KYTC contract 26-2948 bid tabulation
CULVERT REPLACEMENT KY 0002. Let by Kentucky Transportation Cabinet on August 20, 2026. 3 bids received; low bid $1,155,745 by Frederick & May Construction Co, -22% against the engineer's estimate of $1,474,002.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 AUG 2026
- Pay items
- 67
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $1,155,745 | Low | -22% |
| 2 | Walker Construction & Materials LLC | $1,272,740 | +10% | -14% |
| 3 | Hinkle Construction Services LLC | $1,648,910 | +43% | +12% |
Engineer's estimate: $1,474,002.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Walker Construction & Materials LLC | 3. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 583.40 | $56.80 | $56.80 | $60.00 |
| 0020 | Traffic bound base | TON A A | 60.80 | $28.00 | $50.00 | $67.00 |
| 0030 | Asphalt seal aggregate | TON A A | 25.30 | $225.25 | $225.25 | $237.00 |
| 0040 | Asphalt seal coat | TON A A | 3.02 | $1,435.00 | $1,435.00 | $1,510.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 306.70 | $184.50 | $184.50 | $194.00 |
| 0060 | CL2 asph base 1.00D PG64-22 | TON A A | 1,293.50 | $166.85 | $166.85 | $176.00 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 341.20 | $184.50 | $184.50 | $194.00 |
| 0080 | Asphalt material for tack | TON A A | 1.73 | $750.00 | $750.00 | $790.00 |
| 0090 | Asphalt pave milling & texturing | TON A A | 461.90 | $48.80 | $48.80 | $51.00 |
| 0110 | Crushed aggregate size no 2 | TON A A | 50 | $28.00 | $50.00 | $38.00 |
| 0120 | Crushed aggregate size no 23 | TON A A | 21 | $28.00 | $85.00 | $38.00 |
| 0130 | Delineator for G/R BI directional white | EACH A A | 6 | $13.00 | $13.00 | $13.00 |
| 0140 | Barricade-type III | EACH A A | 3 | $100.00 | $160.00 | $150.00 |
| 0150 | Temp ditch | LF A A | 613 | $0.10 | $0.50 | $1.70 |
| 0160 | Clean temp ditch | LF A A | 307 | $0.10 | $0.25 | $0.01 |
| 0170 | Roadway excavation | CUYD A A | 2,815 | $12.00 | $21.00 | $56.00 |
| 0180 | Water | MGAL A A | 60 | $1.00 | $1.00 | $0.01 |
| 0190 | G/R-W beam-S face TL-3 | LF A A | 300 | $42.00 | $42.00 | $42.00 |
| 0200 | G/R end treatment type 1 | EACH A A | 3 | $3,300.00 | $3,300.00 | $4,300.00 |
| 0210 | G/R end treatment type 4A | EACH A A | 1 | $3,800.00 | $3,800.00 | $4,315.00 |
| 0220 | Right-of-way monument type 1 | EACH A A | 6 | $300.00 | $200.00 | $360.00 |
| 0230 | Witness post | EACH A A | 6 | $300.00 | $200.00 | $36.00 |
| 0240 | Channel lining class III | TON A A | 527 | $35.00 | $50.00 | $50.00 |
| 0250 | Clearing and grubbing | LS A A | 1 | $32,442 | $35,000 | $17,450 |
| 0260 | Temporary signs | SQFT A A | 336 | $9.50 | $8.50 | $9.00 |
| 0270 | Edge key | LF A A | 32 | $55.75 | $55.75 | $60.00 |
| 0280 | Maintain & control traffic | LS A A | 1 | $10,000 | $7,500.00 | $87,500 |
| 0290 | Portable changeable message sign | EACH A A | 3 | $3,200.00 | $2,000.00 | $4,940.00 |
| 0300 | Mobilization for mill & text | LS A A | 1 | $7,500.00 | $7,500.00 | $7,900.00 |
| 0310 | Edgeline rumble strips | LF A A | 2,450 | $0.05 | $1.90 | $2.00 |
| 0320 | Temp silt fence | LF A A | 613 | $2.50 | $3.50 | $8.00 |
| 0330 | Silt trap type A | EACH A A | 3 | $25.00 | $250.00 | $174.00 |
| 0340 | Silt trap type B | EACH A A | 3 | $25.00 | $250.00 | $387.00 |
| 0350 | Silt trap type C | EACH A A | 3 | $25.00 | $250.00 | $540.00 |
| 0360 | Clean silt trap type A | EACH A A | 3 | $10.00 | $25.00 | $174.00 |
| 0370 | Clean silt trap type B | EACH A A | 3 | $10.00 | $25.00 | $174.00 |
| 0380 | Clean silt trap type C | EACH A A | 3 | $10.00 | $25.00 | $244.00 |
| 0390 | Staking | LS A A | 1 | $10,000 | $5,500.00 | $14,475 |
| 0400 | Remove structure | LS A A | 1 | $5,000.00 | $20,000 | $19,840 |
| 0410 | Erosion control blanket | SQYD A A | 1,774 | $4.50 | $4.50 | $3.25 |
| 0420 | Temp mulch | SQYD A A | 9,680 | $0.56 | $0.56 | $0.50 |
| 0430 | Temp seeding and protection | SQYD A A | 7,260 | $0.85 | $0.85 | $0.50 |
| 0440 | Initial fertilizer | TON A A | 0.50 | $2,200.00 | $2,200.00 | $1,740.00 |
| 0450 | Maintenance fertilizer | TON A A | 0.30 | $2,200.00 | $2,200.00 | $1,740.00 |
| 0460 | Seeding and protection | SQYD A A | 8,302 | $1.05 | $1.05 | $0.75 |
| 0470 | Agricultural limestone | TON A A | 6.20 | $145.00 | $145.00 | $140.00 |
| 0480 | Pave striping-temp paint-4 in | LF A A | 5,350 | $0.18 | $0.18 | $0.20 |
| 0490 | Pave striping-perm paint-4 in | LF A A | 5,350 | $0.20 | $0.20 | $0.25 |
| 0500 | Joint adhesive | LF A A | 1,450 | $3.75 | $3.75 | $4.00 |
| 0510 | Object marker TY 3 | EACH A A | 4 | $70.00 | $70.00 | $86.00 |
| 0520 | Sawcut pavement | LF A A | 78 | $5.00 | $7.00 | $10.00 |
| 0530 | Entrance pipe-15 in | LF A A | 50 | $60.00 | $80.00 | $87.00 |
| 0540 | Culvert pipe-18 in | LF A A | 46.60 | $80.00 | $170.00 | $75.00 |
| 0550 | Culvert pipe-24 in | LF A A | 40 | $115.00 | $300.00 | $246.00 |
| 0560 | Metal end section TY 1-15 in | EACH A A | 1 | $3,500.00 | $2,900.00 | $5,064.00 |
| 0570 | Sloped and parallel headwall-18 in | EACH A A | 1 | $2,600.00 | $3,200.00 | $2,526.00 |
| 0580 | S & F box inlet-outlet-24 in | EACH A A | 1 | $4,000.00 | $5,400.00 | $4,420.00 |
| 0590 | Drop box inlet type 1 | EACH A A | 1 | $4,500.00 | $5,200.00 | $18,365 |
| 0600 | Drop box inlet type 15 | EACH A A | 1 | $2,800.00 | $5,200.00 | $2,860.00 |
| 0610 | Fabric-geotextile class 2 for pipe | SQYD A A | 71 | $2.00 | $2.00 | $2.00 |
| 0620 | Structure excav-solid rock | CUYD A A | 13 | $100.00 | $100.00 | $400.00 |
| 0630 | Foundation preparation | LS A A | 1 | $6,000.00 | $25,000 | $50,190 |
| 0640 | Concrete-class A | CUYD A A | 220.30 | $850.00 | $995.00 | $1,515.00 |
| 0650 | Steel reinforcement | LB A A | 17,028 | $2.00 | $2.00 | $1.95 |
| 0660 | Steel reinforcement-epoxy coated | LB A A | 16,768 | $2.25 | $2.00 | $2.05 |
| 0670 | Utility relocation | LS A A | 1 | $234,165 | $234,165 | $253,900 |
| 0680 | Demobilization | LS A A | 1 | $17,080 | $20,000 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of August 20, 2026. Compiled by Mirage Metrics.