KYTC contract 25-1317 bid tabulation

GRADE, DRAIN & SURFACE WITH BRIDGE KY 52. Let by Kentucky Transportation Cabinet on July 24, 2025. 3 bids received; low bid $4,519,238 by Frederick & May Construction Co, -32% against the engineer's estimate of $6,602,282.

Owner
Kentucky Transportation Cabinet
Letting
24 JUL 2025
Pay items
128
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Frederick & May Construction Co$4,519,238Low-32%
2Bush & Burchett Inc$5,193,647+15%-21%
3Walker Construction & Materials LLC$5,678,765+26%-14%
KYTC contract 25-1317: bids by rank

Engineer's estimate: $6,602,282.

Bid tabulation

LinePay itemUnitQuantity1. Frederick & May Construction Co2. Bush & Burchett Inc3. Walker Construction & Materials LLC
0010Crushed stone baseTON A A2,287$41.85$41.85$41.85
0020Traffic bound baseTON A A500$34.00$40.00$40.00
0030Crushed aggregate size no 2TON A A2,403$38.00$40.00$45.00
0040Asphalt seal aggregateTON A A83$130.00$130.00$130.00
0050Asphalt seal coatTON A A10$800.00$800.00$800.00
0060Leveling & wedging PG64-22TON A A416$149.35$149.35$149.35
0070CL2 asph base 1.00D PG64-22TON A A1,380$144.35$144.35$144.35
0080CL2 asph surf 0.38D PG64-22TON A A906$149.35$149.35$149.35
0090Asphalt pave milling & texturingTON A A3,976$28.65$28.65$28.65
0100Joint adhesiveLF A A1,725$3.50$3.50$3.50
0110Asphalt material for tack non-trackingTON A A4$300.00$300.00$300.00
0120Entrance pipe-18 inLF A A54$50.00$85.00$100.00
0130Culvert pipe-18 inLF A A85$85.00$100.00$250.00
0140Pipe culvert headwall-18 inEACH A A1$1,600.00$1,500.00$2,575.00
0150Safety box inlet-18 in DBL SDB-5EACH A A1$6,000.00$8,000.00$8,000.00
0160Delineator for guardrail BI directional whiteEACH A A59$12.00$12.00$12.00
0170Barricade-type IIIEACH A A4$100.00$200.00$160.00
0180Temp ditchLF A A1,200$1.00$2.00$0.50
0190Clean temp ditchLF A A600$0.10$1.00$0.25
0200Roadway excavationCUYD A A17,820$8.00$15.00$18.00
0210Embankment in placeCUYD A A12,962$5.00$18.00$1.00
0220WaterMGAL A A25$1.00$100.00$1.00
0230Guardrail terminal section no 1EACH A A6$85.00$85.00$85.00
0240Guardrail end treatment type 1EACH A A6$3,500.00$3,500.00$3,500.00
0250Guardrail end treatment type 7EACH A A12$1,700.00$1,700.00$1,700.00
0260Temp guardrailLF A A2,150$10.50$10.50$10.50
0270Right-of-way monument type 1EACH A A17$200.00$200.00$250.00
0280Witness postEACH A A17$200.00$150.00$200.00
0290Channel lining class IITON A A210$45.00$45.00$55.00
0300Channel lining class IIITON A A1,984$46.00$50.00$50.00
0310Clearing and grubbingLS A A1$15,000$32,000$150,000
0320Temporary signsSQFT A A400$16.00$15.00$14.84
0330Object marker type 2EACH A A12$185.00$185.00$200.00
0340Edge keyLF A A44$44.15$44.15$44.15
0350Fabric-geotextile class 1SQYD A A5,850$2.25$2.00$2.00
0360Fabric-geotextile class 2SQYD A A2,000$2.00$2.00$2.00
0370Fabric-geotextile class 1ASQYD A A4,875$3.25$4.00$4.50
0380Fabric-geotextile class 2 for pipeSQYD A A133$2.00$2.00$2.00
0390Maintain & control trafficLS A A1$65,500$30,000$75,000
0400Diversions (by-pass detours)LS A A1$160,000$125,000$250,000
0410Diversions (by-pass detours)LS A A1$60,000$40,000$95,000
0420Diversions (by-pass detours)LS A A1$60,000$55,000$95,000
0430Portable changeable message signEACH A A2$9,000.00$9,000.00$9,200.00
0440Mobilization for mill & textLS A A1$22,500$22,500$22,500
0450Edgeline rumble stripsLF A A3,560$1.00$1.10$1.10
0460Temp silt fenceLF A A1,200$2.00$4.00$3.85
0470Silt trap type AEACH A A12$50.00$200.00$100.00
0480Silt trap type BEACH A A12$50.00$200.00$100.00
0490Silt trap type CEACH A A12$50.00$200.00$100.00
0500Clean silt trap type AEACH A A12$10.00$50.00$10.00
0510Clean silt trap type BEACH A A12$10.00$50.00$10.00
0520Clean silt trap type CEACH A A12$10.00$50.00$10.00
0530StakingLS A A1$25,000$18,000$50,000
0540Temp signal 2 phaseEACH A A1$40,000$15,000$40,000
0550Erosion control blanketSQYD A A11,535$2.05$2.05$2.05
0560Temp mulchSQYD A A38,000$0.33$0.33$0.33
0570Temp seeding and protectionSQYD A A28,500$0.35$0.35$0.35
0580Initial fertilizerTON A A6$950.00$950.00$950.00
0590Maintenance fertilizerTON A A6$1,600.00$1,600.00$1,600.00
0600Seeding and protectionSQYD A A46,000$0.57$0.57$0.57
0610Agricultural limestoneTON A A35$110.00$110.00$110.00
0620SBM alum sheet signs .080 inSQFT A A6$50.00$50.00$50.00
0630SBM alum sheet signs .125 inSQFT A A6$50.00$50.00$50.00
0640Steel post type 1LF A A203$25.00$25.00$25.00
0650Steel post mile markersEACH A A2$275.00$275.00$275.00
0660Pave striping-temp paint-6 inLF A A11,840$0.25$0.25$0.25
0670Pave striping-perm paint-6 inLF A A6,357$0.45$0.45$0.45
0680Pave striping-dur TY 1-6 in WLF A A740$11.00$11.00$11.00
0690Pave striping-dur TY 1-6 in YLF A A546$11.00$11.00$11.00
0700Fuel adjustmentDOLL A A6,000$1.00$1.00$1.00
0710Object marker TY 3EACH A A6$60.00$60.00$60.00
0720High slump 3000 psi groutCUYD A A5$800.00$650.00$750.00
0730Longitudinal edge keyLF A A1,825$6.75$6.75$6.75
0740G/R steel W beam-S face (7 FT post)LF A A2,400$29.50$29.50$29.50
0750Water blasting existing stripeLF A A8,600$0.40$0.40$0.75
0760Enhanced silt trapEACH A A3$5,000.00$600.00$2,000.00
0770Clean enhanced silt trapEACH A A15$100.00$200.00$97.00
0780Thrie beam guardrail transition TL-3EACH A A12$4,870.00$3,400.00$4,800.00
0790Electronic delivery MGMT system - aggLS A A1$100.00$1.00$1,000.00
0800Structure granular backfillCUYD A A416$56.00$75.00$70.00
0810Armored edge for concreteLF A A68.80$150.00$100.00$100.00
0820Structure excav-solid rockCUYD A A245$80.00$50.00$70.00
0830Foundation preparationLS A A1$10,000$85,000$35,000
0840Cyclopean stone rip rapTON A A1,136$48.00$51.00$65.00
0850Test pilesLF A A52$115.00$200.00$110.00
0860Pre-drilling for pilesLF A A90$450.00$350.00$472.00
0870Piles-steel HP12X53LF A A368$105.00$100.00$110.00
0880Pile points-12 inEACH A A9$225.00$150.00$155.00
0890Concrete-class ACUYD A A67.70$795.00$950.00$1,150.00
0900Concrete-class AACUYD A A164.10$1,050.00$1,300.00$1,450.00
0910Steel reinforcement-epoxy coatedLB A A35,305$1.74$2.00$1.80
0920Precast PC I beam type 5LF A A434$662.00$700.00$710.00
0930Concrete sealingSQFT A A8,272$2.00$2.00$1.50
0940Deck drainEACH A A1$800.00$1,000.00$750.00
0950Rail system single slope - 40 inLF A A220.70$150.00$150.00$175.00
0960Mobilization for concrete surf treatmentLS A A1$500.00$1,000.00$750.00
0970Structure granular backfillCUYD A A360$56.00$75.00$70.00
0980Armored edge for concreteLF A A60$150.00$100.00$105.00
0990Foundation preparationLS A A1$10,000$85,000$35,000
1000Cyclopean stone rip rapTON A A1,128$48.00$51.00$65.00
1010Test pilesLF A A76$100.00$200.00$115.00
1020Piles-steel HP12X53LF A A483$90.00$100.00$115.00
1030Pile points-12 inEACH A A16$225.00$150.00$155.00
1040Concrete-class ACUYD A A55$865.00$950.00$1,155.00
1050Concrete-class AACUYD A A144.60$1,050.00$1,300.00$1,455.00
1060Steel reinforcement-epoxy coatedLB A A30,375$1.75$2.00$1.80
1070Precast PC I beam type 5LF A A386$712.00$700.00$795.00
1080Concrete sealingSQFT A A7,235$2.00$2.00$1.50
1090Deck drainEACH A A1$800.00$1,000.00$750.00
1100Rail system single slope - 40 inLF A A196$150.00$150.00$180.00
1110Mobilization for concrete surf treatmentLS A A1$500.00$1,000.00$750.00
1120Structure granular backfillCUYD A A366$56.00$75.00$65.00
1130Armored edge for concreteLF A A61.10$150.00$100.00$105.00
1140Foundation preparationLS A A1$10,000$85,000$35,000
1150Cyclopean stone rip rapTON A A1,290$48.00$51.00$65.00
1160Test pilesLF A A57$115.00$200.00$115.00
1170Piles-steel HP12X53LF A A356$105.00$100.00$115.00
1180Pile points-12 inEACH A A16$225.00$150.00$155.00
1190Concrete-class ACUYD A A56.80$850.00$950.00$1,125.00
1200Concrete-class AACUYD A A163.70$1,050.00$1,300.00$1,475.00
1210Steel reinforcement-epoxy coatedLB A A34,962$1.75$2.00$1.80
1220Precast PC I beam type 5LF A A462$660.00$700.00$795.00
1230Concrete sealingSQFT A A8,577$2.00$2.00$1.50
1240Deck drainEACH A A1$800.00$1,000.00$750.00
1250Rail system single slope - 40 inLF A A234$150.00$150.00$180.00
1260Mobilization for concrete surf treatmentLS A A1$500.00$1,000.00$750.00
1270MobilizationLS A A1$164,739$200,000$250,000
1280DemobilizationLS A A1$66,787$74,000$99,485
KYTC contract 25-1317: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy