KYTC contract 26-5415 bid tabulation

BRIDGE REPLACEMENT KY 2422. Let by Kentucky Transportation Cabinet on July 23, 2026. 5 bids received; low bid $743,672 by Jim Smith Contracting Company LLC, -14% against the engineer's estimate of $860,757.

Owner
Kentucky Transportation Cabinet
Letting
23 JUL 2026
Pay items
35
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jim Smith Contracting Company LLC$743,672Low-14%
2Hal Coffey Contracting LLC$794,490+7.0%-8.0%
3Jave LLC$849,857+14%-1.0%
4Hall Contracting of Kentucky Inc$1,258,000+69%+46%
5Haydon Bridge Company Inc$1,679,232+126%+95%
KYTC contract 26-5415: bids by rank

Engineer's estimate: $860,757.

Bid tabulation

LinePay itemUnitQuantity1. Jim Smith Contracting Company LLC2. Hal Coffey Contracting LLC3. Jave LLC4. Hall Contracting of Kentucky Inc5. Haydon Bridge Company Inc
0010Dga baseTON A A158$43.60$48.55$88.83$90.00$95.00
0020CL2 asph base 1.00D PG64-22TON A A144$220.00$160.00$163.20$220.00$350.00
0030CL2 asph surf 0.38D PG64-22TON A A22$320.00$250.00$255.00$320.00$750.00
0040Asphalt material for tackTON A A0.23$950.00$1,500.00$1,530.00$950.00$1,500.00
0050Delineator for G/R BI directional whiteEACH A A4$15.11$15.11$15.41$15.11$21.00
0060Barricade-type IIIEACH A A4$300.00$200.00$102.00$110.00$210.00
0070Embankment in placeCUYD A A432$64.57$85.00$77.86$160.00$90.00
0080G/R-W beam-S face TL-3LF A A100$38.06$38.06$38.82$38.06$52.00
0090G/R end treatment type 7EACH A A4$2,202.09$2,202.09$2,246.13$2,202.09$3,000.00
0100Right-of-way monument type 1EACH A A5$202.85$202.85$206.91$202.85$280.00
0110Witness postEACH A A5$169.74$169.74$173.13$169.74$230.00
0120Clearing and grubbingLS A A1$22,270$44,400$29,113$75,000$495,000
0130Temporary signsSQFT A A70$14.82$15.00$10.20$10.00$17.00
0140Edge keyLF A A39$75.00$90.00$224.40$75.00$500.00
0150Maintain & control trafficLS A A1$608.16$1,200.00$2,040.00$100,000$30,000
0160Portable changeable message signEACH A A2$1.00$4,400.00$3,208.92$3,000.00$3,800.00
0170StakingLS A A1$2,000.00$7,500.00$7,140.00$25,000$18,000
0180Remove structureLS A A1$67,964$56,000$42,483$75,000$150,000
0190Erosion control blanketSQYD A A57$3.50$10.00$11.35$29.45$44.00
0200Pave striping-perm paint-4 inLF A A412$2.00$2.00$2.04$3.00$2.75
0210Foundation preparationLS A A1$27,876$9,575.00$38,595$50,000$65,000
0220Erosion controlLS A A1$5,000.00$6,250.00$5,675.00$10,000$11,000
0230Structure granular backfillCUYD A A76$100.09$150.00$146.42$150.00$120.00
0240Armored edge for concreteLF A A48$77.52$115.00$130.53$130.00$150.00
0250Cyclopean stone rip rapTON A A305$40.57$55.50$84.33$90.00$77.00
0260Test pilesLF A A130$343.42$325.00$201.04$350.00$370.00
0270Piles-steel HP14X89LF A A590$125.53$140.00$201.04$300.00$190.00
0280Concrete-class ACUYD A A41.70$872.41$2,000.00$1,906.80$2,100.00$1,800.00
0290Concrete-class AACUYD A A28.80$2,715.33$2,000.00$1,941.08$3,000.00$3,700.00
0300Steel reinforcement-epoxy coatedLB A A7,329$2.25$2.35$2.89$3.50$3.00
0310Precast PC box beam CB27-48LF A A420$482.82$465.00$504.80$590.00$620.00
0320Concrete sealingSQFT A A2,690$2.00$1.35$2.69$2.30$2.00
0330Rail system side mounted MGSLF A A140$216.94$245.00$236.60$210.00$290.00
0340DemobilizationLS A A1$10,991$15,045$12,559$18,906$25,000
0350Mobilization for concrete surf treatmentLS A A1$500.00$1,000.00$5,675.00$3,700.00$1,500.00
KYTC contract 26-5415: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of July 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy