KYTC contract 26-5413 bid tabulation
BRIDGE REPLACEMENT KY 1102. Let by Kentucky Transportation Cabinet on April 23, 2026. 8 bids received; low bid $622,765 by Landmark Construction LLC, -31% against the engineer's estimate of $904,270.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 39
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Landmark Construction LLC | $622,765 | Low | -31% |
| 2 | Central Bridge Co LLC | $691,687 | +11% | -24% |
| 3 | Frederick & May Construction Co | $712,223 | +14% | -21% |
| 4 | Hinkle Construction Services LLC | $799,993 | +28% | -12% |
| 5 | Bush & Burchett Inc | $843,294 | +35% | -7.0% |
| 6 | Boca Enterprises Inc | $879,209 | +41% | -3.0% |
| 7 | Jave LLC | $912,658 | +47% | +1.0% |
| 8 | Adams Contracting LLC | $1,132,293 | +82% | +25% |
Engineer's estimate: $904,270.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Landmark Construction LLC | 2. Central Bridge Co LLC | 3. Frederick & May Construction Co | 4. Hinkle Construction Services LLC | 5. Bush & Burchett Inc | 6. Boca Enterprises Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 115 | $115.75 | $100.00 | $115.75 | $120.00 | $115.75 | $115.75 |
| 0020 | Asphalt seal aggregate | TON A A | 0.45 | $3,870.00 | $3,870.00 | $3,870.00 | $4,070.00 | $3,870.00 | $3,870.00 |
| 0030 | Asphalt seal coat | TON A A | 0.05 | $27,150 | $27,150 | $27,150 | $28,570 | $27,150 | $27,150 |
| 0040 | CL2 asph base 0.75D PG64-22 | TON A A | 82 | $366.50 | $366.50 | $366.50 | $385.00 | $366.50 | $366.50 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A A | 25 | $378.45 | $378.45 | $378.45 | $400.00 | $378.45 | $378.45 |
| 0060 | Edge key | LF A A | 40 | $75.50 | $75.50 | $75.50 | $79.00 | $75.50 | $75.50 |
| 0070 | Asphalt material for tack non-tracking | TON A A | 0.24 | $2,100.00 | $2,100.00 | $2,100.00 | $2,210.00 | $2,100.00 | $2,100.00 |
| 0080 | Delineator for G/R BI directional white | EACH A A | 4 | $15.11 | $15.11 | $15.11 | $11.00 | $15.11 | $13.00 |
| 0090 | Barricade-type III | EACH A A | 4 | $100.00 | $200.00 | $250.00 | $140.00 | $200.00 | $200.00 |
| 0100 | Roadway excavation | CUYD A A | 47 | $100.00 | $64.00 | $100.00 | $45.00 | $75.00 | $85.00 |
| 0110 | G/R-steel W beam-S face | LF A A | 82.50 | $37.53 | $37.53 | $37.53 | $34.00 | $37.53 | $38.00 |
| 0120 | G/R-steel W beam-S face A | LF A A | 107.50 | $68.71 | $68.71 | $68.71 | $66.00 | $68.71 | $55.25 |
| 0130 | G/R terminal section no 1 | EACH A A | 2 | $9.69 | $90.69 | $90.69 | $62.00 | $90.69 | $95.00 |
| 0140 | G/R end treatment type 1 | EACH A A | 2 | $4,213.70 | $4,213.70 | $4,213.70 | $3,810.00 | $4,213.70 | $3,800.00 |
| 0150 | Right-of-way monument type 1 | EACH A A | 4 | $155.25 | $155.25 | $155.25 | $285.00 | $155.25 | $170.00 |
| 0160 | Witness post | EACH A A | 3 | $199.83 | $199.83 | $199.83 | $33.00 | $199.83 | $145.00 |
| 0170 | Clearing and grubbing | LS A A | 1 | $3,500.00 | $15,000 | $35,051 | $5,200.00 | $50,000 | $8,500.00 |
| 0180 | Temporary signs | SQFT A A | 406 | $12.00 | $15.00 | $16.00 | $14.00 | $15.00 | $25.00 |
| 0190 | Maintain & control traffic | LS A A | 1 | $5,000.00 | $14,500 | $5,000.00 | $70,000 | $10,000 | $15,000 |
| 0200 | Portable changeable message sign | EACH A A | 2 | $8,400.00 | $2,800.00 | $3,500.00 | $2,470.00 | $1,500.00 | $5,000.00 |
| 0210 | Staking | LS A A | 1 | $2,500.00 | $4,250.00 | $7,500.00 | $4,600.00 | $10,000 | $10,000 |
| 0220 | Pave striping-perm paint-4 in | LF A A | 300 | $2.84 | $2.84 | $2.83 | $2.10 | $2.00 | $4.50 |
| 0230 | Object marker TY 3 | EACH A A | 2 | $29.60 | $29.60 | $29.60 | $85.00 | $29.60 | $110.00 |
| 0240 | Erosion control | LS A A | 1 | $2,500.00 | $7,500.00 | $5,000.00 | $5,230.00 | $7,000.00 | $7,500.00 |
| 0250 | Structure granular backfill | CUYD A A | 240.10 | $72.00 | $105.00 | $85.00 | $160.00 | $100.00 | $105.00 |
| 0260 | Remove structure | LS A A | 1 | $15,000 | $31,000 | $25,000 | $26,640 | $75,000 | $15,000 |
| 0270 | Armored edge for concrete | LF A A | 68 | $79.00 | $90.00 | $75.00 | $80.00 | $150.00 | $120.00 |
| 0280 | Structure excav-solid rock | CUYD A A | 175 | $123.00 | $112.50 | $85.00 | $115.00 | $75.00 | $185.00 |
| 0290 | Foundation preparation | LS A A | 1 | $67,000 | $62,000 | $65,000 | $69,770 | $40,000 | $125,000 |
| 0300 | Cyclopean stone rip rap | TON A A | 70 | $62.00 | $98.00 | $80.00 | $150.00 | $75.00 | $75.00 |
| 0310 | Concrete-class A | CUYD A A | 211 | $900.00 | $950.00 | $1,020.00 | $1,100.00 | $1,250.00 | $1,500.00 |
| 0320 | Concrete-class AA | CUYD A A | 14 | $1,800.00 | $2,475.00 | $2,230.00 | $3,600.00 | $3,200.00 | $1,500.00 |
| 0330 | Steel reinforcement | LB A A | 22,465 | $1.85 | $1.98 | $1.32 | $1.80 | $2.25 | $2.00 |
| 0340 | Steel reinforcement-epoxy coated | LB A A | 1,663 | $2.00 | $2.59 | $3.83 | $1.90 | $3.00 | $2.75 |
| 0350 | Precast PC box beam CB12-48 | LF A A | 204 | $370.00 | $402.00 | $500.00 | $425.00 | $500.00 | $441.00 |
| 0360 | Concrete sealing | SQFT A A | 2,546 | $2.00 | $2.35 | $3.00 | $2.25 | $2.00 | $2.50 |
| 0370 | Deep beam bridge G/R | LF A A | 68 | $303.48 | $303.48 | $303.48 | $250.00 | $303.48 | $358.70 |
| 0375 | Mobilization for concrete surf treatment | LS A A | 1 | $1,000.00 | $2,375.00 | $500.00 | $1,300.00 | $500.00 | $2,500.00 |
| 0380 | Demobilization | LS A A | 1 | $9,204.00 | $10,250 | $10,526 | $11,900 | $12,500 | $12,995 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.