KYTC contract 26-1130 bid tabulation
CULVERT REPLACEMENT CULVERT REPLACEMENT ON KY 90 AT MP 10.09. Let by Kentucky Transportation Cabinet on July 23, 2026. 4 bids received; low bid $672,000 by Cleary Construction Inc, -25% against the engineer's estimate of $896,044.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 JUL 2026
- Pay items
- 61
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cleary Construction Inc | $672,000 | Low | -25% |
| 2 | Hinkle Construction Services LLC | $849,658 | +26% | -5.0% |
| 3 | Scott and Murphy Inc | $1,313,699 | +95% | +47% |
| 4 | Haydon Bridge Company Inc | $1,588,915 | +136% | +77% |
Engineer's estimate: $896,044.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cleary Construction Inc | 2. Hinkle Construction Services LLC | 3. Scott and Murphy Inc | 4. Haydon Bridge Company Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 160 | $70.00 | $54.00 | $50.00 | $65.00 |
| 0020 | Crushed aggregate size no 2 | TON A A | 346 | $45.00 | $58.00 | $40.00 | $59.00 |
| 0030 | CL2 asph base 1.00D PG64-22 | TON A A | 130 | $220.00 | $150.00 | $143.00 | $195.00 |
| 0040 | CL2 asph surf 0.38B PG64-22 | TON A A | 30 | $350.00 | $260.00 | $248.00 | $295.00 |
| 0050 | Joint adhesive | LF A A | 128 | $30.00 | $32.00 | $30.00 | $35.00 |
| 0060 | Asphalt material for tack non-tracking | TON A A | 0.13 | $900.00 | $900.00 | $860.00 | $1,000.00 |
| 0070 | Standard curb and gutter | LF A A | 214 | $63.57 | $68.00 | $76.50 | $75.00 |
| 0080 | Roadway excavation | CUYD A A | 345 | $160.00 | $80.00 | $108.00 | $50.00 |
| 0090 | Structure excav-unclassified | CUYD A A | 24 | $150.00 | $35.00 | $80.00 | $120.00 |
| 0100 | Water | MGAL A A | 1 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0110 | Right-of-way monument type 1 | EACH A A | 12 | $192.28 | $230.00 | $335.00 | $270.00 |
| 0120 | Witness post | EACH A A | 6 | $160.79 | $40.00 | $320.00 | $230.00 |
| 0130 | Channel lining class II | TON A A | 50 | $75.00 | $125.00 | $78.00 | $99.00 |
| 0140 | Clearing and grubbing | LS A A | 1 | $33,000 | $71,720 | $15,500 | $295,000 |
| 0150 | Temporary signs | SQFT A A | 320 | $5.00 | $7.80 | $7.50 | $10.00 |
| 0160 | Fabric-geotextile class 1A | SQYD A A | 1,014 | $7.36 | $6.30 | $5.30 | $8.75 |
| 0170 | Retaining wall-gabion | CUYD A A | 24 | $420.00 | $920.00 | $700.00 | $730.00 |
| 0180 | Maintain & control traffic | LS A A | 1 | $35,000 | $50,000 | $126,200 | $50,000 |
| 0190 | Portable changeable message sign | EACH A A | 4 | $1,272.00 | $2,630.00 | $3,450.00 | $3,000.00 |
| 0200 | Temp silt fence | LF A A | 320 | $4.00 | $6.00 | $6.17 | $7.75 |
| 0210 | Silt trap type A | EACH A A | 1 | $300.00 | $150.00 | $410.00 | $250.00 |
| 0220 | Silt trap type B | EACH A A | 1 | $180.00 | $425.00 | $300.00 | $250.00 |
| 0230 | Silt trap type C | EACH A A | 6 | $350.00 | $600.00 | $410.00 | $250.00 |
| 0240 | Clean silt trap type A | EACH A A | 1 | $0.01 | $30.00 | $38.00 | $50.00 |
| 0250 | Clean silt trap type B | EACH A A | 1 | $0.01 | $30.00 | $38.00 | $50.00 |
| 0260 | Clean silt trap type C | EACH A A | 6 | $0.01 | $30.00 | $38.00 | $50.00 |
| 0270 | Sidewalk-4 in concrete | SQYD A A | 140 | $76.38 | $80.00 | $106.00 | $85.00 |
| 0280 | Staking | LS A A | 1 | $35,000 | $8,500.00 | $4,000.00 | $30,000 |
| 0290 | Erosion control blanket | SQYD A A | 625 | $3.14 | $3.30 | $3.14 | $4.50 |
| 0300 | Temp mulch | SQYD A A | 625 | $0.40 | $0.45 | $0.40 | $0.56 |
| 0310 | Temp seeding and protection | SQYD A A | 465 | $0.41 | $0.45 | $0.41 | $0.57 |
| 0320 | Initial fertilizer | TON A A | 0.10 | $1,357.70 | $1,440.00 | $1,357.70 | $2,000.00 |
| 0330 | Maintenance fertilizer | TON A A | 0.10 | $1,357.70 | $1,440.00 | $1,357.70 | $2,000.00 |
| 0340 | Seeding and protection | SQYD A A | 260 | $1.62 | $1.70 | $1.62 | $2.50 |
| 0350 | Sodding | SQYD A A | 90 | $15.65 | $17.00 | $15.65 | $22.00 |
| 0360 | Agricultural limestone | TON A A | 1 | $89.01 | $95.00 | $89.01 | $130.00 |
| 0370 | Pave striping-temp paint-4 in | LF A A | 500 | $1.00 | $1.05 | $1.00 | $1.50 |
| 0380 | Pave striping-perm paint-4 in | LF A A | 256 | $2.00 | $2.10 | $2.00 | $3.00 |
| 0390 | Sawcut pavement | LF A A | 54 | $7.00 | $9.00 | $17.00 | $65.00 |
| 0400 | Longitudinal edge key | LF A A | 54 | $18.53 | $26.00 | $25.00 | $35.00 |
| 0410 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.00 | $50.00 | $1.00 | $1.00 |
| 0420 | Storm sewer pipe-15 in | LF A A | 68 | $100.00 | $195.00 | $155.00 | $275.00 |
| 0430 | Storm sewer pipe-18 in | LF A A | 27 | $125.00 | $250.00 | $160.00 | $350.00 |
| 0440 | Storm sewer pipe-24 in | LF A A | 35 | $200.00 | $250.00 | $165.00 | $475.00 |
| 0450 | Perforated pipe-4 in | LF A A | 30 | $55.00 | $35.00 | $60.00 | $25.00 |
| 0460 | Curb box inlet type A | EACH A A | 2 | $8,500.00 | $8,915.00 | $8,900.00 | $19,500 |
| 0470 | Drop box inlet type 13G | EACH A A | 4 | $5,000.00 | $9,170.00 | $5,775.00 | $11,000 |
| 0480 | Cored hole drainage box con-4 in | EACH A A | 6 | $400.00 | $395.00 | $680.00 | $400.00 |
| 0490 | Structure excav-unclassified | CUYD A A | 435 | $65.00 | $40.00 | $80.00 | $50.00 |
| 0500 | Fabric-geotextile class 2 for pipe | SQYD A A | 198 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0510 | Structure excav-solid rock | CUYD A A | 69 | $195.00 | $140.00 | $350.00 | $140.00 |
| 0520 | Foundation preparation | LS A A | 1 | $32,000 | $64,000 | $485,000 | $350,000 |
| 0530 | Concrete-class A | CUYD A A | 130.60 | $1,275.00 | $1,660.00 | $1,675.00 | $2,350.00 |
| 0540 | Steel reinforcement | LB A A | 13,580 | $1.00 | $1.85 | $2.20 | $2.95 |
| 0550 | Pipeline inspection | LF A A | 130 | $19.25 | $20.00 | $19.25 | $22.00 |
| 0560 | W cap existing main | EACH A A | 2 | $2,750.00 | $5,200.00 | $750.00 | $7,000.00 |
| 0570 | W flush hydrant assembly | EACH A A | 1 | $6,600.00 | $6,510.00 | $10,000 | $8,700.00 |
| 0580 | W pipe ductile iron 06 inch | LF A A | 122 | $150.00 | $445.00 | $462.50 | $600.00 |
| 0590 | W valve cut-in 06 inch | EACH A A | 2 | $8,250.00 | $15,300 | $15,000 | $21,000 |
| 0600 | Pavement repair | SQYD A A | 6 | $265.00 | $430.00 | $405.00 | $450.00 |
| 0610 | Demobilization | LS A A | 1 | $10,539 | $13,000 | $21,000 | $23,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 23, 2026. Compiled by Mirage Metrics.