Bush & Burchett Inc: KYTC bid record
Bush & Burchett Inc submitted 112 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 25 JUN 2026, and was the low bidder on 17 of them (15%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $81,004,491
- Latest bid
- 25 JUN 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2020 | 9 | 1 | 11% |
| 2021 | 22 | 4 | 18% |
| 2022 | 10 | 1 | 10% |
| 2023 | 16 | 1 | 6% |
| 2024 | 25 | 5 | 20% |
| 2025 | 21 | 2 | 10% |
| 2026 | 8 | 3 | 38% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 35 | 8 | 23% |
| District 11 | 18 | 3 | 17% |
| District 10 | 17 | 0 | 0% |
| District 9 | 9 | 0 | 0% |
| District 7 | 6 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
| District 8 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable changeable message sign | EACH | 66 | 45 (68%) | $1,500.00 | $1,750.00 | |
| Asphalt material for tack | TON | 36 | 35 (97%) | $375.00 | $10.00 | |
| Delineator for guardrail BI directional white | EACH | 61 | 34 (56%) | $13.73 | $14.19 | |
| Steel reinforcement-epoxy coated | LB | 79 | 30 (38%) | $2.00 | $2.00 | |
| Guardrail terminal section no 1 | EACH | 63 | 29 (46%) | $85.42 | $85.06 | |
| Cyclopean stone rip rap | TON | 59 | 27 (46%) | $50.00 | $60.00 | |
| Temp seeding and protection | SY | 34 | 27 (79%) | $0.26 | $0.30 | |
| Temp mulch | SY | 34 | 25 (74%) | $0.25 | $0.28 | |
| Concrete sealing | SF | 74 | 24 (32%) | $3.00 | $3.00 | |
| Guardrail-steel W beam-S face | LF | 50 | 24 (48%) | $41.50 | $38.00 | |
| Dga base | TON | 52 | 23 (44%) | $55.50 | $45.00 | |
| Maintenance fertilizer | TON | 34 | 23 (68%) | $1,225.00 | $1,248.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 64 | 51 of 64 |
| Frederick & May Construction Co | 59 | 41 of 59 |
| Jave LLC | 45 | 21 of 45 |
| Hinkle Construction Services LLC | 38 | 20 of 38 |
| Walker Construction & Materials LLC | 34 | 24 of 34 |
| Kay & Kay Contracting LLC | 27 | 19 of 27 |
| Central Bridge Co LLC | 24 | 20 of 24 |
| Haydon Bridge Company Inc | 23 | 6 of 23 |
| Intech Contracting LLC | 13 | 11 of 13 |
| Delong Concrete LLC | 11 | 7 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 JUN 2026 | 26-5409 | BRIDGE SUPERSTRUCTURE REHAB KY 89 | 2 of 3 | $1,669,120 | +3.0% | |
| 21 MAY 2026 | 26-1509 | GRADE & DRAIN WITH ASPHALT SURFACE MUD CREEK ROAD (KY 979) | 1 of 2 | $4,826,985 | Low, 2.0% under the second | |
| 21 MAY 2026 | 26-1513 | GRADE & DRAIN WITH BRIDGE JCPS ACCESS ROAD | 3 of 4 | $7,731,086 | +22% | |
| 23 APR 2026 | 26-5411 | BRIDGE REPLACEMENT CR 1464 | 5 of 8 | $856,252 | +25% | |
| 23 APR 2026 | 26-5413 | BRIDGE REPLACEMENT KY 1102 | 5 of 8 | $843,294 | +35% | |
| 19 FEB 2026 | 26-5404 | BRIDGE REPLACEMENT KY 32 | 5 of 7 | $2,793,402 | +36% | |
| 19 FEB 2026 | 26-5406 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN DISTRICT 12 | 1 of 4 | $1,943,260 | Low, 16% under the second | |
| 29 JAN 2026 | 26-5401 | BRIDGE REPLACEMENT KY 78 OVER HANGING FORK CREEK | 1 of 2 | $3,291,802 | Low, 24% under the second | |
| 11 DEC 2025 | 25-5399 | BRIDGE REPLACEMENT KY 292 | 2 of 5 | $3,275,326 | +3.0% | |
| 11 DEC 2025 | 25-1037 | BRIDGE WITH GRADE, DRAIN & SURFACE CR-1169 | 4 of 5 | $1,430,126 | +15% | |
| 20 NOV 2025 | 25-5398 | BRIDGE REPLACEMENT CR 1127 | 3 of 3 | $2,188,166 | +57% | |
| 23 OCT 2025 | 25-2965 | BRIDGE DECK RESTORATION & WATERPROOFING EAST MADISON STREET (KY 3) | 6 of 6 | $2,292,140 | +73% | |
| 23 OCT 2025 | 25-3123 | GRADE & DRAIN KY 466 (KY 466) | 6 of 7 | $468,158 | +60% | |
| 25 SEP 2025 | 25-5391 | BRIDGE REPLACEMENT CR 1117 | 3 of 4 | $612,309 | +24% | |
| 25 SEP 2025 | 25-2979 | BRIDGE REPAIR MISCELLANEOUS WORK ROBERT H. FOGLESONG BRIDGE OVER TUG FORK AND NS RR (US 119) | 4 of 7 | $3,016,200 | +18% | |
| 25 SEP 2025 | 25-1118 | BRIDGE WITH GRADE, DRAIN & SURFACE NEW CONNECTION FROM THOMPSON ROAD TO US 23 @ STONECOAL | 1 of 3 | $10,213,906 | Low, 8.0% under the second | |
| 21 AUG 2025 | 25-5386 | BRIDGE REPLACEMENT CS 1041 | 2 of 3 | $2,883,780 | +18% | |
| 21 AUG 2025 | 25-2988 | BRIDGE REPLACEMENT STATE HWY 3630 (KY 3630) | 2 of 7 | $716,291 | +10% | |
| 24 JUL 2025 | 25-5383 | BRIDGE REPLACEMENT KY 539 | 3 of 4 | $2,225,616 | +43% | |
| 24 JUL 2025 | 25-5384 | BRIDGE SUPERSTRUCTURE REPLACEMENT CR 1385 | 1 of 4 | $381,919 | Low, 5.0% under the second | |
| 24 JUL 2025 | 25-1317 | GRADE, DRAIN & SURFACE WITH BRIDGE KY 52 | 2 of 3 | $5,193,647 | +15% | |
| 05 JUN 2025 | 25-2986 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 217 (HWY 217) | 4 of 6 | $488,291 | +33% | |
| 22 MAY 2025 | 25-1310 | BRIDGE REPLACEMENT SETSER BRANCH ROAD (CR 1215) | 4 of 5 | $595,041 | +8.0% | |
| 24 APR 2025 | 25-5337 | District 9 | BRIDGE WITH GRADE, DRAIN & SURFACE GOLLIHUE ROAD (CR 1197) | 2 of 3 | $1,310,235 | +20% |
| 20 MAR 2025 | 25-2980 | District 12 | BRIDGE SUPERSTRUCTURE REPLACEMENT STATE HWY 1 (KY 1) | 2 of 2 | $1,217,385 | +2.0% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.