 | Entrance pipe-18 in | LF A A | 78 | $138.00 | $93.00 | $150.00 | $195.00 |
| 1040 | Entrance pipe-24 in | LF A A | 184 | $111.00 | $100.00 | $280.00 | $215.00 |
| 1050 | Culvert pipe-24 in | LF A A | 34 | $263.00 | $260.00 | $175.00 | $355.00 |
| 1060 | Storm sewer pipe-12 in | LF A A | 170 | $207.00 | $135.00 | $165.00 | $195.00 |
| 1070 | Storm sewer pipe-15 in | LF A A | 2,247 | $103.00 | $91.00 | $145.00 | $165.00 |
| 1080 | Storm sewer pipe-18 in | LF A A | 6,962 | $128.00 | $120.00 | $165.00 | $195.00 |
| 1090 | Storm sewer pipe-24 in | LF A A | 483 | $161.00 | $160.00 | $225.00 | $217.00 |
| 1100 | Storm sewer pipe-30 in | LF A A | 69 | $302.00 | $175.00 | $250.00 | $253.00 |
| 1110 | Storm sewer pipe-36 in | LF A A | 85 | $248.00 | $615.00 | $300.00 | $422.00 |
| 1120 | Slotted drain pipe-12 in | LF A A | 10 | $1,675.00 | $360.00 | $665.00 | $920.00 |
| 1130 | Perforated pipe-4 in | LF A A | 682 | $19.00 | $25.00 | $35.00 | $45.00 |
| 1140 | Perforated pipe edge drain-4 in | LF A A | 12,920 | $16.00 | $11.50 | $9.25 | $16.00 |
| 1150 | Non-perforated pipe-4 in | LF A A | 510 | $29.00 | $29.83 | $50.00 | $65.00 |
| 1160 | Perf pipe headwall TY 2-4 in | EACH A A | 6 | $745.00 | $1,000.00 | $1,100.00 | $1,100.00 |
| 1170 | Perf pipe headwall TY 3-4 in | EACH A A | 3 | $945.00 | $950.00 | $1,100.00 | $1,250.00 |
| 1180 | Perf pipe headwall TY 4-4 in | EACH A A | 1 | $945.00 | $1,500.00 | $1,100.00 | $1,100.00 |
| 1190 | Pipe culvert headwall-12 in | EACH A A | 1 | $1,800.00 | $1,450.00 | $4,000.00 | $1,500.00 |
| 1200 | Pipe culvert headwall-15 in | EACH A A | 2 | $1,900.00 | $1,450.00 | $4,250.00 | $1,550.00 |
| 1210 | Pipe culvert headwall-18 in | EACH A A | 8 | $1,900.00 | $1,600.00 | $4,500.00 | $1,650.00 |
| 1220 | Pipe culvert headwall-24 in | EACH A A | 3 | $2,300.00 | $2,300.00 | $5,000.00 | $2,350.00 |
| 1230 | Pipe culvert headwall-30 in | EACH A A | 1 | $2,500.00 | $3,800.00 | $5,500.00 | $3,200.00 |
| 1240 | Pipe culvert headwall-36 in | EACH A A | 1 | $2,600.00 | $4,500.00 | $6,000.00 | $3,250.00 |
| 1250 | S & F box inlet-outlet-24 in | EACH A A | 2 | $4,400.00 | $4,500.00 | $7,500.00 | $6,300.00 |
| 1260 | Curb box inlet type A | EACH A A | 7 | $6,600.00 | $8,300.00 | $9,250.00 | $6,900.00 |
| 1270 | Curb box inlet type B | EACH A A | 70 | $5,200.00 | $7,500.00 | $9,600.00 | $6,800.00 |
| 1280 | Drop box inlet type 6D | EACH A A | 8 | $9,900.00 | $8,900.00 | $11,500 | $13,500 |
| 1290 | Drop box inlet type 11 | EACH A A | 8 | $2,600.00 | $4,215.00 | $6,000.00 | $4,250.00 |
| 1300 | Drop box inlet type 13S | EACH A A | 2 | $4,260.31 | $8,500.00 | $8,500.00 | $13,000 |
| 1310 | Drop box inlet type 14 | EACH A A | 33 | $3,000.00 | $3,900.00 | $9,500.00 | $4,150.00 |
| 1320 | Drop box inlet type 16G | EACH A A | 1 | $3,000.00 | $6,500.00 | $4,500.00 | $4,000.00 |
| 1330 | Manhole type C | EACH A A | 2 | $5,000.00 | $7,500.00 | $6,500.00 | $7,000.00 |
| 1340 | Fabric-geotextile class 2 for pipe | SQYD A A | 13,759 | $2.00 | $2.00 | $2.00 | $2.00 |
| 1350 | Concrete-class A | CUYD A A | 1.19 | $1,024.00 | $2,600.00 | $2,200.00 | $418.82 |
| 1360 | Temporary pipe | LF A A | 600 | $83.71 | $50.00 | $140.00 | $70.00 |
| 1370 | Structure excav-solid rock | CUYD A A | 131 | $134.00 | $135.00 | $195.00 | $135.00 |
| 1380 | Foundation preparation | LS A A | 1 | $64,910 | $75,000 | $55,000 | $200,000 |
| 1390 | Concrete-class A | CUYD A A | 202.70 | $1,000.00 | $1,000.00 | $1,350.00 | $1,295.00 |
| 1400 | Steel reinforcement | LB A A | 27,216 | $1.50 | $1.70 | $1.85 | $1.90 |
| 1410 | Structure excav-solid rock | CUYD A A | 65 | $130.00 | $135.00 | $195.00 | $142.10 |
| 1420 | Foundation preparation | LS A A | 1 | $59,519 | $75,000 | $45,000 | $180,000 |
| 1430 | Concrete-class A | CUYD A A | 170.90 | $1,125.00 | $1,120.00 | $1,475.00 | $1,450.00 |
| 1440 | Steel reinforcement | LB A A | 16,045 | $2.00 | $1.92 | $1.85 | $1.90 |
| 1450 | Structure excav-solid rock | CUYD A A | 11.40 | $140.00 | $135.00 | $350.00 | $153.77 |
| 1460 | Foundation preparation | LS A A | 1 | $67,091 | $75,000 | $45,000 | $190,000 |
| 1470 | Concrete-class A | CUYD A A | 138.70 | $1,470.00 | $1,470.00 | $1,500.00 | $1,835.00 |
| 1480 | Steel reinforcement | LB A A | 12,634 | $1.93 | $1.93 | $1.85 | $1.90 |
| 1490 | Remove concrete masonry | CUYD A A | 3 | $495.00 | $500.00 | $3,250.00 | $4,000.00 |
| 1500 | Structure excav-solid rock | CUYD A A | 45 | $140.00 | $135.00 | $195.00 | $154.41 |
| 1510 | Foundation preparation | LS A A | 1 | $83,385 | $50,000 | $35,000 | $119,145 |
| 1520 | Concrete-class A | CUYD A A | 169.70 | $1,400.00 | $1,400.00 | $1,650.00 | $1,880.00 |
| 1530 | Steel reinforcement | LB A A | 14,319 | $1.99 | $1.99 | $1.85 | $1.90 |
| 1535 | Safeloading | CUYD A A | 6 | $2,650.00 | $950.00 | $515.00 | $2,650.00 |
| 1540 | S force main air RLS/vac VLV SPCL | EACH A A | 1 | $37,100 | $40,000 | $72,000 | $2,828.00 |
| 1550 | S force main air RLS/vac VLV SPCL | EACH A A | 1 | $2,800.00 | $35,000 | $32,000 | $37,022 |
| 1560 | S force main PVC 04 inch | LF A A | 1,131 | $59.00 | $125.00 | $172.00 | $58.00 |
| 1570 | S force main PVC 06 inch | LF A A | 86 | $119.00 | $440.00 | $280.00 | $120.00 |
| 1580 | S force main PVC 08 inch | LF A A | 681 | $158.00 | $165.00 | $195.00 | $160.00 |
| 1590 | S force main special | LF A A | 681 | $251.00 | $255.00 | $305.00 | $249.00 |
| 1600 | S force main tie-in 04 inch | EACH A A | 1 | $8,168.00 | $8,800.00 | $8,500.00 | $8,170.00 |
| 1610 | S force main tie-in 06 inch | EACH A A | 2 | $8,218.00 | $9,000.00 | $9,000.00 | $8,220.00 |
| 1620 | S force main tie-in 08 inch | EACH A A | 2 | $8,360.00 | $9,100.00 | $12,500 | $8,358.00 |
| 1630 | S force main tie-in special | EACH A A | 2 | $12,550 | $21,000 | $25,000 | $12,545 |
| 1640 | S force main tie-in special | EACH A A | 1 | $9,750.00 | $9,000.00 | $9,500.00 | $9,740.00 |
| 1650 | S cap existing main | EACH A A | 7 | $2,090.00 | $4,000.00 | $5,500.00 | $2,083.00 |
| 1660 | Trenching and backfilling | LF A A | 80 | $20.00 | $9.50 | $9.50 | $9.50 |
| 1670 | Cable-no. 14/7C | LF A A | 750 | $4.00 | $7.73 | $7.73 | $7.73 |
| 1680 | Temp relocation of signal head | EACH A A | 10 | $150.00 | $718.95 | $718.95 | $718.95 |
| 1690 | Install pedestrian head-LED | EACH A A | 4 | $430.00 | $606.82 | $606.82 | $606.82 |
| 1700 | Install pedestrian detector | EACH A A | 4 | $280.00 | $373.96 | $373.96 | $373.96 |
| 1710 | Install signal pedestal | EACH A A | 4 | $4,748.00 | $3,536.03 | $3,536.03 | $3,536.03 |
| 1720 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 80 | $9.00 | $8.23 | $8.23 | $8.23 |
| 1725 | Safeloading | CUYD A A | 85 | $311.00 | $560.00 | $515.00 | $310.00 |
| 1730 | W air release valve 1 inch | EACH A A | 12 | $4,701.00 | $3,870.00 | $7,800.00 | $4,700.00 |
| 1740 | W cap existing main | EACH A A | 15 | $1,701.00 | $2,200.00 | $4,750.00 | $1,700.00 |
| 1750 | W encasement steel bored range 4 | LF A A | 245 | $840.00 | $995.00 | $825.00 | $842.00 |
| 1760 | W encasement steel bored range 5 | LF A A | 155 | $1,490.00 | $1,800.00 | $1,700.00 | $1,495.00 |
| 1770 | W encasement steel bored range 6 | LF A A | 365 | $1,300.00 | $1,600.00 | $1,400.00 | $1,303.00 |
| 1780 | W fire hydrant assembly | EACH A A | 13 | $8,790.00 | $9,000.00 | $12,000 | $8,795.00 |
| 1790 | W fire hydrant remove | EACH A A | 10 | $1,515.00 | $1,035.00 | $1,250.00 | $1,518.00 |
| 1800 | W flushing assembly | EACH A A | 1 | $7,970.00 | $16,600 | $13,000 | $7,972.00 |
| 1810 | W pipe ductile iron 06 inch | LF A A | 5 | $645.00 | $380.00 | $215.00 | $644.00 |
| 1820 | W pipe ductile iron 08 inch | LF A A | 55 | $360.00 | $300.00 | $220.00 | $359.00 |
| 1830 | W pipe ductile iron 12 inch | LF A A | 5,480 | $222.00 | $215.00 | $265.00 | $223.00 |
| 1840 | W pipe ductile iron 16 inch | LF A A | 994 | $351.00 | $390.00 | $290.00 | $350.00 |
| 1850 | W pipe ductile iron 24 inch | LF A A | 466 | $557.00 | $600.00 | $385.00 | $558.00 |
| 1851 | W pipe DCTL iron RSTRND joint 06 in | LF A A | 100 | $235.00 | $75.00 | $215.00 | $231.00 |
| 1852 | W pipe DCTL iron RSTRND joint 08 in | LF A A | 165 | $190.00 | $91.00 | $260.00 | $189.00 |
| 1853 | W pipe DCTL iron RSTRND joint 12 in | LF A A | 207 | $160.00 | $128.00 | $265.00 | $159.00 |
| 1854 | W pipe DCTL iron RSTRND joint 16 in | LF A A | 1,006 | $248.00 | $268.00 | $440.00 | $250.00 |
| 1856 | W pipe DCTL iron RSTRND joint 24 in | LF A A | 380 | $420.00 | $365.00 | $940.00 | $825.00 |
| 1860 | W pipe PVC 08 inch | LF A A | 2,128 | $153.00 | $125.00 | $190.00 | $155.00 |
| 1870 | W plug existing main | EACH A A | 10 | $1,700.00 | $1,625.00 | $4,250.00 | $1,733.00 |
| 1880 | W tie-in 06 inch | EACH A A | 1 | $4,380.00 | $7,040.00 | $8,000.00 | $4,387.00 |
| 1890 | W tie-in 08 inch | EACH A A | 3 | $4,000.00 | $6,940.00 | $8,250.00 | $4,062.00 |
| 1900 | W tie-in 12 inch | EACH A A | 6 | $4,000.00 | $7,400.00 | $8,750.00 | $4,014.00 |
| 1910 | W tie-in 16 inch | EACH A A | 4 | $5,300.00 | $8,750.00 | $10,500 | $5,300.00 |
| 1920 | W tie-in 24 inch | EACH A A | 2 | $7,800.00 | $16,850 | $13,500 | $7,770.00 |
| 1930 | W valve 06 inch | EACH A A | 2 | $3,500.00 | $3,675.00 | $3,000.00 | $3,443.00 |
| 1940 | W valve 08 inch | EACH A A | 11 | $3,800.00 | $3,560.00 | $4,000.00 | $3,843.00 |
| 1950 | W valve 12 inch | EACH A A | 26 | $9,350.00 | $6,180.00 | $7,000.00 | $9,343.00 |
| 1960 | W valve 16 inch | EACH A A | 11 | $20,240 | $21,370 | $25,000 | $20,243 |
| 1970 | W valve 24 inch | EACH A A | 4 | $46,960 | $70,000 | $78,500 | $46,962 |
| 1980 | W serv copper long side 3/4 in | EACH A A | 14 | $4,330.00 | $4,015.00 | $16,000 | $4,330.00 |
| 1990 | W serv copper short side 3/4 in | EACH A A | 36 | $2,450.00 | $3,450.00 | $4,000.00 | $2,476.00 |
| 2000 | W leak detection meter | EACH A A | 3 | $3,260.00 | $3,000.00 | $5,000.00 | $3,263.00 |
| 2010 | Mobilization | LS A A | 1 | $871,100 | $950,000 | $1,095,000 | $1,180,000 |
| 2020 | Demobilization | LS A A | 1 | $287,000 | $320,000 | $339,018 | $375,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 24, 2026. Compiled by Mirage Metrics.