Haydon Bridge Company Inc: KYTC bid record
Haydon Bridge Company Inc submitted 77 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JUL 2020 to 23 JUL 2026, and was the low bidder on 6 of them (8%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $69,265,714
- Latest bid
- 23 JUL 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 4 | 0 | 0% |
| 2022 | 13 | 0 | 0% |
| 2023 | 27 | 3 | 11% |
| 2024 | 15 | 0 | 0% |
| 2025 | 10 | 3 | 30% |
| 2026 | 7 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 11 | 1 | 9% |
| District 7 | 9 | 0 | 0% |
| District 2 | 9 | 1 | 11% |
| District 4 | 8 | 1 | 13% |
| District 10 | 7 | 0 | 0% |
| District 8 | 6 | 0 | 0% |
| District 5 | 4 | 0 | 0% |
| District 1 | 4 | 0 | 0% |
| District 11 | 2 | 0 | 0% |
| District 6 | 2 | 1 | 50% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete sealing | SF | 70 | 34 (49%) | $2.10 | $3.00 | |
| Delineator for guardrail BI directional white | EACH | 57 | 33 (58%) | $15.00 | $14.19 | |
| Asphalt seal aggregate | TON | 57 | 31 (54%) | $500.00 | $261.98 | |
| Asphalt seal coat | TON | 57 | 27 (47%) | $2,000.00 | $1,370.39 | |
| Guardrail-steel W beam-S face | LF | 50 | 25 (50%) | $45.07 | $38.00 | |
| Asphalt material for tack | TON | 35 | 24 (69%) | $809.66 | $10.00 | |
| Guardrail terminal section no 1 | EACH | 47 | 22 (47%) | $98.08 | $85.06 | |
| CL2 asph base 1.00D PG64-22 | TON | 46 | 18 (39%) | $195.00 | $135.00 | |
| CL2 asph surf 0.38D PG64-22 | TON | 58 | 17 (29%) | $260.00 | $102.95 | |
| Armored edge for concrete | LF | 69 | 16 (23%) | $120.00 | $120.00 | |
| Edge key | LF | 56 | 16 (29%) | $60.68 | $47.55 | |
| Guardrail end treatment type 1 | EACH | 34 | 16 (47%) | $4,408.90 | $3,800.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 27 | 24 of 27 |
| Bush & Burchett Inc | 23 | 17 of 23 |
| Jave LLC | 21 | 15 of 21 |
| Frederick & May Construction Co | 19 | 15 of 19 |
| Scott and Murphy Inc | 19 | 15 of 19 |
| Hinkle Construction Services LLC | 18 | 15 of 18 |
| Central Bridge Co LLC | 14 | 14 of 14 |
| Kay & Kay Contracting LLC | 14 | 13 of 14 |
| Walker Construction & Materials LLC | 10 | 8 of 10 |
| E & B Paving LLC | 9 | 5 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 JUL 2026 | 26-1130 | CULVERT REPLACEMENT CULVERT REPLACEMENT ON KY 90 AT MP 10.09 | 4 of 4 | $1,588,915 | +136% | |
| 23 JUL 2026 | 26-5415 | BRIDGE REPLACEMENT KY 2422 | 5 of 5 | $1,679,232 | +126% | |
| 25 JUN 2026 | 26-5409 | BRIDGE SUPERSTRUCTURE REHAB KY 89 | 3 of 3 | $1,996,159 | +23% | |
| 21 MAY 2026 | 26-1513 | GRADE & DRAIN WITH BRIDGE JCPS ACCESS ROAD | 4 of 4 | $8,872,687 | +39% | |
| 23 APR 2026 | 26-5411 | BRIDGE REPLACEMENT CR 1464 | 8 of 8 | $1,290,543 | +88% | |
| 19 FEB 2026 | 26-5404 | BRIDGE REPLACEMENT KY 32 | 7 of 7 | $3,496,930 | +71% | |
| 29 JAN 2026 | 26-5403 | BRIDGE REPLACEMENT US 60 EB OVER CLEAR CREEK | 5 of 5 | $4,499,869 | +51% | |
| 20 NOV 2025 | 25-5395 | BRIDGE REPLACEMENT KY 289 | 1 of 3 | $3,549,706 | Low, 16% under the second | |
| 23 OCT 2025 | 25-1032 | GRADE, DRAIN & SURFACE WITH BRIDGE I-71 WIDENING | 1 of 2 | $50,294,708 | Low | |
| 25 SEP 2025 | 25-5388 | BRIDGE REPLACEMENT KY 1983 | 2 of 3 | $2,417,485 | +8.0% | |
| 25 SEP 2025 | 25-1118 | BRIDGE WITH GRADE, DRAIN & SURFACE NEW CONNECTION FROM THOMPSON ROAD TO US 23 @ STONECOAL | 2 of 3 | $10,987,754 | +8.0% | |
| 24 JUL 2025 | 25-5382 | BRIDGE REPLACEMENT KY 138 | 4 of 4 | $8,892,890 | +34% | |
| 05 JUN 2025 | 25-2987 | BRIDGE SUPERSTRUCTURE REPLACEMENT BELLS MILL ROAD (KY 1526) | 3 of 4 | $2,769,042 | +7.0% | |
| 05 JUN 2025 | 25-2986 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 217 (HWY 217) | 6 of 6 | $793,622 | +116% | |
| 24 APR 2025 | 25-5376 | District 4 | BRIDGE REPLACEMENT LAWRENCEBURG ROAD (KY 53) | 3 of 4 | $3,126,966 | +21% |
| 20 MAR 2025 | 25-5374 | District 6 | BRIDGE REPLACEMENT KY 36 | 1 of 4 | $2,869,393 | Low, 4.0% under the second |
| 20 FEB 2025 | 25-5370 | District 3 | BRIDGE SUPERSTRUCTURE REPLACEMENT I-165 | 2 of 2 | $22,593,506 | +21% |
| 12 DEC 2024 | 24-1113 | District 8 | BRIDGE WITH GRADE, DRAIN & SURFACE NEW KY 635 (KY 635) | 2 of 5 | $8,496,690 | +14% |
| 24 OCT 2024 | 24-1318 | District 2 | GRADE, DRAIN & SURFACE WITH BRIDGE HARTFORD-SEBREE ROAD (KY 136) | 2 of 2 | $11,533,813 | +20% |
| 24 OCT 2024 | 24-5365 | District 2 | BRIDGE REPLACEMENT KY 143 | 4 of 4 | $1,626,171 | +81% |
| 24 OCT 2024 | 24-2957 | District 4 | BRIDGE REPAIRS BRANDENBURG ROAD (KY 259) | 7 of 7 | $2,316,213 | +64% |
| 22 AUG 2024 | 24-5362 | District 1 | BRIDGE REPLACEMENT KY 166 | 3 of 3 | $1,592,371 | +32% |
| 18 JUL 2024 | 24-5357 | District 5 | BRIDGE REPLACEMENT I-64 | 4 of 4 | $9,354,452 | +40% |
| 20 JUN 2024 | 24-5354 | District 1 | BRIDGE REPLACEMENT KY 402 | 2 of 2 | $9,397,353 | +22% |
| 20 JUN 2024 | 24-5352 | District 4 | BRIDGE REPLACEMENT CS 1041 | 3 of 3 | $798,965 | +40% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way