Haydon Bridge Company Inc: KYTC bid record

Haydon Bridge Company Inc submitted 77 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JUL 2020 to 23 JUL 2026, and was the low bidder on 6 of them (8%). When it was not low, its total sat a median +33% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$69,265,714
Latest bid
23 JUL 2026
Data through
22 OCT 2026
77Bids
6Low bids
8Win rate, percent
+33%Median gap to the low bid when not low, 69 bids

By year

YearBidsLow bidsWin rate
2020100%
2021400%
20221300%
202327311%
20241500%
202510330%
2026700%
Haydon Bridge Company Inc, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 121119%
District 7900%
District 29111%
District 48113%
District 10700%
District 8600%
District 5400%
District 1400%
District 11200%
District 62150%
District 3100%
Haydon Bridge Company Inc, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete sealingSF7034 (49%)$2.10$3.00
Delineator for guardrail BI directional whiteEACH5733 (58%)$15.00$14.19
Asphalt seal aggregateTON5731 (54%)$500.00$261.98
Asphalt seal coatTON5727 (47%)$2,000.00$1,370.39
Guardrail-steel W beam-S faceLF5025 (50%)$45.07$38.00
Asphalt material for tackTON3524 (69%)$809.66$10.00
Guardrail terminal section no 1EACH4722 (47%)$98.08$85.06
CL2 asph base 1.00D PG64-22TON4618 (39%)$195.00$135.00
CL2 asph surf 0.38D PG64-22TON5817 (29%)$260.00$102.95
Armored edge for concreteLF6916 (23%)$120.00$120.00
Edge keyLF5616 (29%)$60.68$47.55
Guardrail end treatment type 1EACH3416 (47%)$4,408.90$3,800.00
Haydon Bridge Company Inc, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Haydon Bridge Company Inc, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 JUL 202626-1130CULVERT REPLACEMENT CULVERT REPLACEMENT ON KY 90 AT MP 10.094 of 4$1,588,915+136%
23 JUL 202626-5415BRIDGE REPLACEMENT KY 24225 of 5$1,679,232+126%
25 JUN 202626-5409BRIDGE SUPERSTRUCTURE REHAB KY 893 of 3$1,996,159+23%
21 MAY 202626-1513GRADE & DRAIN WITH BRIDGE JCPS ACCESS ROAD4 of 4$8,872,687+39%
23 APR 202626-5411BRIDGE REPLACEMENT CR 14648 of 8$1,290,543+88%
19 FEB 202626-5404BRIDGE REPLACEMENT KY 327 of 7$3,496,930+71%
29 JAN 202626-5403BRIDGE REPLACEMENT US 60 EB OVER CLEAR CREEK5 of 5$4,499,869+51%
20 NOV 202525-5395BRIDGE REPLACEMENT KY 2891 of 3$3,549,706Low, 16% under the second
23 OCT 202525-1032GRADE, DRAIN & SURFACE WITH BRIDGE I-71 WIDENING1 of 2$50,294,708Low
25 SEP 202525-5388BRIDGE REPLACEMENT KY 19832 of 3$2,417,485+8.0%
25 SEP 202525-1118BRIDGE WITH GRADE, DRAIN & SURFACE NEW CONNECTION FROM THOMPSON ROAD TO US 23 @ STONECOAL2 of 3$10,987,754+8.0%
24 JUL 202525-5382BRIDGE REPLACEMENT KY 1384 of 4$8,892,890+34%
05 JUN 202525-2987BRIDGE SUPERSTRUCTURE REPLACEMENT BELLS MILL ROAD (KY 1526)3 of 4$2,769,042+7.0%
05 JUN 202525-2986BRIDGE SUPERSTRUCTURE REPLACEMENT KY 217 (HWY 217)6 of 6$793,622+116%
24 APR 202525-5376District 4BRIDGE REPLACEMENT LAWRENCEBURG ROAD (KY 53)3 of 4$3,126,966+21%
20 MAR 202525-5374District 6BRIDGE REPLACEMENT KY 361 of 4$2,869,393Low, 4.0% under the second
20 FEB 202525-5370District 3BRIDGE SUPERSTRUCTURE REPLACEMENT I-1652 of 2$22,593,506+21%
12 DEC 202424-1113District 8BRIDGE WITH GRADE, DRAIN & SURFACE NEW KY 635 (KY 635)2 of 5$8,496,690+14%
24 OCT 202424-1318District 2GRADE, DRAIN & SURFACE WITH BRIDGE HARTFORD-SEBREE ROAD (KY 136)2 of 2$11,533,813+20%
24 OCT 202424-5365District 2BRIDGE REPLACEMENT KY 1434 of 4$1,626,171+81%
24 OCT 202424-2957District 4BRIDGE REPAIRS BRANDENBURG ROAD (KY 259)7 of 7$2,316,213+64%
22 AUG 202424-5362District 1BRIDGE REPLACEMENT KY 1663 of 3$1,592,371+32%
18 JUL 202424-5357District 5BRIDGE REPLACEMENT I-644 of 4$9,354,452+40%
20 JUN 202424-5354District 1BRIDGE REPLACEMENT KY 4022 of 2$9,397,353+22%
20 JUN 202424-5352District 4BRIDGE REPLACEMENT CS 10413 of 3$798,965+40%
Haydon Bridge Company Inc: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy