Frederick & May Construction Co: KYTC bid record
Frederick & May Construction Co submitted 130 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 20 AUG 2026, and was the low bidder on 45 of them (35%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $133,669,607
- Latest bid
- 20 AUG 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 2 | 0 | 0% |
| 2020 | 21 | 6 | 29% |
| 2021 | 18 | 3 | 17% |
| 2022 | 14 | 5 | 36% |
| 2023 | 16 | 5 | 31% |
| 2024 | 28 | 9 | 32% |
| 2025 | 19 | 9 | 47% |
| 2026 | 12 | 8 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 29 | 8 | 28% |
| District 10 | 27 | 10 | 37% |
| District 9 | 15 | 7 | 47% |
| District 11 | 10 | 0 | 0% |
| District 7 | 8 | 1 | 13% |
| District 4 | 6 | 2 | 33% |
| District 6 | 3 | 1 | 33% |
| District 5 | 3 | 1 | 33% |
| District 8 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete-class A | CY | 141 | 60 (43%) | $950.00 | $1,088.01 | |
| Asphalt material for tack | TON | 61 | 59 (97%) | $10.00 | $10.00 | |
| Guardrail terminal section no 1 | EACH | 87 | 49 (56%) | $83.79 | $85.06 | |
| Maintenance fertilizer | TON | 65 | 48 (74%) | $1,200.00 | $1,248.00 | |
| Delineator for guardrail BI directional white | EACH | 82 | 46 (56%) | $14.23 | $14.19 | |
| Initial fertilizer | TON | 62 | 46 (74%) | $1,200.00 | $1,200.00 | |
| Guardrail-steel W beam-S face | LF | 67 | 45 (67%) | $36.00 | $38.00 | |
| Temp mulch | SY | 63 | 44 (70%) | $0.30 | $0.28 | |
| Steel reinforcement | LB | 95 | 43 (45%) | $1.45 | $1.85 | |
| Dga base | TON | 79 | 42 (53%) | $46.00 | $45.00 | |
| Asphalt seal coat | TON | 76 | 42 (55%) | $2,012.68 | $1,370.39 | |
| Asphalt seal aggregate | TON | 77 | 40 (52%) | $710.25 | $261.98 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Walker Construction & Materials LLC | 61 | 24 of 61 |
| Bush & Burchett Inc | 59 | 18 of 59 |
| Hinkle Construction Services LLC | 59 | 21 of 59 |
| M & M Services Co Inc | 49 | 20 of 49 |
| Jave LLC | 45 | 19 of 45 |
| Central Bridge Co LLC | 26 | 14 of 26 |
| Kay & Kay Contracting LLC | 22 | 11 of 22 |
| Haydon Bridge Company Inc | 19 | 4 of 19 |
| Mountain Enterprises Inc | 15 | 6 of 15 |
| Boca Enterprises Inc | 11 | 5 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 AUG 2026 | 26-2948 | CULVERT REPLACEMENT KY 0002 | 1 of 3 | $1,155,745 | Low, 10% under the second | |
| 20 AUG 2026 | 26-1515 | GRADE & DRAIN WITH ASPHALT SURFACE STARFIRE HAUL ROAD (CR 1390) | 2 of 4 | $15,590,980 | +2.0% | |
| 20 AUG 2026 | 26-2233 | CULVERT REPLACEMENT CULVERT REPLACMENTS ON KY 40 IN MARTIN COUNTY | 1 of 5 | $342,911 | Low, 45% under the second | |
| 21 MAY 2026 | 26-1511 | SLIDE REPAIR KY 7 | 1 of 3 | $3,936,305 | Low, 1.0% under the second | |
| 21 MAY 2026 | 26-1513 | GRADE & DRAIN WITH BRIDGE JCPS ACCESS ROAD | 1 of 4 | $6,362,726 | Low, 9.0% under the second | |
| 23 APR 2026 | 26-5411 | BRIDGE REPLACEMENT CR 1464 | 1 of 8 | $685,508 | Low, 8.0% under the second | |
| 23 APR 2026 | 26-5413 | BRIDGE REPLACEMENT KY 1102 | 3 of 8 | $712,223 | +14% | |
| 26 MAR 2026 | 26-1508 | GRADE & DRAIN WITH ASPHALT SURFACE BROWN RIDGE RD. (KY 32) | 1 of 4 | $9,558,706 | Low, 6.0% under the second | |
| 19 FEB 2026 | 26-5405 | BRIDGE REPLACEMENT CR 1380 | 4 of 5 | $1,092,527 | +56% | |
| 19 FEB 2026 | 26-5404 | BRIDGE REPLACEMENT KY 32 | 1 of 7 | $2,049,227 | Low, 4.0% under the second | |
| 29 JAN 2026 | 26-1103 | ASPHALT SURFACE WITH GRADE & DRAIN WENDELL H. FORD AIRPORT ACCESS ROAD (NEW ROUTE) | 2 of 2 | $17,360,146 | +14% | |
| 29 JAN 2026 | 26-1501 | GRADE & DRAIN WITH ASPHALT SURFACE TAYLOR RD. (KY 3504) | 1 of 2 | $410,022 | Low, 3.0% under the second | |
| 11 DEC 2025 | 25-5399 | BRIDGE REPLACEMENT KY 292 | 4 of 5 | $3,677,505 | +16% | |
| 11 DEC 2025 | 25-1037 | BRIDGE WITH GRADE, DRAIN & SURFACE CR-1169 | 3 of 5 | $1,418,175 | +14% | |
| 20 NOV 2025 | 25-1125 | GRADE & DRAIN WITH ASPHALT SURFACE KY 550 (COMBS ROAD) | 1 of 3 | $761,664 | Low, 1.0% under the second | |
| 23 OCT 2025 | 25-1025 | GRADE & DRAIN WITH ASPHALT SURFACE KY-7 | 1 of 3 | $5,051,335 | Low, 5.0% under the second | |
| 23 OCT 2025 | 25-3123 | GRADE & DRAIN KY 466 (KY 466) | 2 of 7 | $337,052 | +15% | |
| 23 OCT 2025 | 25-1319 | GRADE & DRAIN WITH ASPHALT SURFACE US 421 | 2 of 2 | $1,719,585 | +5.0% | |
| 23 OCT 2025 | 25-2931 | BRIDGE WITH GRADE & DRAIN STURGEON CREEK BRIDGE (KY 1334) | 1 of 4 | $781,100 | Low, 11% under the second | |
| 25 SEP 2025 | 25-5389 | BRIDGE REPLACEMENT CR 1110 | 4 of 6 | $754,450 | +14% | |
| 21 AUG 2025 | 25-1021 | GRADE & DRAIN WITH ASPHALT SURFACE LITTLE FORK ROAD(KY-613) | 2 of 4 | $1,114,375 | +20% | |
| 21 AUG 2025 | 25-2988 | BRIDGE REPLACEMENT STATE HWY 3630 (KY 3630) | 7 of 7 | $823,896 | +27% | |
| 24 JUL 2025 | 25-5383 | BRIDGE REPLACEMENT KY 539 | 1 of 4 | $1,554,094 | Low, 11% under the second | |
| 24 JUL 2025 | 25-1317 | GRADE, DRAIN & SURFACE WITH BRIDGE KY 52 | 1 of 3 | $4,519,238 | Low, 15% under the second | |
| 24 JUL 2025 | 25-1014 | ASPHALT SURFACE WITH GRADE & DRAIN CHESTNUT RIDGE ROAD | 1 of 2 | $7,472,773 | Low, 4.0% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way