Cleary Construction Inc: KYTC bid record
Cleary Construction Inc submitted 122 bids on Kentucky Transportation Cabinet contracts in the data, from 11 DEC 2020 to 22 OCT 2026, and was the low bidder on 9 of them (7%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $258,312,995
- Latest bid
- 22 OCT 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2023 | 7 | 1 | 14% |
| 2024 | 18 | 2 | 11% |
| 2025 | 62 | 3 | 5% |
| 2026 | 32 | 3 | 9% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 15 | 2 | 13% |
| District 4 | 11 | 0 | 0% |
| District 5 | 6 | 1 | 17% |
| District 2 | 6 | 1 | 17% |
| District 8 | 3 | 0 | 0% |
| District 6 | 3 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
| District 10 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Maintain & control traffic | LS A A | 94 | 60 (64%) | $11,250 | $10,625 | |
| Pave marking-thermo stop bar-24IN | LF A A | 60 | 56 (93%) | $15.00 | $12.50 | |
| Asphalt adjustment | DOLL A A | 55 | 55 (100%) | $1.00 | $1.00 | |
| Fuel adjustment | DOLL A A | 54 | 54 (100%) | $1.00 | $1.00 | |
| Temporary signs | SQFT A A | 73 | 51 (70%) | $5.00 | $6.05 | |
| Mobilization for mill & text | LS A A | 87 | 47 (54%) | $3,500.00 | $3,500.00 | |
| Pave striping-temp paint-4 in | LF A A | 54 | 31 (57%) | $0.31 | $0.16 | |
| Pave striping-perm paint-4 in | LF A A | 31 | 31 (100%) | $0.32 | $0.25 | |
| Edgeline rumble strips | LF A A | 38 | 30 (79%) | $0.26 | $0.26 | |
| Pave marking-thermo curv arrow | EACH A A | 33 | 30 (91%) | $150.00 | $120.00 | |
| Pave striping-perm paint-6 in | LF A A | 29 | 27 (93%) | $0.33 | $0.27 | |
| Pave striping-thermo-6 in W | LF A A | 27 | 25 (93%) | $1.35 | $1.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scotty'S Contracting & Stone LLC | 90 | 85 of 90 |
| Louisville Paving Company Inc | 27 | 20 of 27 |
| Mac Construction & Excavating Inc | 11 | 5 of 11 |
| Hinkle Construction Services LLC | 9 | 6 of 9 |
| Rame Contracting LLC | 8 | 6 of 8 |
| E & B Paving LLC | 7 | 1 of 7 |
| Strawser Construction Inc | 5 | 0 of 5 |
| Flynn Brothers Contracting Inc | 4 | 4 of 4 |
| Rogers Group Inc | 4 | 2 of 4 |
| Scott and Murphy Inc | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-3053 | ASPHALT RESURFACING AUSTIN TRACY RD (KY 87) | 2 of 2 | $857,000 | +9.0% | |
| 22 OCT 2026 | 26-3064 | ASPHALT RESURFACING SANDY CREEK RD (KY 1153) | 2 of 2 | $655,332 | +30% | |
| 22 OCT 2026 | 26-3042 | ASPHALT RESURFACING EMPIRE RD (KY 1296) | 2 of 2 | $350,000 | +2.0% | |
| 22 OCT 2026 | 26-3054 | ASPHALT RESURFACING BRIER CREEK RD (KY 1827) | 2 of 2 | $415,090 | +8.0% | |
| 22 OCT 2026 | 26-3067 | ASPHALT RESURFACING SOUTH GREENSBURG ST (KY 210) | 2 of 2 | $140,550 | +1.0% | |
| 22 OCT 2026 | 26-3055 | ASPHALT RESURFACING KNOB LICK RD (KY 1243) | 2 of 2 | $524,220 | +7.0% | |
| 22 OCT 2026 | 26-3065 | ASPHALT RESURFACING ALLENSVILLE RD (KY 102) | 2 of 2 | $672,650 | +10% | |
| 24 SEP 2026 | 26-1519 | GRADE & DRAIN WITH ASPHALT SURFACE BEULAH CHURCH ROAD (KY 864) | 3 of 4 | $23,525,000 | +16% | |
| 03 SEP 2026 | 26-2030 | ASPHALT RESURFACING MOUNT UNION ROAD (KY 1421) | 2 of 2 | $865,000 | +30% | |
| 03 SEP 2026 | 26-2031 | ASPHALT RESURFACING CANEYVILLE ROAD (KY 185) | 2 of 2 | $517,100 | +11% | |
| 03 SEP 2026 | 26-2096 | ASPHALT RESURFACING BARDSTOWN ROAD (US 31E) | 3 of 3 | $405,700 | +11% | |
| 03 SEP 2026 | 26-3028 | ASPHALT RESURFACING LONOKE RD (KY 571) | 2 of 2 | $344,080 | +12% | |
| 20 AUG 2026 | 26-2131 | ASPHALT RESURFACING BROADWAY ST/GRIDERVILLE RD/HISEVILLE RD (KY 70) | 1 of 2 | $1,450,000 | Low, 0.0% under the second | |
| 20 AUG 2026 | 26-3023 | ASPHALT RESURFACING VARIOUS ROADS IN MUHLENBERG CO | 2 of 2 | $410,000 | +12% | |
| 23 JUL 2026 | 26-1130 | CULVERT REPLACEMENT CULVERT REPLACEMENT ON KY 90 AT MP 10.09 | 1 of 4 | $672,000 | Low, 26% under the second | |
| 23 JUL 2026 | 26-3015 | ASPHALT RESURFACING ROBERTS ROAD (KY 677) | 2 of 2 | $153,140 | +15% | |
| 25 JUN 2026 | 26-4531 | ASPHALT PAVEMENT & ROADWAY REHAB SCOTTSVILLE ROAD (US 31E) | 2 of 2 | $5,975,000 | +41% | |
| 21 MAY 2026 | 26-4513 | ASPHALT RESURFACING LINCOLN PARKWAY (US 31E) | 2 of 3 | $758,330 | +10% | |
| 21 MAY 2026 | 26-4511 | ASPHALT PAVEMENT & ROADWAY REHAB REEDYVILLE RD (KY 185) | 2 of 2 | $5,128,000 | +3.0% | |
| 23 APR 2026 | 26-1510 | WIDENING THREE SPRINGS RD (KY 884) | 2 of 2 | $18,330,000 | +26% | |
| 26 MAR 2026 | 26-1504 | ASPHALT PAVEMENT & ROADWAY REHAB S. MAIN ST. (US 231) | 2 of 2 | $382,600 | +38% | |
| 26 MAR 2026 | 26-1116 | GRADE & DRAIN WITH ASPHALT SURFACE KY 181 | 2 of 2 | $9,862,000 | +22% | |
| 26 MAR 2026 | 26-1505 | GRADE & DRAIN WITH ASPHALT SURFACE KY 393 | 1 of 3 | $66,800,000 | Low, 3.0% under the second | |
| 26 MAR 2026 | 26-2124 | ASPHALT RESURFACING E GL SMITH ST/BEAVER DAM ROAD (US 231) | 2 of 2 | $631,750 | +13% | |
| 26 MAR 2026 | 26-2035 | ASPHALT RESURFACING WEST MAPLE ST/BEAVER DAM ROAD (US 62) | 2 of 2 | $677,320 | +18% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.