KYTC contract 25-1317 bid tabulation
GRADE, DRAIN & SURFACE WITH BRIDGE KY 52. Let by Kentucky Transportation Cabinet on July 24, 2025. 3 bids received; low bid $4,519,238 by Frederick & May Construction Co, -32% against the engineer's estimate of $6,602,282.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 128
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $4,519,238 | Low | -32% |
| 2 | Bush & Burchett Inc | $5,193,647 | +15% | -21% |
| 3 | Walker Construction & Materials LLC | $5,678,765 | +26% | -14% |
Engineer's estimate: $6,602,282.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Bush & Burchett Inc | 3. Walker Construction & Materials LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 2,287 | $41.85 | $41.85 | $41.85 |
| 0020 | Traffic bound base | TON A A | 500 | $34.00 | $40.00 | $40.00 |
| 0030 | Crushed aggregate size no 2 | TON A A | 2,403 | $38.00 | $40.00 | $45.00 |
| 0040 | Asphalt seal aggregate | TON A A | 83 | $130.00 | $130.00 | $130.00 |
| 0050 | Asphalt seal coat | TON A A | 10 | $800.00 | $800.00 | $800.00 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 416 | $149.35 | $149.35 | $149.35 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 1,380 | $144.35 | $144.35 | $144.35 |
| 0080 | CL2 asph surf 0.38D PG64-22 | TON A A | 906 | $149.35 | $149.35 | $149.35 |
| 0090 | Asphalt pave milling & texturing | TON A A | 3,976 | $28.65 | $28.65 | $28.65 |
| 0100 | Joint adhesive | LF A A | 1,725 | $3.50 | $3.50 | $3.50 |
| 0110 | Asphalt material for tack non-tracking | TON A A | 4 | $300.00 | $300.00 | $300.00 |
| 0120 | Entrance pipe-18 in | LF A A | 54 | $50.00 | $85.00 | $100.00 |
| 0130 | Culvert pipe-18 in | LF A A | 85 | $85.00 | $100.00 | $250.00 |
| 0140 | Pipe culvert headwall-18 in | EACH A A | 1 | $1,600.00 | $1,500.00 | $2,575.00 |
| 0150 | Safety box inlet-18 in DBL SDB-5 | EACH A A | 1 | $6,000.00 | $8,000.00 | $8,000.00 |
| 0160 | Delineator for guardrail BI directional white | EACH A A | 59 | $12.00 | $12.00 | $12.00 |
| 0170 | Barricade-type III | EACH A A | 4 | $100.00 | $200.00 | $160.00 |
| 0180 | Temp ditch | LF A A | 1,200 | $1.00 | $2.00 | $0.50 |
| 0190 | Clean temp ditch | LF A A | 600 | $0.10 | $1.00 | $0.25 |
| 0200 | Roadway excavation | CUYD A A | 17,820 | $8.00 | $15.00 | $18.00 |
| 0210 | Embankment in place | CUYD A A | 12,962 | $5.00 | $18.00 | $1.00 |
| 0220 | Water | MGAL A A | 25 | $1.00 | $100.00 | $1.00 |
| 0230 | Guardrail terminal section no 1 | EACH A A | 6 | $85.00 | $85.00 | $85.00 |
| 0240 | Guardrail end treatment type 1 | EACH A A | 6 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0250 | Guardrail end treatment type 7 | EACH A A | 12 | $1,700.00 | $1,700.00 | $1,700.00 |
| 0260 | Temp guardrail | LF A A | 2,150 | $10.50 | $10.50 | $10.50 |
| 0270 | Right-of-way monument type 1 | EACH A A | 17 | $200.00 | $200.00 | $250.00 |
| 0280 | Witness post | EACH A A | 17 | $200.00 | $150.00 | $200.00 |
| 0290 | Channel lining class II | TON A A | 210 | $45.00 | $45.00 | $55.00 |
| 0300 | Channel lining class III | TON A A | 1,984 | $46.00 | $50.00 | $50.00 |
| 0310 | Clearing and grubbing | LS A A | 1 | $15,000 | $32,000 | $150,000 |
| 0320 | Temporary signs | SQFT A A | 400 | $16.00 | $15.00 | $14.84 |
| 0330 | Object marker type 2 | EACH A A | 12 | $185.00 | $185.00 | $200.00 |
| 0340 | Edge key | LF A A | 44 | $44.15 | $44.15 | $44.15 |
| 0350 | Fabric-geotextile class 1 | SQYD A A | 5,850 | $2.25 | $2.00 | $2.00 |
| 0360 | Fabric-geotextile class 2 | SQYD A A | 2,000 | $2.00 | $2.00 | $2.00 |
| 0370 | Fabric-geotextile class 1A | SQYD A A | 4,875 | $3.25 | $4.00 | $4.50 |
| 0380 | Fabric-geotextile class 2 for pipe | SQYD A A | 133 | $2.00 | $2.00 | $2.00 |
| 0390 | Maintain & control traffic | LS A A | 1 | $65,500 | $30,000 | $75,000 |
| 0400 | Diversions (by-pass detours) | LS A A | 1 | $160,000 | $125,000 | $250,000 |
| 0410 | Diversions (by-pass detours) | LS A A | 1 | $60,000 | $40,000 | $95,000 |
| 0420 | Diversions (by-pass detours) | LS A A | 1 | $60,000 | $55,000 | $95,000 |
| 0430 | Portable changeable message sign | EACH A A | 2 | $9,000.00 | $9,000.00 | $9,200.00 |
| 0440 | Mobilization for mill & text | LS A A | 1 | $22,500 | $22,500 | $22,500 |
| 0450 | Edgeline rumble strips | LF A A | 3,560 | $1.00 | $1.10 | $1.10 |
| 0460 | Temp silt fence | LF A A | 1,200 | $2.00 | $4.00 | $3.85 |
| 0470 | Silt trap type A | EACH A A | 12 | $50.00 | $200.00 | $100.00 |
| 0480 | Silt trap type B | EACH A A | 12 | $50.00 | $200.00 | $100.00 |
| 0490 | Silt trap type C | EACH A A | 12 | $50.00 | $200.00 | $100.00 |
| 0500 | Clean silt trap type A | EACH A A | 12 | $10.00 | $50.00 | $10.00 |
| 0510 | Clean silt trap type B | EACH A A | 12 | $10.00 | $50.00 | $10.00 |
| 0520 | Clean silt trap type C | EACH A A | 12 | $10.00 | $50.00 | $10.00 |
| 0530 | Staking | LS A A | 1 | $25,000 | $18,000 | $50,000 |
| 0540 | Temp signal 2 phase | EACH A A | 1 | $40,000 | $15,000 | $40,000 |
| 0550 | Erosion control blanket | SQYD A A | 11,535 | $2.05 | $2.05 | $2.05 |
| 0560 | Temp mulch | SQYD A A | 38,000 | $0.33 | $0.33 | $0.33 |
| 0570 | Temp seeding and protection | SQYD A A | 28,500 | $0.35 | $0.35 | $0.35 |
| 0580 | Initial fertilizer | TON A A | 6 | $950.00 | $950.00 | $950.00 |
| 0590 | Maintenance fertilizer | TON A A | 6 | $1,600.00 | $1,600.00 | $1,600.00 |
| 0600 | Seeding and protection | SQYD A A | 46,000 | $0.57 | $0.57 | $0.57 |
| 0610 | Agricultural limestone | TON A A | 35 | $110.00 | $110.00 | $110.00 |
| 0620 | SBM alum sheet signs .080 in | SQFT A A | 6 | $50.00 | $50.00 | $50.00 |
| 0630 | SBM alum sheet signs .125 in | SQFT A A | 6 | $50.00 | $50.00 | $50.00 |
| 0640 | Steel post type 1 | LF A A | 203 | $25.00 | $25.00 | $25.00 |
| 0650 | Steel post mile markers | EACH A A | 2 | $275.00 | $275.00 | $275.00 |
| 0660 | Pave striping-temp paint-6 in | LF A A | 11,840 | $0.25 | $0.25 | $0.25 |
| 0670 | Pave striping-perm paint-6 in | LF A A | 6,357 | $0.45 | $0.45 | $0.45 |
| 0680 | Pave striping-dur TY 1-6 in W | LF A A | 740 | $11.00 | $11.00 | $11.00 |
| 0690 | Pave striping-dur TY 1-6 in Y | LF A A | 546 | $11.00 | $11.00 | $11.00 |
| 0700 | Fuel adjustment | DOLL A A | 6,000 | $1.00 | $1.00 | $1.00 |
| 0710 | Object marker TY 3 | EACH A A | 6 | $60.00 | $60.00 | $60.00 |
| 0720 | High slump 3000 psi grout | CUYD A A | 5 | $800.00 | $650.00 | $750.00 |
| 0730 | Longitudinal edge key | LF A A | 1,825 | $6.75 | $6.75 | $6.75 |
| 0740 | G/R steel W beam-S face (7 FT post) | LF A A | 2,400 | $29.50 | $29.50 | $29.50 |
| 0750 | Water blasting existing stripe | LF A A | 8,600 | $0.40 | $0.40 | $0.75 |
| 0760 | Enhanced silt trap | EACH A A | 3 | $5,000.00 | $600.00 | $2,000.00 |
| 0770 | Clean enhanced silt trap | EACH A A | 15 | $100.00 | $200.00 | $97.00 |
| 0780 | Thrie beam guardrail transition TL-3 | EACH A A | 12 | $4,870.00 | $3,400.00 | $4,800.00 |
| 0790 | Electronic delivery MGMT system - agg | LS A A | 1 | $100.00 | $1.00 | $1,000.00 |
| 0800 | Structure granular backfill | CUYD A A | 416 | $56.00 | $75.00 | $70.00 |
| 0810 | Armored edge for concrete | LF A A | 68.80 | $150.00 | $100.00 | $100.00 |
| 0820 | Structure excav-solid rock | CUYD A A | 245 | $80.00 | $50.00 | $70.00 |
| 0830 | Foundation preparation | LS A A | 1 | $10,000 | $85,000 | $35,000 |
| 0840 | Cyclopean stone rip rap | TON A A | 1,136 | $48.00 | $51.00 | $65.00 |
| 0850 | Test piles | LF A A | 52 | $115.00 | $200.00 | $110.00 |
| 0860 | Pre-drilling for piles | LF A A | 90 | $450.00 | $350.00 | $472.00 |
| 0870 | Piles-steel HP12X53 | LF A A | 368 | $105.00 | $100.00 | $110.00 |
| 0880 | Pile points-12 in | EACH A A | 9 | $225.00 | $150.00 | $155.00 |
| 0890 | Concrete-class A | CUYD A A | 67.70 | $795.00 | $950.00 | $1,150.00 |
| 0900 | Concrete-class AA | CUYD A A | 164.10 | $1,050.00 | $1,300.00 | $1,450.00 |
| 0910 | Steel reinforcement-epoxy coated | LB A A | 35,305 | $1.74 | $2.00 | $1.80 |
| 0920 | Precast PC I beam type 5 | LF A A | 434 | $662.00 | $700.00 | $710.00 |
| 0930 | Concrete sealing | SQFT A A | 8,272 | $2.00 | $2.00 | $1.50 |
| 0940 | Deck drain | EACH A A | 1 | $800.00 | $1,000.00 | $750.00 |
| 0950 | Rail system single slope - 40 in | LF A A | 220.70 | $150.00 | $150.00 | $175.00 |
| 0960 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,000.00 | $750.00 |
| 0970 | Structure granular backfill | CUYD A A | 360 | $56.00 | $75.00 | $70.00 |
| 0980 | Armored edge for concrete | LF A A | 60 | $150.00 | $100.00 | $105.00 |
| 0990 | Foundation preparation | LS A A | 1 | $10,000 | $85,000 | $35,000 |
| 1000 | Cyclopean stone rip rap | TON A A | 1,128 | $48.00 | $51.00 | $65.00 |
| 1010 | Test piles | LF A A | 76 | $100.00 | $200.00 | $115.00 |
| 1020 | Piles-steel HP12X53 | LF A A | 483 | $90.00 | $100.00 | $115.00 |
| 1030 | Pile points-12 in | EACH A A | 16 | $225.00 | $150.00 | $155.00 |
| 1040 | Concrete-class A | CUYD A A | 55 | $865.00 | $950.00 | $1,155.00 |
| 1050 | Concrete-class AA | CUYD A A | 144.60 | $1,050.00 | $1,300.00 | $1,455.00 |
| 1060 | Steel reinforcement-epoxy coated | LB A A | 30,375 | $1.75 | $2.00 | $1.80 |
| 1070 | Precast PC I beam type 5 | LF A A | 386 | $712.00 | $700.00 | $795.00 |
| 1080 | Concrete sealing | SQFT A A | 7,235 | $2.00 | $2.00 | $1.50 |
| 1090 | Deck drain | EACH A A | 1 | $800.00 | $1,000.00 | $750.00 |
| 1100 | Rail system single slope - 40 in | LF A A | 196 | $150.00 | $150.00 | $180.00 |
| 1110 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,000.00 | $750.00 |
| 1120 | Structure granular backfill | CUYD A A | 366 | $56.00 | $75.00 | $65.00 |
| 1130 | Armored edge for concrete | LF A A | 61.10 | $150.00 | $100.00 | $105.00 |
| 1140 | Foundation preparation | LS A A | 1 | $10,000 | $85,000 | $35,000 |
| 1150 | Cyclopean stone rip rap | TON A A | 1,290 | $48.00 | $51.00 | $65.00 |
| 1160 | Test piles | LF A A | 57 | $115.00 | $200.00 | $115.00 |
| 1170 | Piles-steel HP12X53 | LF A A | 356 | $105.00 | $100.00 | $115.00 |
| 1180 | Pile points-12 in | EACH A A | 16 | $225.00 | $150.00 | $155.00 |
| 1190 | Concrete-class A | CUYD A A | 56.80 | $850.00 | $950.00 | $1,125.00 |
| 1200 | Concrete-class AA | CUYD A A | 163.70 | $1,050.00 | $1,300.00 | $1,475.00 |
| 1210 | Steel reinforcement-epoxy coated | LB A A | 34,962 | $1.75 | $2.00 | $1.80 |
| 1220 | Precast PC I beam type 5 | LF A A | 462 | $660.00 | $700.00 | $795.00 |
| 1230 | Concrete sealing | SQFT A A | 8,577 | $2.00 | $2.00 | $1.50 |
| 1240 | Deck drain | EACH A A | 1 | $800.00 | $1,000.00 | $750.00 |
| 1250 | Rail system single slope - 40 in | LF A A | 234 | $150.00 | $150.00 | $180.00 |
| 1260 | Mobilization for concrete surf treatment | LS A A | 1 | $500.00 | $1,000.00 | $750.00 |
| 1270 | Mobilization | LS A A | 1 | $164,739 | $200,000 | $250,000 |
| 1280 | Demobilization | LS A A | 1 | $66,787 | $74,000 | $99,485 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.