KYTC contract 26-5413 bid tabulation

BRIDGE REPLACEMENT KY 1102. Let by Kentucky Transportation Cabinet on April 23, 2026. 8 bids received; low bid $622,765 by Landmark Construction LLC, -31% against the engineer's estimate of $904,270.

Owner
Kentucky Transportation Cabinet
Letting
23 APR 2026
Pay items
39
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Landmark Construction LLC$622,765Low-31%
2Central Bridge Co LLC$691,687+11%-24%
3Frederick & May Construction Co$712,223+14%-21%
4Hinkle Construction Services LLC$799,993+28%-12%
5Bush & Burchett Inc$843,294+35%-7.0%
6Boca Enterprises Inc$879,209+41%-3.0%
7Jave LLC$912,658+47%+1.0%
8Adams Contracting LLC$1,132,293+82%+25%
KYTC contract 26-5413: bids by rank

Engineer's estimate: $904,270.

Bid tabulation

LinePay itemUnitQuantity1. Landmark Construction LLC2. Central Bridge Co LLC3. Frederick & May Construction Co4. Hinkle Construction Services LLC5. Bush & Burchett Inc6. Boca Enterprises Inc
0010Crushed stone baseTON A A115$115.75$100.00$115.75$120.00$115.75$115.75
0020Asphalt seal aggregateTON A A0.45$3,870.00$3,870.00$3,870.00$4,070.00$3,870.00$3,870.00
0030Asphalt seal coatTON A A0.05$27,150$27,150$27,150$28,570$27,150$27,150
0040CL2 asph base 0.75D PG64-22TON A A82$366.50$366.50$366.50$385.00$366.50$366.50
0050CL2 asph surf 0.38D PG64-22TON A A25$378.45$378.45$378.45$400.00$378.45$378.45
0060Edge keyLF A A40$75.50$75.50$75.50$79.00$75.50$75.50
0070Asphalt material for tack non-trackingTON A A0.24$2,100.00$2,100.00$2,100.00$2,210.00$2,100.00$2,100.00
0080Delineator for G/R BI directional whiteEACH A A4$15.11$15.11$15.11$11.00$15.11$13.00
0090Barricade-type IIIEACH A A4$100.00$200.00$250.00$140.00$200.00$200.00
0100Roadway excavationCUYD A A47$100.00$64.00$100.00$45.00$75.00$85.00
0110G/R-steel W beam-S faceLF A A82.50$37.53$37.53$37.53$34.00$37.53$38.00
0120G/R-steel W beam-S face ALF A A107.50$68.71$68.71$68.71$66.00$68.71$55.25
0130G/R terminal section no 1EACH A A2$9.69$90.69$90.69$62.00$90.69$95.00
0140G/R end treatment type 1EACH A A2$4,213.70$4,213.70$4,213.70$3,810.00$4,213.70$3,800.00
0150Right-of-way monument type 1EACH A A4$155.25$155.25$155.25$285.00$155.25$170.00
0160Witness postEACH A A3$199.83$199.83$199.83$33.00$199.83$145.00
0170Clearing and grubbingLS A A1$3,500.00$15,000$35,051$5,200.00$50,000$8,500.00
0180Temporary signsSQFT A A406$12.00$15.00$16.00$14.00$15.00$25.00
0190Maintain & control trafficLS A A1$5,000.00$14,500$5,000.00$70,000$10,000$15,000
0200Portable changeable message signEACH A A2$8,400.00$2,800.00$3,500.00$2,470.00$1,500.00$5,000.00
0210StakingLS A A1$2,500.00$4,250.00$7,500.00$4,600.00$10,000$10,000
0220Pave striping-perm paint-4 inLF A A300$2.84$2.84$2.83$2.10$2.00$4.50
0230Object marker TY 3EACH A A2$29.60$29.60$29.60$85.00$29.60$110.00
0240Erosion controlLS A A1$2,500.00$7,500.00$5,000.00$5,230.00$7,000.00$7,500.00
0250Structure granular backfillCUYD A A240.10$72.00$105.00$85.00$160.00$100.00$105.00
0260Remove structureLS A A1$15,000$31,000$25,000$26,640$75,000$15,000
0270Armored edge for concreteLF A A68$79.00$90.00$75.00$80.00$150.00$120.00
0280Structure excav-solid rockCUYD A A175$123.00$112.50$85.00$115.00$75.00$185.00
0290Foundation preparationLS A A1$67,000$62,000$65,000$69,770$40,000$125,000
0300Cyclopean stone rip rapTON A A70$62.00$98.00$80.00$150.00$75.00$75.00
0310Concrete-class ACUYD A A211$900.00$950.00$1,020.00$1,100.00$1,250.00$1,500.00
0320Concrete-class AACUYD A A14$1,800.00$2,475.00$2,230.00$3,600.00$3,200.00$1,500.00
0330Steel reinforcementLB A A22,465$1.85$1.98$1.32$1.80$2.25$2.00
0340Steel reinforcement-epoxy coatedLB A A1,663$2.00$2.59$3.83$1.90$3.00$2.75
0350Precast PC box beam CB12-48LF A A204$370.00$402.00$500.00$425.00$500.00$441.00
0360Concrete sealingSQFT A A2,546$2.00$2.35$3.00$2.25$2.00$2.50
0370Deep beam bridge G/RLF A A68$303.48$303.48$303.48$250.00$303.48$358.70
0375Mobilization for concrete surf treatmentLS A A1$1,000.00$2,375.00$500.00$1,300.00$500.00$2,500.00
0380DemobilizationLS A A1$9,204.00$10,250$10,526$11,900$12,500$12,995
KYTC contract 26-5413: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy