Jave LLC: KYTC bid record

Jave LLC submitted 120 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 22 OCT 2026, and was the low bidder on 15 of them (13%). When it was not low, its total sat a median +22% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$14,019,821
Latest bid
22 OCT 2026
Data through
22 OCT 2026
120Bids
15Low bids
13Win rate, percent
+22%Median gap to the low bid when not low, 105 bids

By year

YearBidsLow bidsWin rate
2019100%
202015213%
202112217%
202212217%
202328518%
20242500%
202518317%
20269111%
Jave LLC, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 122727%
District 1118422%
District 811327%
District 108113%
District 77114%
District 4600%
District 6600%
District 9500%
District 3300%
District 5300%
District 2200%
Jave LLC, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary signsSF3421 (62%)$9.42$6.50
Barricade-type IIIEACH4320 (47%)$121.00$150.00
Armored edge for concreteLF9117 (19%)$112.17$120.00
Concrete-class AACY9316 (17%)$2,231.54$1,716.02
Temporary signsSQFT A A2014 (70%)$7.71$6.05
Concrete-class ACY10512 (11%)$1,250.00$1,088.01
Maintain & control trafficLS A A2311 (48%)$9,035.00$10,625
Agricultural limestoneTON3710 (27%)$104.00$100.00
Roadway excavationCY369 (25%)$51.89$40.69
Foundation preparationLS A A229 (41%)$38,811$46,794
Barricade-type IIIEACH A A189 (50%)$103.00$175.00
Seeding and protectionSY388 (21%)$2.52$0.85
Jave LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Jave LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-5417BRIDGE REPLACEMENT KY 795 OVER CHESTNUT CREEK3 of 5$1,266,986+29%
20 AUG 202626-5416BRIDGE SUPERSTRUCTURE REPLACEMENT KY 611 of 3$819,057Low, 1.0% under the second
23 JUL 202626-5415BRIDGE REPLACEMENT KY 24223 of 5$849,857+14%
21 MAY 202626-5414BRIDGE REPLACEMENT CR 10863 of 3$771,219+7.0%
23 APR 202626-5410BRIDGE REPLACEMENT CR 14014 of 6$662,420+21%
23 APR 202626-5411BRIDGE REPLACEMENT CR 14646 of 8$921,248+34%
23 APR 202626-5413BRIDGE REPLACEMENT KY 11027 of 8$912,658+47%
26 MAR 202626-5408BRIDGE REPLACEMENT KY 793 of 3$2,704,802+6.0%
26 MAR 202626-5407BRIDGE REPLACEMENT VARIOUS ROUTES IN GRAVES COUNTY3 of 4$1,321,519+10%
11 DEC 202525-5400BRIDGE REPLACEMENT KY 10463 of 7$927,058+14%
11 DEC 202525-1037BRIDGE WITH GRADE, DRAIN & SURFACE CR-11692 of 5$1,245,6580.0%
20 NOV 202525-5394BRIDGE REPLACEMENT VAN CLEAVE ROAD3 of 4$700,640+8.0%
20 NOV 202525-5396BRIDGE REPLACEMENT KY 903 of 4$1,297,778+24%
20 NOV 202525-5398BRIDGE REPLACEMENT CR 11271 of 3$1,389,701Low, 6.0% under the second
20 NOV 202525-5395BRIDGE REPLACEMENT KY 2892 of 3$4,120,918+16%
25 SEP 202525-5391BRIDGE REPLACEMENT CR 11172 of 4$610,338+23%
25 SEP 202525-5390BRIDGE REPLACEMENT KY 2101 of 4$1,465,277Low, 13% under the second
25 SEP 202525-5392BRIDGE REPLACEMENT KY 20572 of 2$1,754,355+4.0%
25 SEP 202525-5389BRIDGE REPLACEMENT CR 11105 of 6$769,304+16%
25 SEP 202525-2930BRIDGE SCOUR MITIGATION CORN CREEK ROAD (KY 1838)1 of 3$208,826Low, 157% under the second
21 AUG 202525-5386BRIDGE REPLACEMENT CS 10413 of 3$2,995,675+23%
21 AUG 202525-2981BRIDGE SUPERSTRUCTURE REPLACEMENT SOUTH PROPERTY ROAD (KY 573)4 of 5$417,470+28%
21 AUG 202525-2988BRIDGE REPLACEMENT STATE HWY 3630 (KY 3630)4 of 7$761,127+17%
24 APR 202525-5380District 11BRIDGE REPLACEMENT OTTER CREEK ROAD (CR 1160)4 of 5$432,597+100%
24 APR 202525-2985District 11BRIDGE REPLACEMENT STATE HWY 687 (KY 687)4 of 4$1,093,954+33%
Jave LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy